Added_Questions_and_Answers_for_19-R-0019.pdf

PDF 43 KB Posted

Attached to
CSC-19719 M&R Building 20
Solicitation number
SP4702-19-R-0019
Issued by

About this file

Added Questions and Answers for SP4702-19-R-0019

View the file

Other files

File Type Posted
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_1_of_16_rev_.pdf PDF
3-1692_-_SHT_12_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_9_to_15-SHT_12.pdf PDF
Amend_04_sf30_Continuation.pdf PDF
Amend_04-SP4702-19-R-0019-SF30.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_11_REV_A.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_16_REV_A.pdf PDF
Amend_03-SP4702-19-R-0019-SF30.pdf PDF
Amend_03_sf30_Continuation.pdf PDF
3-1692_-_SHT_1_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_1.pdf PDF
sf30_Continuation.pdf PDF
3-1692_-_SHT_8_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_8.pdf PDF
Amend_02-SP4702-19-R-0019-SF30.pdf PDF
3-1692_-_SHT_13_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_9_to_15-SHT_13.pdf PDF
Section_01_11_00_Summary_of_Work_08_08_2019.pdf PDF
3-1692_-_SHT_6_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_6).pdf PDF
Questions__Answers_for_Solicitation__08_19_2019.pdf PDF
Site_Visit_Project_CSC-19719_M&R_Building_20,_FY_19,_SP4702-19-R-0019.pdf PDF
SP4702-19-R0019_Replies_to_the_Questions_8_6_2019.pdf PDF
sf30_Continuation.pdf PDF
Amendment_01-SP4702-19-R-0019-SF30.pdf PDF
Combined_Plans_CSC-19719.pdf PDF
_6_ENG_FORM_4025-R.pdf PDF
DSCC_Excavation_Permit.pdf PDF
_2_ENG_FORM_93.pdf PDF
Soliciatation_SP4702-19-R-0019.pdf PDF
Bid_Forms.xlsx XLSX spreadsheet
Attachment__01_WDOL.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Added Questions and Answers for

Project CSC-19719 M&R Building 20

SP4702-19-R-0019

Question: Please provide the number of windows that need repairing and their perimeter that need caulking & sealant (see sheet 12).

Reply: Only (8) windows & (1) Entranceway are part of the Scope of Work (SOW) for this project. Added window locations on the attached revised drawing sheet 12 of 16. Removal of existing sealant & caulking and installation of new sealant & caulking around window perimeter of the selected (8) windows and (1) entranceway can lights areas as shown on the revised drawing sheet 12 of 16 and as specified in CLIN # 006 .

Please see attached drawings sheets # 1 & 12 of 16 for detail information.

File details come from the government source that posted it.