Section_01_11_00_Summary_of_Work_08_08_2019.pdf

PDF 679 KB Posted

Attached to
CSC-19719 M&R Building 20
Solicitation number
SP4702-19-R-0019
Issued by

About this file

Revised Section 01 11 00 Summary of Work

View the file

Other files

File Type Posted
Added_Questions_and_Answers_for_19-R-0019.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_1_of_16_rev_.pdf PDF
3-1692_-_SHT_12_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_9_to_15-SHT_12.pdf PDF
Amend_04_sf30_Continuation.pdf PDF
Amend_04-SP4702-19-R-0019-SF30.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_11_REV_A.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_16_REV_A.pdf PDF
Amend_03-SP4702-19-R-0019-SF30.pdf PDF
Amend_03_sf30_Continuation.pdf PDF
3-1692_-_SHT_1_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_1.pdf PDF
sf30_Continuation.pdf PDF
3-1692_-_SHT_8_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_8.pdf PDF
Amend_02-SP4702-19-R-0019-SF30.pdf PDF
3-1692_-_SHT_13_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_9_to_15-SHT_13.pdf PDF
3-1692_-_SHT_6_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_6).pdf PDF
Questions__Answers_for_Solicitation__08_19_2019.pdf PDF
Site_Visit_Project_CSC-19719_M&R_Building_20,_FY_19,_SP4702-19-R-0019.pdf PDF
SP4702-19-R0019_Replies_to_the_Questions_8_6_2019.pdf PDF
sf30_Continuation.pdf PDF
Amendment_01-SP4702-19-R-0019-SF30.pdf PDF
Combined_Plans_CSC-19719.pdf PDF
_6_ENG_FORM_4025-R.pdf PDF
DSCC_Excavation_Permit.pdf PDF
_2_ENG_FORM_93.pdf PDF
Soliciatation_SP4702-19-R-0019.pdf PDF
Bid_Forms.xlsx XLSX spreadsheet
Attachment__01_WDOL.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 11 00 Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL

REQUIREMENTS SECTION 01 11 00

SUMMARY OF WORK

08/08/ 2019

PART 1 GENERAL

1.1 SUBMITTALS

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.3 CONTRACT DRAWINGS

1.4 WORK RESCHEDULING

1.5 OCCUPANCY OF PREMISES

1.6 EXISTING WORK

1.7 ON-SITE PERMITS

1.7.1 Utility Outage Requests and Utility Connection Requests

1.7.2 Borrow, Excavation, Welding, and Burning Permits

1.8 LOCATION OF UNDERGROUND UTILITIES

1.8.1 Notification Prior to Excavation

1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

1.9.1 Delivery Schedule

1.9.2 Delivery Location

1.10 GOVERNMENT-INSTALLED WORK

1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS

1.11.1 NMCI Contractor Access

1.12 SALVAGE MATERIAL AND

EQUIPMENT PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 2

SECTION 01 11 00

SUMMARY OF

WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01

33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals G

Utility Outage Requests Utility

Connection Requests Borrow Permits

Excavation Permits

Welding Permits

Burning Permits

Salvage Plan;

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The contractor shall furnish all plant, labor, equipment, materials, supplies and supervision required in performing all operations to perform the following maintenance and repair work to complete this project:

CLIN No. 1:

• Replacement of loading dock ceiling by EIFS Systems;

• Replacement of fire suppression systems over loading dock at POD C;

• Replacement of ceiling lighting over loading dock area at POD C by new

LED lighting systems;

SECTION 01 11 00 Page 3

CLIN No. 2:

• Renovation to Nurse Station to provide extra exam room for patient care

(Install new Walls, new door, new window & new horizontal sliding window, modify HVAC Ducts, Fire Suppression Sprinkler System, Alarms & Lighting, etc.);

• CLIN No. 3:

• Replacement of sanitary sewer lines within kitchen floor and exterior concrete patio at the south side of the building 20.

• CLIN No. 4:

• Replacement of low level walkway lighting in the front and rear of the building 20;

• CLIN No. 5:

• Installation of new dock enclosure over dock floor and high speed coiling service doors over the dock levelers;

CLIN No. 6:

• Repair Window Leaks by Caulking & Sealant for Selected Windows;

• CLIN No. 7:

• Repair Storm Drain Pipes on Decks in Pods A, B & C;

• CLIN No. 8:

• Replacement of Rubber Tiles by Slip-Resistant Floor Coatings in Rooms

C130, C123 & C133.

• CLIN No. 9:

• Replacement of paver tiles by installation of concrete Walkways at

North side of Building 20

The contractor shall perform all operations in conjunction with this project in strict accordance with

SECTION 01 11 00 Page 4 specifications & drawings # 3-1692, sheets 1 through 16.

1.2.2 Location

The work is located in Building 20, “OPERATIONS CENTER” at the DSCC Complex, Columbus, Ohio. The approximate location is shown on the drawings.

1.3 CONTRACT DRAWINGS

The following drawings accompany this specification and are a part thereof.

Drawing No. 3-1692

Sheets 1 through 16.

Electronic set of contract drawings, maps, and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished. Immediately check furnished drawings and notify the Government of any discrepancies.

1.4 WORK RESCHEDULING

Normal duty hours for work are from 7:00 A.M. to 4:00 P.M., Monday through Friday. Requests for additional work requires written approval from the Contracting Officer 7 days in advance of the proposed work period.

1.5 OCCUPANCY OF PREMISES

NOT USED

1.6 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.7 ON-SITE PERMITS

SECTION 01 11 00 Page 5

1.7.1 Borrow, Excavation, Welding, and Burning Permits

1.8 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities. Verify existing utility locations indicated on contract drawings, within area of work.

1.8.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting excavation work.

1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

NONE

1.10 GOVERNMENT-INSTALLED WORK

NONE.

1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS

1.12 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --