Attachment 7 - Bid Form (PDF).pdf
PDF 164 KB Posted
- Attached to
- CSC-20013; Gutter and Roof Repair
- Solicitation number
- SP4702-20-R-0028
- Issued by
-
Defense Logistics Agency
About this file
This document contains a federal contract solicitation for roof and gutter repair services at multiple buildings located at the Defense Supply Center in Columbus, Ohio. The solicitation seeks a contractor to perform repair and replacement of roofs and gutters at eleven buildings. Key details include a mandatory site visit on July 28, 2020 to understand project scope, a question deadline of August 5, 2020 with answers posted by August 7, 2020, a 180-day period of performance to complete all work, and a fixed-price contract award between $500,000 to $1,000,000. The solicitation is a 100% small business set-aside issued by the Defense Logistics Agency. Responses are due on Standard Form 1442 and must include a bid form, bid bond, past performance information, and contract management plan along with resumes to support staffing requirements. Award will be made to the technically acceptable bidder with acceptable past performance offering the lowest price.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. DATE:
PROJECT TITLE:
PRELIMINARY DESIGN DATE:
NO. OF UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
BASE WIDE ROOF REPAIRS $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL $0.00
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
ITEM
QUANTITY MATERIAL LABOR EQUIP COST
TOTAL COST
BUILDING 19 SUBTOTAL
BUILDING 9 SUBTOTAL
BUILDING 10 SUBTOTAL
BUILDING 11 SUBTOTAL
BUILDING 17 SUBTOTAL
BUILDING 18 SUBTOTAL
BUILDING 27 SUBTOTAL
BUILDING 43 SUBTOTAL
BUILDING 306 SUBTOTAL
BUILDING 308 SUBTOTAL
BUILDING 30 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 9
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, Aluminum, .032" thick, along ridge vent base (2" width)
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Thru-Panel Fastener Replacement EA Pipe Boot Replacement EA Debris and Vegetation Removal SF Sealant LF
STORM DAMAGED SIDING REPAIRS
Remove storm damaged siding at south end of Building 9.
SF
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels for storm damage siding repair at south end of Building 9.
SF
Sheet Metal Flashing, 26 gauge LF Thru-Panel Fastener Replacement EA
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
BUILDING 9 SUBTOTAL
CSC-20013
FINAL DESIGN
EQUIP COST TOTAL
COSTITEM
QUANTITY
CONSTRUCTION COST ESTIMATE
DRAWING NO.
GUTTER AND ROOF REPAIRS, SITE WIDE
ARCHITECT/ENGINEER:
3-1682
ESTIMATOR:
MATERIAL LABOR
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 10
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Thru-Panel Fastener Replacement EA Flashing Fastener Replacement EA Pipe Boot Replacement EA Debris and Vegetation Removal SF Sealant LF
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 10 SUBTOTAL
ITEM
QUANTITY MATERIAL LABOR EQUIP COST
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 11
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, Aluminum, .032" thick, along ridge vent base (2" width)
SF
Thru-Panel Fastener Replacement EA Pipe Boot Replacement EA Debris and Vegetation Removal SF Equipment Removal and Roof Surface Repair EA Sealant LF
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 11 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 17
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, Aluminum, .032" thick, along ridge vent base (2" width)
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Thru-Panel Fastener Replacement EA Flashing Fastener Replacement EA Pipe Boot Replacement EA Sealant LF
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 17 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 18
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, Aluminum, .032" thick, along ridge vent base (2" width)
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Thru-Panel Fastener Replacement EA Flashing Fastener Replacement EA Pipe Boot Replacement EA Debris and Vegetation Removal SF
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 18 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 19
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, Aluminum, .032" thick, along ridge vent base (2" width)
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Flashing Fastener Replacement EA Pipe Boot Replacement EA Debris and Vegetation Removal SF
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 19 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 27
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, Aluminum, .032" thick, along ridge vent base (2" width)
SF
Thru-Panel Fastener Replacement EA Pipe Boot Replacement EA
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 27 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 30
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, Aluminum, .032" thick, along ridge vent base (2" width)
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Thru-Panel Fastener Replacement EA Flashing Fastener Replacement EA Pipe Boot Replacement EA
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 30 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 43
ROOF REPAIRS
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Pipe Boot Replacement EA Sealant LF Aluminum Roof Panels, Ridge cap, .032" thick LF
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 43 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 306
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Thru-Panel Fastener Replacement EA Pipe Boot Replacement EA
GUTTER AND DOWNSPOUT
REPLACEMENT
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 306 SUBTOTAL
PRELIMINARY DESIGN DATE:
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
GENERAL REQUIREMENTS
Mobilization/Demobilization DAY 40' Telescopic Boom Lift WEEK Sediment Control Bag EA Dumpster Rental/Hauling Off-Site WK Construction Management Fees/Supervision Project SubContractor Mark-up Project
BUILDING 308
ROOF REPAIRS
22 gauge Zinc Aluminum Alloy Finish Steel Roofing Panels
SF
Sheet Metal Flashing, 26 gauge, along eaves and rakes, painted
LF
Thru-Panel Fastener Replacement EA Flashing Fastener Replacement EA Pipe Boot Replacement EA
GUTTER AND DOWNSPOUT
REPLACEMENT
Pipe, internal cleaning and inspection, television camera with video, up to 500 LF
Total
Remove Existing Gutters and Recycle LF Aluminum Gutters, Continuous LF Gutter End Caps, K Type, 6" EA Gutter Sealant LF Aluminum Downspouts, Corrugated, Rectangular LF
Over Head Profit Bonding
TOTAL $0.00
GUTTER AND ROOF REPAIRS, SITE WIDE
CONSTRUCTION COST ESTIMATE
CSC-20013 DRAWING NO. 3-1682
TOTAL
COST
ARCHITECT/ENGINEER: ESTIMATOR:
FINAL DESIGN
BUILDING 308 SUBTOTAL
File details come from the government source that posted it. Updated .