This document contains questions and answers related to a federal solicitation for roof and gutter repair services at multiple buildings located at the Defense Supply Center in Columbus, Ohio. The solicitation is seeking a contractor to perform repair and replacement of roofing and gutters at eleven buildings over a 180-day period of performance. Mandatory site visits will be held on July 28th and questions are due by August 5th, with answers posted by August 7th. The requirement is set aside for small businesses between $500,000 to $1 million. The contractor must provide a bid bond and past performance information, as well as a contract management plan and staff resumes. The one-year warranty of construction clause FAR 52.246-21 applies to all new and repair work.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for CSC‐20013; Site Wide Gutter & Roof Repair

1. Plan Page G‐0002 General Note 2 makes the statement that contractor is to field verify the exact extent of the work prior to bidding, however during the site visit, Government Personnel did not want us up on the roofs. Each additional plan page has details of what work needs to be done on each roof. Are we to assume that the work shown on these pages is the extent of the work?

The plans clearly delineate the work required, however should additional work be discovered during the preconstruction walkthrough on each roof, we should be permitted to address those additional areas of work under the differing site condition clause.

Yes, any additional work discovered after contract award may be subject to the differing site conditions clause. However, it is the Government’s position that the extent of the work is shown on the drawings. Contractor claims for differing site conditions would be limited to work above and beyond what is shown on the drawings, so contractor proposals should be inclusive of the effort to perform all work as shown.

2. Given the nature of repairs to existing damaged and defective roof systems, please confirm no roof system warranties are required with this work?

Roof System Warranty is not required.

3. Section 07 41 13 states that the contractor is provide a 10 yr NDL roof system and material warranty. Given the nature of repairs, this is not possible. Please confirm this is not a requirement and no warranty will be required?

Concur. 10 year NDL roof system and material warranty are not required.

4. Section 07 41 13 contains reference to manufacturer's finish warranty. Please confirm this is not applicable to this solicitation?

This is incorrect. Manufacturer finish warranty (e.g. Kynar or similar) is applicable to new material provided and used in identified repairs.

5. What are the requirements for roof warranty on this contract?

It is understood that a total roof system warranty is not applicable to this project, where only spot repairs are being completed. One Year Warranty of Construction FAR 52.246‐21 is required for all new/repair work.

6. Section 07 61 14 contain similar language about roof warranty. Please confirm there are no warranty requirements with this spec section?

It is understood that a total roof system warranty is not applicable to this project, where only spot repairs are being completed. One Year Warranty of Construction FAR 52.246‐21 is required for all new/repair work.

7. Please specify all locations applicable to this solicitation where a sealant applied in the course of specified repairs is subject to a warranty requirement and for what duration according to spec section 07 92 00?

One Year Warranty of Construction FAR 52.246‐21 is required for all new/repair work.

8. Given this project may be awarded in the 3rd to 4th quarter 2020 and NTP may be issued going into cold weather months or during cold weather months, will considerations in the period of performance be made for cold weather limitations related to portions of the roofing repairs?

Yes, weather conditions are an excusable delay and environmental conditions for sealant application and curing will be considered.

9. Are the gutters at the upper roof levels the only ones being replaced, or are the gutters and downspouts at the lower canopies to be replaced as well?

Yes. Gutters and downspouts at the lower canopies are not to be replaced in this project.

10. In looking at the buildings yesterday I noticed that lightning protection systems are installed near the eave lines of the buildings. This may interfere with the replacement of the gutters. Is the lightning protect system to be removed and reinstalled? If so will it need to be recertified?

Yes. If the lightning protection system interferes with the work required by this project it shall be removed, reinstalled, and recertified. The lighting protection system shall be protected during construction any damage to the system shall be repaired in accordance with industry codes and standards and recertified. Lighting protection system is only a few years old and was installed, certified, and warrantied by Turner Lighting Protection Co.

11. A‐107 Coded Note 8 & 9 – Calls for 7 LF of eave flashing but the note points to the rake, is this eave or rake flashing?

Rake.

12. A‐102 Coded Note 4 – calls for 1,108 EA which is substantially higher than all the other buildings.

Is this a typo?

Notes 4 and 6 identify panel patches. Total SF of Panel patches for Building 9 are 1115 SF. That is 1108 SF (Note 4) and 7 SF (Note 6) at various locations.

13. A‐112 Coded Note 1 – call for rake edge flashing‐ 1 EA , the rest of the coded notes in reference to the rake flashing have been in LF. Is this the whole side or just a section/PC? Same question for A‐103 Coded Note 13 & 14?

Whole side.

14. Several buildings call for ridge vent flashing to be replaced, is the intent to remove and reinstall the actual ridge cap?

No. Replace deteriorated flashing and flashing fasteners as quantified by the plans.

15. Are the roof decks all metal?

Yes

16. A‐102 Coded Note 13 – what is the approx. size of the metal siding repair?

Siding repair appears to be less than 18 ft by 18ft. See photo.

17. General question from site visit regarding bonding - what forms are required?

This requirement requires a bid bond be supplied along with the vendor's proposal in accordance with clause 52.228-1 Bid Guarantee (see PG 43 of Solicitation Attachment 1). The Bid Guarantee is submitted on form SF24 (Revision 8/2016). For additional info, the Performance and Payment Bond, which would occur after award, is submitted on form SF25 (Revision 8/2016).