SP4702-21-R-0020.pdf
PDF 2 MB Posted
- Attached to
- Project: CSC-20007 Maintenance & Repair Building 22 Federal contract opportunity
- Solicitation number
- SP4702-21-R-0020
- Issued by
- Defense Logistics Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 03-SP4702-21-R-0020-SF30.pdf | ||
| Questions-Answers for SP4702-21-R-0020.pdf | ||
| Amendment 03 Continue sheet SF30.pdf | ||
| Amendment 02-SP4702-21-R-0020-SF30.pdf | ||
| Amendment 02 Continue sheet SF30.pdf | ||
| Amendment 01-SP4702-21-R-0020-SF30 (1).pdf | ||
| Continue sheet SF30.pdf | ||
| Revised SPEC 20007.pdf | ||
| Attachment 06-Drawings 3-1708 CSC-20007.pdf | ||
| Attachment 04-ENG FORM 4025-R.pdf | ||
| Attachment 09-Contractor Access Badge Request.xlsx | XLSX spreadsheet | |
| Attachment 02-ENG FORM 93.pdf | ||
| Attachment 03-DSCC Excavation Permit.pdf | ||
| Attachment 05-Bid forms of CSC-20007.xlsx | XLSX spreadsheet | |
| Attachment 01-Wage Rate DOL.pdf | ||
| Attachment 08-CSC-20006 NEPA Review Checklist.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
CODE 8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
SP4702-21-R-0020
DLA CONTRACTING SERVICES OFFICE, COLUMBUS
ATTN: DCSO-C
P. O. Box 3990 Columbus, OH 43218-3990
SEE TABLE OF CONTENTS PAGE 3 0F 200
DEFENSE SUPPLY CENTER, COLUMBUS
ATTN: DCSO-C
P. O. Box 3990 Columbus, OH 43218-3990 For Courier Services, offers must be address to:
3990 East Broad Street, Columbus, OH 43213-1152.
5. REQUISITION/PURCHASE REQUEST NUMBER
SP4702
William M. Hurley 614-692-0439
6. PROJECT NUMBER
CSC-20007 M&R Building 22
1 20008/03/2021 local time 09/07/2021
1:00 PM
(See Clause (FAR 52.211-10
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
TABLE OF CONTENTS
SECTION A. . . . . . . . . . Solicitation/Table of Contents – STANDARD FORM 1442
SECTION B. . . . . . . . Supplies or Services and Prices/Costs
SECTION C. . . . . . . . . . Descriptions/Specifications/Performance Work Statement
SECTION D. . . . . . . . . . Packaging and Marking (Not Applicable). . . . . . . . . . . . . . . . . . . . . . N/A
SECTION E. . . . . . . . . . Inspection and Acceptance
SECTION F. . . . . . . . . . Deliveries or Performance
SECTION G. . . . . . . . . Contract Administration Data (Not Applicable) . . . . . . . . . . . . . . . . . . N/A
SECTION H. . . . . . . . Special Contract Requirements
SECTION I. . . . . . . . . . Contract Clauses
SECTION J. . . . . . . . . . List of Documents, Exhibits, and Other Attachments. . . . . . . ., . . N/A
SECTION
K
Representations, Certifications, and Other Statements of Offerors.. .
SECTION
L
Instructions, Conditions and Notices to Offerors
SECTION M. . . . . . . . . Evaluation Factors for Award
Attachment 1 DOL Wage Rate Determination
Attachment 2 Eng. Form 93
Attachment 3 Excavation Permit
Attachment 4 ENG Form 4025-R
Attachment 5 Construction Cost Bid Forms
Attachment 6 Drawings 3-1706
Attachment 7 Submittal Register
Attachment 8 CSC-2006 NEPA Review Checklist
Attachment 9 Contractor Access & Badge request
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION OF SERVICES
The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-20007 M&R Building 22), contract drawings No. 3-1708, complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.
TERM OF CONTRACT
The period of performance for this project is 90 calendar days after the issuance of the Notice to Proceed.
OFFER FOR SERVICES
CONRACT
LINE TEM
NO.(CLIN)
SUPPLIES/SERVICES QUANTITY UNIT TOTAL AMOUNT
0001 CSC-20007 M&R Building 22, FY21
1 JOB $
ALL CLIN PRICING SHALL BE INCLUSIVE OF OVERHEAD, PROFIT AND BONDING COSTS
Note 1: The offeror shall complete the following columns on this page: Unit Price and Total Amount.
All costs, including bid bond, overhead and profit shall be included in the Total Amount.
Note 2: The offeror shall accept any amendments generated from this solicitation and shall complete the Construction Cost Estimate Form as part of its proposal submission, in order to be considered complete. Incomplete proposals will not be considered technically acceptable.
Note 3: As stated in clause 52.236-27, there will be a site visit on August 12, 2021 at 10:00 AM local time. Attendance at this site visit is optional for any contractor wishing to submit an offer in response to this solicitation. Please see clause for details.
Note 4: Quantity and unit price (Section B) will be flipped at the award stage for invoicing purposes.
When invoicing in Wide Area Work Flow, reverse the quantity and unit price as shown above on each CLIN. Failure to do so will result in a delay in payment of the invoice as the invoice will have to be rejected and resubmitted. If you have any questions regarding this matter, contact your WAWF representative
Under the authority of FAR Part 16.2, the DLA Contracting Services Office – Columbus intends to award a Firm Fixed Price contract for construction services to repair and seal interior concrete floors within Buildings 9 and 30 on the Defense Supply Center Columbus (DSCC) in Columbus, Ohio.
FAR Part 36 “Construction and Architect – Engineer Contracts” and FAR Part 15 “Contracting by Negotiation” procedures and regulations will be utilized.
POINTS OF CONTACT FOR THIS PROJECT/ACQUISITION
Acquisition Specialist/Officer: William M. Hurley
BLDG 20, A2N117
3990 E Broad Street Columbus, OH 43218-3990
(614) 692-0439 william.hurley@dla.mil
Project Manager: Sinan Falah BLDG 308 3990 E Broad Street Columbus, OH 43218-3990 sinan.falah@dla.mil
Contracting Officer Representative: John Patrick
BLDG 308
3990 E Broad Street Columbus, OH 43218-3990
(614) 692-3645 John.Patrick@dla.mil
ASSISTANCE IN SUBMITTING DOCUMENTS/INVOICES INTO THE WIDE AREA WORKFLOW
(WAWF)
If you need instruction on how to submit an invoice to the Government in WAWF, follow the below instructions. It is not necessary to log into WAWF to access the training.
1. Click on the Help/Training folder located on the top right hand corner WAWF home page.
https://wawf.eb.mil/xhtml/unauth/home/login.xhtml#
2. Go to Training
3. Click on Web based Training
4. Click on iRAPT
5. Go to Roles and click on vendor
6. Click Vendor creating documents in iRAPT
7. Under Document, Scroll down through the documents list and selected the document you wish to learn about. In this case the document you should select is The 2 in 1 (Services Only).
You find both a video and step by step instructions on how to complete any the form and be able to submit your invoice into WAWF.
After reviewing this information and you are still having problems, you can call the Defense Finance and Accounting Services (DFAS) Help Desk at 1-800-756-4571 Prompt 2. Their hours of operation are between 7:30 AM to 4:30 PM; Monday to Friday Eastern Standard Time.
Assistance may also be available to assist in the submission of the invoice by contacting the Procurement Technical Assistance Center (PTAC) office located in your State. There is an office for your county. Their website for further information is:
http://www.dla.mil/HQ/SmallBusiness/PTAC.aspx#DDL_Lines mailto:william.hurley@dla.mil mailto:mohammad.
mailto:ali@dla.mil mailto:matthew.foreman@dla.mil http://www.dla.mil/HQ/SmallBusiness/PTAC.aspx#DDL_Lines
(X) 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995), ALT I (FEB 1995) - FAR
(a) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Offerors are invited to attend an organized site visit by reporting to the Facilities Engineer, Building 308, Defense Supply Center (DSCC), Columbus, Ohio on 12th of August, 2021(date), at 10:00 AM (time).
LIST OF ACCEPTABLE ID FOR VISITOR PROCESSING
The following forms of ID are acceptable for visitor processing and access to enter the DSCC. Any two forms below can be used to meet the new Visitor Policy for access.
1. Federally-issued Identification.
a. U.S. Passport.
b. U.S. Passport Card.
c. PIV or Federally-issued Personal Identification Verification – Interoperable (PIV-I) Cards.
d. Driver’s License issued by the U.S. Department of State.
e. Border Crossing Card (Form DSP-150).
f. DHS “Trusted Traveler” Cards (Global Entry, NEXUS, SENTRI, FAST).
g. U.S. Military ID (all members of the U.S. Armed Forces [including retirees and dependent ID card holders]) and veterans.
h. Veterans Health Identification Card issued by the U. S. Department of Veterans Affairs.
i. U.S. Permanent Resident Card (Form I-551).
j. U.S. Certificate of Naturalization or Certificate of Citizenship (Form N-550).
k. Employment Authorization Document issued by DHS (Form I-766).
l. U.S. Refugee Travel Document or other travel document or evidence of immigration status issued by DHS containing a photograph (Permit to Re-enter Form I-327 and Refugee Travel Document Form I-571).
m. Transportation Worker Identification Credential (TWIC).
n. Merchant Mariner Card issued by DHS/United States Coast Guard (USCG).
2. State-issued Identification.
a. A driver’s license or identification card issued by a state that meets the REAL ID standards or has an extension.
b. State-issued Enhanced Drivers Licenses (EDLs).
c. Interim Driver’s License6 issued by a state that meets the REAL ID standards or has an extension.
3. Other
a. Native American Tribal Photo ID.
b. Foreign government-issued passport.
c. PIV-I cards (issued by non-Federal Government entities).
REAL ID ACT
Information on the REAL ID Act of 2005 and a current compliance status list of States/Territories can be found at https://www.dhs.eov/current-status-states-territories.
All visitors and delivery truck drivers must be identity proofed in accordance with DSCCM 5720.003, Access Control, before they can access DSCC. The REAL ID Act identifies which driver licenses can be used for identity proofing individuals that are requesting access. Individuals from compliant States will be processed as normal. Individuals from non-compliant States will be processed as http://www.dhs.eov/current-status-states-territories normal if they can also produce one of the alternate forms of identification listed in the below section titled, “LIST OF ALTERNATE FORMS OF IDENTIFICATION.”
If a visitor or delivery truck driver presents a non-compliant driver license AND cannot produce an identifying document listed in the below section, then the following procedures will be followed:
1. Visitor: DSCC Visitor Control Center (VCC) personnel will conduct a law enforcement background check using the visitor's driver license. Visitors presenting a driver license from a non-compliant state, if not entered in Visitor Notification System (VNS), will be turned away. If entered into VNS and cleared, VCC personnel will contact the visitor's sponsor listed in VNS and the sponsor will meet them at the Visitor Control Center (VCC) Building 61 where they will verify the visitor to VCC personnel. At that time a visitor DBIDS pass will be issued. The sponsor escorts the visitor in buildings for the duration of time they are on DSCC.
2. Delivery Truck Driver: Delivery truck drivers will be processed IA W DSCCM 5730.003, Enclosure 9, Delivery Control at the James Road Gate inspection area. Truck drivers presenting a driver license from a non-compliant state, if not entered in VNS, will be turned away. If entered into VNS, DSCC Police will escort the delivery truck to the central receiving facility (CRF). The sponsor will be contacted and have responsibility for escorting the delivery truck for the duration of time they are on DSCC.
LIST OF ALTERNATE FORMS OF IDENTIFICATION
(Extract from DSCCM 5720.003, Appendix 2, to Enclosure 3)
1. ACCEPT ABLE IDENTIFICATION DOCUMENTS. Applicants shall provide a valid and original form of identification from those listed in Paragraph 2 for the purpose of proofing identity for issuance of a visitor pass or ID credential. Prior to acceptance, personnel processing an applicant will screen documents for evidence of tampering, counterfeiting, or other alteration. Documents that appear questionable (e.g., having damaged laminates) or otherwise altered will not be accepted. Altered documents will be held until appropriate authorities are notified, and disposition procedures are authorized.
2. ACCEPT ABLE IDENTITY SOURCE DOCUMENTS. All documents must be current.
a. U.S. Passport or U.S. Passport Card.
c. Permanent Resident Card or Alien Registration Receipt Card (INS Form 1-551).Foreign passport with a temporary (1-551) stamp or temporary (1-551) printed notation on a machine-readable immigrant visa.
d. Foreign passport with a current arrival-departure record (INS Form 1-94) bearing the same names as the passport and containing an endorsement of the alien's nonimmigrant status, if that status authorizes the alien to work for the employer.
e. Employment authorization document that contains a photograph (INS Form 1-766).
f. In the case of a non-immigrant alien authorized to work for a specific employer incident to status, a foreign passport with INS Form 1-94 or INS Form I-94A bearing the same name as the passport and containing an endorsement of the alien's non-immigrant status, as long as the endorsement has not yet expired and the proposed employment is not in conflict with any restrictions or limitations identified on the form.
g. Driver's license or identification card issued by a State or outlying possession of the United States, provided it contains a photograph and biographic information such as name, date of birth, gender, height, eye color, and address. A suspended license is still valid for identification purposes; a revoked or expired license is not.
h. Identification card issued by Federal, State, or local government agencies, provided it contains a photograph and biographic information such as name, date of birth, gender, height, eye color, and address.
i. School identification card with a photograph.
j. Voter's registration card.
k. U.S. Military ID card or draft record.
l. Military dependent's ID card.
m. U.S. Coast Guard Merchant Mariner Card.
n. Native American tribal document.
o. Driver's license issued by a Canadian government authority.
p. For persons under the age of 18 who are unable to present a document listed in subparagraphs 2.a. through p. may produce a current:
(1) School record or report card.
(2) Clinic, doctor, or hospital record.
(3) Day care or nursery school record.
GREEN PROCUREMENT
All products proposed for use in, or requisitioned under this contract must conform to federal Green Procurement regulations as they relate to the Environmental Protection Agency's (EPA) Comprehensive Procurement Guidelines. These products include Energy Star or Federal Energy Management Program designated electronics; United States Department of Agriculture bio-based designated products; Electronic Product Assessment Tool designated electronics; alternative fuels and fuel efficiency; and nonozone depleting substances. Such products must meet contract performance requirements, taking into consideration price, competition, and availability factors.
ANTITERRORISM TRAINING BY CONTRACTOR
(a) In accordance with DOD Instruction 2000.16 and DLA Instruction 6308, Level 1 Antiterrorism (AT Training must be completed on an annual basis by all employees of the contractor performing under this requirement and may be accomplished by one or two means:
1. Under the instruction of a qualified Level 1 AT Awareness Instructor
2. Competition of a DoD-sponsored certified computer or web-based distance learning instruction for Level 1 AT Awareness, which can be found at http://jko.jten.mil/courses/atl1/launch.html for non_CAC holders and https://jkodirect.jten.mil/Altas2/faces/page/login/Login.seams for CAC holders.
(b) Specifically, only those employees whose contract performance requires them to have routine access to federally-controlled facility and/or routine access to a federally-controlled information system must take the training. Also note that the contractor shall coordinate with the Contracting Officer for those employees that require access only intermittently or for a period of less than six months, to determine if the training is required.
(c) Upon initial hire the contractor will contact the onsite DLA Antiterrorism Officer (ATO) to schedule the initial training.
(d) The Certificates are valid for one year; therefore, training shall be completed every year for the duration of the contract.
http://jko.jten.mil/courses/atl1/launch.html
(e) The contractor shall maintain copies of all training certificates for the duration of the contract and may be required to supply copies of the training certificates to the Contracting Officer no more than biannually for submission to the ATO.
M&R CDC
PROJECT CSC-20007
DEFENSE SUPPLY CENTER COLUMBUS
3990 EAST BROAD STREET
COLUMBUS, OHIO 43216-5000
05/20/2021
TABLE OF CONTENTS PAGES
Section 01 35 31 Safety, Security, and Fire Provisions 18 Section 01 33 00 Submittals 19 Section 01 45 00.10 20 Quality Control For Minor construction 11 Section 01 50 03 General Statement of Work 7 Section 01 78 00 Closeout Submittals 12 Section 01 78 23 Operation And Maintenance Data 15 Section 09 29 00 Gypsum Board 8 Section 09 90 00 Paints And Coatings 18 Section 22 00 00 Plumbing, General Purpose 29
SECTION 01-35-31
(REV 05/22/2013)
SECTION 01-35-31
SECURITY, SAFETY AND FIRE PROVISIONS
(Rev 05/05/2021)
The following provisions are general in nature and tailored to the Defense Supply Center Columbus Installation. They cover items regarding access, as well as requirements to maintain a safe and secure environment for all individuals on the Installation. Not all of these provisions will apply to every solicitation or contract. Any questions regarding the applicability of the following provisions should be directed to the Contracting Officer or designee.
Any Government publications referenced herein will be provided upon request.
1.0 SECURITY
1.0.1 All contractors must abide by all security/force protection policies in effect on the DSCC Installation. Security/force protection procedures on the installation may include, but are not limited to, personnel screening, installation access and ID procedures, vehicle search requirements, restricted area access, and parking restrictions. Contractors must be aware that security/force protection procedures may change due to changes in the local Force Protection Condition level.
1.0.2 Contractor personnel working on the Defense Supply Center Columbus installation will be subject to screening as dictated by current security regulations. Contractor personnel shall provide information requested to accomplish the required screening process. Levels of screening will be dictated by the sensitivity of the position the contractor will occupy and the access they require to DSCC and its facilities.
1.0.3 The Contracting Officer will coordinate with Security and Emergency Services personnel prior to the start of the contract performance to ensure all required security/force protection security measures are in place. The Contracting Officer will coordinate with Security and Emergency Services personnel at the end of the contract to ensure all government issued IDs have been accounted for.
1.1 IDENTIFICATION (ID) CARD/BADGE:
1.1.1 All contractors (including subcontractors) working On-Center must be issued a Contractor Badge by the DSCC Installation Pass & ID Office located in building 52 prior to starting work on the DSCC installation in accordance with DSCCI 5720.003 Installation Entry/Access. The type of credential required is divided into four areas as described below. Access of Foreign national contractor employees is strongly discouraged. Any request for foreign national access must be submitted to the Chief of Security and Emergency Services for approval one week in advance and approved on a case-by-case basis. If approved foreign nationals are only eligible for a Tier 1 or 2 ID.
1.1.2 Contractors conducting temporary business may obtain a Tier 1, Disposable Visitor Badge for up to 30 days. The contractor must be entered into the Visitor Notification System (VNS) by an authorized sponsor. Renewals of Tier 1 visitor badges in order to circumvent the requirement to receive a contractor ID for work longer than 30 days will not be tolerated.
1.1.3 Outside contractors working on the installation must be issued a Tier 2, Local Access Badge (Outside Contractor) prior to starting work. The Outside Contractor Badge (Red Stripe on top of card) has no building access programmed into the card. This card is not recognized by building lobby officers for entrance and is for contractors who solely work outside. Contractors with this
(REV 05/22/2013)
badge must be escorted at all times when inside a building. The DSCC outside contractor ID may be obtained by the appropriate Verifying Official initiating a DSCC Form 2310, DSCC Tier 2 (Inside Contractor) ID card and Key Card Request and forwarding it to their respective Personnel Security Office located at DSCC. This badge does not authorize the holder to sponsor visitors on to DSCC.
1.1.4 Contractors who require building access for more than thirty days but not DOD networks access must be issued a Tier 3, Local Access Badge (Inside Contractor) prior to starting work. The badge has a blue stripe on the top and can be programmed to operate any electronic access control devices needed. This badge is only authorized access to buildings which have been programmed on to it.
Contractors with this badge must be escorted at all times when inside a building which they are not assigned. The Tier 3, Local Access Badge (Inside Contractor) may be obtained by the appropriate Verifying Official initiating a DSCC Form 2310, DSCC Tier 3 (Inside Contractor) ID Card and Key Card Request and forwarding it to their respective Personnel Security Office located at DSCC. This badge does not authorize the holder to sponsor visitors on to DSCC.
1.1.5 Contractors who require access to the Center’s information technology network in the course of the contract must be issued a DOD CAC and a Contractor Key Card prior to starting work on DSCC.
The CAC can be obtained by the appropriate Trusted Agent placing the contractor employee into the Trusted Associate Sponsor System (TASS). The Contractor Key Card may be obtained by the appropriate Trusted Agent initiating a DSCC Form 2310, DSCC Tier 3 (Inside Contractor) ID card and Key Card Request and forwarding it to their respective Personnel Security Office located at DSCC. Inside contractors that possess a CAC may sponsor visitors onto DSCC
1.1.6 Working with the applicant, the Trusted Agent or Verifying Official will schedule an appointment within thirty days of badge approval at the Pass and ID office using the ID scheduler website: https://centerwide.dscc.dla.mil/badgescheduler/Intro1.aspx. The Pass and ID office is located in Bldg. 52. Normal Hours of Operation: Monday through Friday, 0630-1530 hours. Once an appointment is made the Trusted Agent or Verifying Official will sponsor the applicant as a visitor in the Visitor Notification System, if necessary.
1.1.7 The Tier 3, Local Access Badge (Inside Contractor) ID and Contractor Key Card is activated with basic access permissions, for example lobbies, cafeteria at Buildings 20 and 21. There is a block located in Section 3 of the DSCC Form 2310 in which the Verifying Official will enter specific locations that utilize card readers that the applicant must gain access to. The Verifying Official will indicate the location by building number for exterior doors. Interior door access of any building must be listed separately. If 24/7 access is required, sufficient justification must be included.
1.1.8 Badges may be renewed beginning 90 days prior to expiration. The renewal process is the same as for the initial ID and key card. TA’s and AO’s will re-verify CAC, Outside Contractor or key card requirements and complete the necessary steps as outlined above. Contractors must turn in all previously issued ID and key cards before receiving a new one. ID and key card renewal requests may be submitted up to 90 days before the card expiration date. It is the cardholder’s responsibility to advise their Verifying Official 90 days before the card expiration date that their ID will expire. This is to ensure that there is ample time for a new badge request to be processed and an appointment made at Pass and ID for badge issuance.
1.1.9 Contractor employees, including those of subcontractors, are required to wear the ID card/badge issued by the DSCC Installation Pass/ID Office conspicuously on their outer clothing at all times while working on this Center. Contractor personnel/subcontractors are subject to challenge and removal from the work area if the ID card is not being worn. It is the Contractor's responsibility to enforce this requirement. Failure to do so is just cause for terminating this contract for default.
(REV 05/22/2013)
1.1.10 It is the Contractor's responsibility to assure ID Cards issued to employees, including subcontractors, are turned in to the Pass/ID Office by each individual employee when the employees work on this project is completed. All ID cards/badges that have been issued during the life of this contract must be/have been returned to the Pass/ID Office to out process at the completion of the project. The Contracting Officer will verify with the Pass/ID Office that all items have been returned prior to authorizing final payment on the contract.
1.1.11 Under no circumstance will a Contractor or any contractor employees or subcontractors use or transfer their ID card/badge to allow anyone else access to any area on Center. Failure to comply with the requirements of this section is a security violation, which could result in subsequent administrative action, including requiring the contractor to permanently remove from the project the employee committing the violation, and/or termination of the contract for default.
1.3 VEHICLE OPERATION:
1.3.1 DRIVING ON CENTER: Contractor shall obey all speed limits and traffic signs. Speed limit on Center is 25 MPH unless otherwise posted. Radar is used on Center. Disobeying traffic regulations may include a monetary fine, court appearance, or loss of driving privileges.
1.3.2 PARKING: Contractor vehicles will be parked only in lots or areas designated by the Contracting Officer or designee. These areas will be discussed at the post award conference. The Contracting Officer or designee shall also determine if it is necessary for such vehicles to be in other than designated locations, and then make necessary arrangements for additional parking. Vehicles left on Center overnight must be coordinated with the Contracting Officer or designee. Any vehicle left unattended on Center that contains working materials, tools, and personal items of value must be locked at all times. The Government will not be liable for any lost, stolen or damaged vehicles or items.
1.3.3 USE OF ALCOHOL AND ILLEGAL DRUGS: The use of illegal drugs is prohibited on Federal property. Violators will be prosecuted.
1.3.4 WEAPONS ON CENTER: No weapon, either on one’s person or placed inside a privately-owned vehicle is allowed. If a weapon of any type is found, it will be confiscated and held as evidence. Having unauthorized weapons on Federal property is a felony, and violators will be prosecuted.
1.4 ACCIDENTS/THEFTS/DAMAGE TO GOVERNMENT OR PRIVATE PROPERTY: If any of these incidents occur, the Contractor shall notify the Contracting Officer or designee and a Police Report will be initiated.
1.5 MATERIAL, DELIVERY AND RELEASE:
1.5.1 All commercial vehicles will enter and exit the Center through the James Road Gate access control point (ACP). Commercial vehicles include, but are not limited to, semi-trucks, box trucks, passenger busses, cargo vans, dump trucks and walk-in vans. All such vehicles entering the gate will be processed through an entrance security inspection point before continuing onto Center. Hours of operation are from 0530-1730 M-F, excluding holidays. The names of Contractor personnel responsible for the receipt of Contractor's material and equipment delivered to this Center and telephone numbers or location where they can be reached shall be made available to the Contracting Officer or designee who will ensure the delivery is entered into the Visitor Notification System
(REV 05/22/2013)
(VNS). All receipts and shipments shall be handled through the James Road Gate. It is the responsibility of the Contractor to provide the personnel and equipment required to unload incoming materials, tools and equipment. Personal deliveries to DSCC Associates, tenant activities or contractors, i.e. pizza, flowers, are not authorized. Foreign national delivery truck operators must be processed in accordance with the same procedure as outlined in paragraph 1.1.1. Contract Officials will ensure that all vendors are provided ample notice of the requirements and restrictions in this enclosure to minimize conflicts when commercial vehicles or vendors arrive on Center. They will also ensure all contracts comply with the stipulations outlined in policy guidance. If procedural requirements have not been met then the driver will not gain access and be turned away
1.5.2 All deliveries, except perishable items, fuel, warehouse deliveries, construction materials, or items too large to be x-rayed will be sent directly to the Central Receiving Facility (CRF). Items will be screened and delivered by the government. Any items being shipped from a building on site must be picked up from the CRF.
1.5.3. Properly marked Contractor vehicles will be allowed to carry tools and equipment normally carried in or on the vehicle. All vehicles are subject to security inspection at any time to determine if materials and tools being used or carried are authorized. Loading of materials onto the vehicles is the responsibility of the Contractor.
1.6 SECURING EQUIPMENT, TOOLS AND SUPPLIES: Contractors are responsible for securing their own equipment, tools, supplies, etc., that are brought to the job site. Lost or stolen equipment will be immediately reported to the DSCC Installation Police Department (692-2111).
Under no circumstances will vehicles or construction equipment be left unattended with keys inside.
If a vehicle is found unattended with keys in it, the keys will be confiscated by DSCC Installation Police.
1.7 REMOVAL OF CONTRACTOR PROPERTY: The Contractor shall be responsible for removing temporary buildings (e.g. storage shed’s, trailers, shops, and office space), rubbish, tools, scaffolding, equipment and materials that are not the property of the Government at the completion of the project. The Contracting Officer or designee will not accept the project as completed until all Contractors property is removed. If the contractor is inadvertently paid prior to the removal of all of its buildings, rubbish, tools, scaffolding, equipment and materials that are not the property of the Government, the Contractor will be liable to the Government for the cost to the Government related to removing the Contractor’s property. EXCEPTIONS: A written request may be submitted to the Contracting Officer for additional time to remove the temporary buildings and equipment. This exception applies only if the Contracting Officer provides written approval of the Contractor’s request for additional time to remove the temporary buildings and equipment. If the Contractor fails to remove the property in the additional time approved in writing, the Contractor will be liable to the Government for any cost to the Government related to removing the Contractor’s buildings, equipment and materials that are not the property of the Government. With the written consent of the Contracting Officer, buildings may be abandoned and need not be removed.
2.1 SAFETY: The Defense Supply Center, Columbus is proud to be an Occupational Safety and Health Administration (OSHA) Voluntary Protection Program (VPP) star site. Contractors shall comply with all Department of Labor and OSHA Rules and Regulations, 29CFR 1910 (General Industries) or 1926 (Construction), whichever is applicable. Contractors shall follow the safety requirements of EM 385- 1-1, appropriate safety standards established by National Electric Code, National Fire Code, the State of Ohio, DLA or other safety requirements as established. The safety provisions listed below are only general in nature and are not intended to be all inclusive. The DSCC Installation Environmental, Safety and Occupational Health Office can be reached at 614-692-2332.
2.1.1 SUBMITTAL: Contractors and subcontractors shall watch a brief, approximately 10 minute, DS-FCE VPP Awareness film prior to performance of any on-site work. The video will be provided as a VCR tape or on a CD. A TV/VCR is available for use from the DSCC Installation Environmental, Safety and Occupational Health Office if needed. Contractors shall document, by use of the provided form or similar, that all contractor and subcontractor employees have viewed the film.
A “VPP Awareness Training” form is provided at the end of this section. Only sub-contractors providing incidental services, e.g., laundry, delivery or other supply services are not covered. Copies of documentation shall be provided to the Contracting Officer or designee, who will forward them forwarded to the DSCC Installation Environmental, Safety and Occupational Health Office, upon completion.
2.1.2 SUBMITTAL: Contractors and subcontractors shall provide the information required by the “Contractor Safety/Environmental Management Systems Information Data Sheet”, also provided at the end of this section, prior to performance of any on-site work. If using subcontractors, information for subcontractors must be provided no later than 2 weeks prior to performance of any on-site work.
Only sub-contractors providing incidental services, e.g., laundry, delivery or other supply services are not covered. Copies of the “Contractor Safety/Environmental Management Systems Information Data Sheet” shall be provided to the Contracting Officer or designee, who will forwarded them to the DSCC Installation Environmental Safety and Occupational Health Office, upon completion.
2.1.2.1 SUBMITTAL:For contracts that incur work hours greater than or equal to 1,000 hours/quarter (approximately 3 full-time employees), the Contracting Officer or designee will request that an OSHA Form 300A, for the last two years of operation, be submitted annually no later than January 15th of each year. Contractors with contracts which meet this requirement, but end prior to January 15th, shall submit this information at the end of the contract. Hours worked and injury information should be reflective of activity which occurred at the Defense Supply Center, Columbus.
The Contracting Officer or designee will forward copies to the DSCC Installation Environmental Safety and Occupational Health Office upon completion.
2.1.3 SUBMITTAL: Safety Plan: The Contractor shall assure that an up-to-date Safety Plan is available at the job site at all times and available to the Contracting Officer or designee. The Safety Plan shall identify each major type of work (for example: plumbing, electrical, demolition, equipment installation, equipment maintenance) or where a subcontractor or work classification is to perform work. For each type of work the contractor shall prepare a Job Hazard Analysis (JHA).
2.1.3(a) The Contractor shall, for contracts with a completion schedule of 60 days or longer, submit a written Contractor Safety Plan to the Contracting Officer or designee for review within five
(5) days after receipt of the notice to proceed (NTP). Updated submissions are required whenever a JHA is added or changed.
2.1.3(b) For contracts with a completion schedule of less than 60 days, the Safety Plan must be made available to the Contracting Officer or designee upon request.
2.1.4 It is the responsibility of the Contractor to be aware of the safety requirements of personnel, equipment, buildings and materials. All protective coverings, shields, protective barriers, barricades, warning signs, etc., will be furnished and installed by the Contractor where a hazard or potential hazard exists. Twenty-four (24) hours prior to the planned installation of protective barriers and barricades, the Contractor shall coordinate with the Contracting Officer or designee for concurrence and approval.
Barricades and barriers shall be removed by the Contractor at the completion of work in the area.
(REV 05/22/2013)
2.1.5 PERSONAL PROTECTIVE EQUIPMENT (PPE): such as hard hats, safety glasses, safety shoes, etc. shall be worn in all areas and on all jobs as required by the DSCC Installation Environmental, Safety & Occupational Health Office.
2.1.5(a) All protective equipment must comply with appropriate OSHA standards. All protective equipment is subject to review by the DSCC Installation Environmental, Safety & Occupational Health Office.
2.1.5(b) All hard hat areas shall be indicated by Contractor-furnished signs. It is mandatory that all personnel working on this project wear approved protective equipment for their own protection.
2.1.6 ACCIDENT/INCIDENT: The contractor shall notify the Contracting Officer or designee, who will in turn notify the DSCC Installation Environmental, Safety and Occupational Health Office immediately after the occurrence of a serious accident resulting in either loss of life, or major property damage to a government facility. This notification shall not impede efforts to avoid additional injuries or damages.
2.1.6(a) Injury Treatment: Emergency first aid treatment is available for Contractor employees at the DSCC Installation Fire and Emergency Services, Building 46. Fire and Emergency Services will respond for serious injuries occurring on Center. Emergency calls are made by dialing -911 on the Center telephone system, or 614-692-2111. If a private ambulance service is used, the Contractor is responsible for such expenses.
2.1.6(b) Mishap Reporting: A report on each job connected injury, property damage, or motor vehicle mishap shall be submitted to the Contracting Officer or designee, who will forward a copy to the DSCC Installation Environmental, Safety & Occupational Health Office, within 5 (five) days of the occurrence. This report may be made on either a Contractor's report form or DLA Form 1591, Mishap Report, or SF 91 (motor vehicle) found at http://www.dla.mil/dss/forms/. The estimated absence in days, if any, by employee due to injury and/or cost of property or vehicle damages shall be included.
2.1.7 ELECTRICAL SAFETY: Particular attention is directed to NFPA 70E, Standard for Electrical Safety in the Workplace. Contractor shall fully comply with all sections of this standard, including but not limited to: PART I, Chapter 2-2.4.3 – Ground Fault Protection for Personnel on Construction Sites;
PARTI, Chapter 3-7.1 – Use of Flexible Cords and Cables; PART II, Chapter 2-3 – Working On or Near Electrical Conductors or Circuit Parts; PART II, Chapter 5 – Lockout/Tag Out Practices and Devices. All electrical tools shall be properly grounded. Power saws shall be guarded.
2.1.8 FALL PROTECTION: Particular attention is directed to the OSHA Fall Protection Requirements. Personnel performing any type of work on elevated surfaces, over 6 feet, must adhere strictly to Fall Protection Standards. It is the responsibility of the Contractor to provide and maintain the fall protection plan to the Contracting Officer or designee for approval in accordance with Section 4, SUBMITTALS. Fall protection program/plan shall conform to the requirements of OSHA’S 1926.501, Duty to Have Fall Protection, and 1926.502, Fall Protection Systems Criteria and Practices.
Attention is drawn to the requirement for Warning Line Systems, described in CFR Part 1926.502(f), and a competent person to monitor the safety of other employees per CFR Part 1926.502(h) - Safety Monitoring Systems.
(REV 05/22/2013)
2.1.9 LADDERS & SCAFFOLDS:
2.1.9(a) Ladders shall be structurally rigid, sound, equipped with approved safety shoes, free of cracks and not painted. Ladders will be used only when very small hand tools or handling of light materials is involved. When performing electrical work or working near electrical lines, only ladders approved for electrical work shall be used.
2.1.9(b) Scaffolds shall have handrails and toe boards. Platforms shall be cleated to prevent movement.
2.1.10 All hand tools shall be kept in good repair and used only for the purpose intended. Defective tools shall be acceptably repaired or removed from service. Tools shall not be thrown from one level to another; and when used overhead, shall be secured by placing in tool boxes or other suitable containers when not in actual use.
2.1.11 All construction material shall be stored in a neat and stable manner so as to preclude leaning or falling stacks. Housekeeping will be maintained at a high level at all times. Scrap material, such as empty cartons, wood crates, etc., will be removed by the Contractor at the end of each work day.
2.1.12 Pneumatic tools and hoses shall be handled in strict accordance with EM 385-1-1, 3 September 1996, and the Occupational Safety and Health Act of 1970.
2.1.13 Compressed air used for cleaning purposes shall not exceed 30 p.s.i. when the nozzle end is obstructed or dead ended and then only with effective chip guarding and personal protective equipment.
Compressed air will not be used to blow dirt from hands, face or clothing.
2.1.14 Smoking will be prohibited except in designated areas.
2.1.15 Gasoline operated equipment used in buildings will be kept to a minimum to preclude the build-up of carbon monoxide and other air contaminants. Electric motor driven arc welders are preferred. If gasoline or diesel engine welders are used, the welder will be kept outside the building with welding cables run inside or the engine exhaust will be ducted outside the building subject to the DSCC Installation Environmental, Safety & Occupational Health Office’s approval. Excavating equipment will not be operated inside of any building without prior approval of the DSCC Installation Environmental, Safety & Occupational Health Office.
2.1.16 SUBMITTAL: Hazardous Material Safety Data Sheets: The Contractor shall provide "prior to materials arrival on the installation" Material Safety Data Sheets (MSDSs) (OSHA Form 174 or equivalent) for all hazardous materials utilized during the period of this contract.
2.1.16(a) Copies of each MSDS shall be provided to the Contracting Officer or designee, who will forward to the Environmental, Safety & Occupational Health Office for review and approval.
Submittal will be reviewed within 10 working days. A copy of the MSDS shall also be kept on the job site. Hazardous materials are defined as (but not limited to) paints, lacquers, varnishes, sealers, thinners, adhesives, epoxies, acids, compressed gases, solvents, all chemicals containing flammable, toxic, caustic or corrosive mixtures. MSDSs are required regardless of the quantity required for the contract.
2.1.16(b) The listing of hazardous materials is not all inclusive. Therefore, MSDSs are required for materials not listed therein, but contain hazardous ingredients, per paragraph (d) of 29 CFR Part 1910, Subpart Z, Section 1200, Hazardous Communication.
(REV 05/22/2013)
2.1.17 CONFINED SPACE ENTRY: The Contractor shall be responsible for compliance with all requirements as defined by the U. S. Department of Labor, Occupational Safety and Health Administration (OSHA) for Confined Space Entry. The Environmental, Safety & Occupational Health Office and the Fire Prevention Office shall be notified when and where confined space entry is occurring.
2.1.17(a) Confined spaces include, but are not limited to, manholes and Catch Basins as defined by OSHA regulation 29 CFR 1910.146, and shall be treated as a permit-required space.
2.1.17(b) The Contractor shall establish and use a permit system to restrict access to the space and to assure hazards within the space are controlled prior to entry.
2.1.17(c) The Contractor shall perform all required atmospheric testing for all potential air contaminants and oxygen deficiencies in the space. The space must be tested immediately prior to initial entry, and the space shall be repeatedly tested as needed but no less frequently than once per shift. At a minimum, the space will be tested for oxygen deficiency, flammables, carbon monoxide and hydrogen sulfide. The sampling protocol used by the Contractor is subject to review by the Contracting Officer or designee.
2.1.17(d) Forced ventilation shall be provided as necessary to assure air contamination remains below the limits as specified in 29 CFR 1910.1000. Confined spaces may be entered only where forced ventilation moves a volume of air at least 10 times the volume of space each hour (ten or more air changes per hour).
2.1.17(e) Tools and lighting must be selected to minimize hazards within the space.
2.1.17(f) Protective equipment shall be selected by the Contractor that is suitable for use against specific hazards in the space. Protective equipment is subject to review by the Contracting Officer or designee.
2.1.17(g) The Contractor shall provide a person to serve as an attendant at the portal entry into the space. The attendant shall prevent unauthorized entry and summon assistance in case of emergency.
The attendant shall be provided with protective equipment.
2.1.17(h) The Contractor shall request permits to enter the space through the Installation Environmental, Safety & Occupational Health Office (614-692-2332) and notify Installation Emergency Services Communication Center (ESCC) prior to entry.
2.2 FIRE PREVENTION: The following fire provisions are only general in nature and will not excuse a Contractor from following other fire prevention practices as established. In the event or suspicion of fire, immediately call the DSCC ESCC (Emergency Telephone: 911 from Center telephone system 614-692-2111 from cellular telephones) to report the conditions.
2.2.1 Gasoline and other flammable liquids will be stored in approved safety cans with spring loaded, self-closing lids. Gasoline dispensing tanks shall be properly grounded, surrounded by a sand dike at least 12 inches high and located at least 50 feet from any structure. Location is to be specified by the DSCC Installation Fire Inspector, 614-692-2921.
2.2.2 Tools and equipment used in buildings where flammable materials are stored or where flammable liquids are being used shall be of spark proof construction.
(REV 05/22/2013)
2.2.3 Equipment shall not be refueled with the engine running.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .