Questions & Answers for Solicitation SP4702-19-R-0019
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question & Answers for Solicitation #SP4702-19-R-0019 – CSC-19719, M&R Building 20 for DSCC FY 19
1. Spec 01 11 00, part 1.3 states that “Sheet No.6 of 16 is not in used” while the work of CLIN 003 (part 1.2.1 of the same section 01 11 00) requires the use of this sheet. Further explanation or extra drawings are needed for CLIN 003.
Reply: CLIN ITEM #3 is included now. Correction is made to Drawing sheets 1 & 6 of 16 and sheet 6 of 16 is included in the project. Also bid sheet is being revised to include CLIN #3 to the project. Revised Spec Section 01 11 00, dated 8/8/2019 shall be used for this project.
Revised documents are attached for bidders’ information.
2. Spec 01 11 00, part 1.2.1, CLIN 002 includes “new counter coiling door”, however, no counter coiling doors were found in the set of drawings. Please provide the details of the indicated “new counter coiling door”.
Reply: CLIN ITEM #2 is being revised. Correction is made to reference Spec Section. There is no counter coiling doors under CLIN #2. It shall be read as “new horizontal sliding window, see details A/7 & E/7 on sheet 7 of 16.
Revised Spec Section 01 11 00 is attached for bidders’
3. Please provide the number of windows that need repairing and their perimeter that need caulking & sealant (see sheet 12).
Reply: There is no window repair work counter coiling doors under CLIN #2. It shall be read as “new horizontal sliding window, see details A/7 & E/7 on sheet 7 of 16.
Revised Spec Section 01 11 00 is attached for bidders’
4. Please clarify the equipment (note 2) and other items (note 7) that need to be removed and reinstalled in order to replace rubber tiles (sheet 13)
Reply: It shall be the contractor’s sole responsibility to field verify the equipment and other items that need to be removed & reset. See “GENERAL NOTE #1” on drawing sheet 1 of 16.
5. Please provide the route and total distance to the designated place to dump solid waste and store salvaged materials.
6. Per sheet 2, please provide number, sizes and weight of removeable equipment, pop machines, tables, and trash receptacle (as stated in note 1 under “scope of work”).
Replies to questions 5 & 6: All these items mentioned in not 1 under Scope of work on drawing sheet 2 of 16 are very light and it can be relocated from one end to the other end of the loading dock as required for ceiling work.
7. On sheet 8, please confirm locations of the plaza drains.
Reply: Plaza drain detail is being deleted from this sheet for paver work. See revised sheet 8 of 16.
8. On sheet 13, please elaborate on electrical scope of work (length, size, and type of conduits, wiring, plumbing and equipment that need removal and reinstall).
Reply: Revision work is done to delete above listed items in question #8. See revised sheet 13 of 16.