Bid_Forms.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
CSC-19719 M&R Building 20
Solicitation number
SP4702-19-R-0019
Issued by

About this file

Attachment # 05 Construction Cost Estimate

View the file

Other files

File Type Posted
Added_Questions_and_Answers_for_19-R-0019.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_1_of_16_rev_.pdf PDF
3-1692_-_SHT_12_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_9_to_15-SHT_12.pdf PDF
Amend_04_sf30_Continuation.pdf PDF
Amend_04-SP4702-19-R-0019-SF30.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_11_REV_A.pdf PDF
3-1692_-19719_-__M_&_R_TO_BLDG.20__sht_16_REV_A.pdf PDF
Amend_03-SP4702-19-R-0019-SF30.pdf PDF
Amend_03_sf30_Continuation.pdf PDF
3-1692_-_SHT_1_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_1.pdf PDF
sf30_Continuation.pdf PDF
3-1692_-_SHT_8_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_8.pdf PDF
Amend_02-SP4702-19-R-0019-SF30.pdf PDF
3-1692_-_SHT_13_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_9_to_15-SHT_13.pdf PDF
Section_01_11_00_Summary_of_Work_08_08_2019.pdf PDF
3-1692_-_SHT_6_OF_16_-19719_-__M_&_R_TO_BLDG.20__sht_1_to_8-SHT_6).pdf PDF
Questions__Answers_for_Solicitation__08_19_2019.pdf PDF
Site_Visit_Project_CSC-19719_M&R_Building_20,_FY_19,_SP4702-19-R-0019.pdf PDF
SP4702-19-R0019_Replies_to_the_Questions_8_6_2019.pdf PDF
sf30_Continuation.pdf PDF
Amendment_01-SP4702-19-R-0019-SF30.pdf PDF
Combined_Plans_CSC-19719.pdf PDF
_6_ENG_FORM_4025-R.pdf PDF
DSCC_Excavation_Permit.pdf PDF
_2_ENG_FORM_93.pdf PDF
Soliciatation_SP4702-19-R-0019.pdf PDF
Attachment__01_WDOL.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

bid forms

BID FORM (FOUO)
PROJECTCSC-19719SHEET1OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0001ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair Loading Dock Ceiling & Fire Suppression Systems in Pod CCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET2OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0002ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Renovation to Nurse StationCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET3OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0003ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair to Sanitary Lines within Kitchen Floor & Exterior Concrete Patio.CHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET4OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0004ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair to Low Level Walkway Lighting SystemsCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET5OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0005ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair to Loading Dock Enclosure SystemsCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET6OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0006ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair Window Leaks at Selected LocationsCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET7OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0007ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair to Storm Drain Pipes on Decks in PODS A & CCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET8OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0008ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair to Floors of the Kitchen RoomsCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET9OF9
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCLIN-0009ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Repair toPAVERS by Concrete WalkwaysCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM (FOUO)
PROJECTCSC-19719SHEET1OF1
Project Title: M & R TO BUILDING 20 FY19DATE PREPARED
LOCATIONCOST SUMMARYESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEMSCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL COST INCL. OH, PROFIT & BOND COSTS
CLIN NODescriptionQTY.Unit
1Repair Loading Dock Ceiling & Fire Suppression Systems in Pod C1LS
2Renovation to Nurse Station1LS
3Repair to Sanitary Lines under Kitchen Floor1LS
4Repair to Low Level Walkway Lighting Systems1LS
5Repair to Loading Dock Enclosure Systems1LS
6Repair Window Leaks at Selected Locations1LS
7Repair to Storm Drain Pipes on Decks in PODS A & C1LS
8Repair to Floors of the Kitchen Rooms1LS
9Repair toPAVERS by Concrete Walkways1LS

SUB-TOTAL COST

TOTAL COST FOR THIS PROJECT