CONSTRUCTION COST ESTIMATE
PROJECT NO.CSC-18761DRAWING NO.3-1684 (13 Sheets)DATE:
PROJECT TITLE:Repair and Seal Floors, Buildings 9 & 30
ARCHITECT/ENGINEER:M. Rustam AliESTIMATOR:
PRELIMINARY DESIGNFINAL DESIGNXOTHER
Work to be performed by General Contractor.
CLIN 001- BUILDING 9 BID FORMS
ITEMQUANTITYMATERIALLABOREQUIP COSTTOTAL DIRECT COST
NO. OF UNITSUNIT OF MEASUREPER UNITTOTALUNIT MANHOURTOTAL MANHOURSRATE PER HOURTOTAL
DIVISION 01-General Requirements
Project Management
Project ManagerJOB
Technical Submittals & Documentation PreparationJOB
Quality Contol Testing & Inspecting Services on siteJOB
Temporary Environmental Control & Waste Management on siteJOB
Mobilization & Demobilization CostsJOB
Total Direct Cost
DIVISION 02-Existing Conditions
Removal of expansion joint materials from floor joints in Sections 5-13LF
Total Direct Cost
DIVISION 03-Concrete
Concrete Rehabilitation:
Seal cracks sizes 1/4" x 1/2" and higher by using Eco-PJS ( semi-rigid two-component polyurea ) joint filler material for concrete floors @ the rate of 150 LF/ GAL in Sections 5-13.LF
Concrete Patching & Leveling Work- Grinding, cleaning and patching with epoxy grout, 1/4" thick on entire floorSF
Total Direct Cost
DIVISION 07-Thermal & Moisture Protection
Replacement of existing epoxy mortar with semirigid epoxy sealant expansion joint by using Eco-EJF Eco-PJS semi-rigid two-component polyurea joint filler to construct expansion joints in Sections 5-13LF
Total Direct Cost
DIVISION 09-Finishes
High-Performance Coatings
Concrete Floor Surface Preparation- Clean dirt, oil, grease & previously coated epoxy system by grinding with grinder includes hauling & disposal off DSCC in Sections 5-13.S.F.
Coating Maretial Preparation- Mix & prepare coating materials for primer, seed coating with silica sand, grout coating & top coatings incl. Materials and labor only.JOB
Application of 9 mils prime coating Materials on cleaned prepared concrete floors @ the rate of 180 SF/GAL.S.F.
Application of 15 mils seed coating with silica sand over prime coated floors @ the rate of 107 SF/GAL.S.F.
Application of 15 mils grout coating with silica sand over seed coated floors @the rate of 107 SF/GAL.S.F.
Application of 3 mils Satin Urethane top coating Materials over new seal coating floors @ the rate of 500 SF/ GAL.S.F.
Total Direct Cost00
SUB-TOTAL OF DIRECT COSTS
ADDED OVERHEAD
ADDED PROFIT
ADDED BOND COSTS
TOTAL ESTIMATED PROJECT COST FOR BUILDING 9
CONSTRUCTION COST ESTIMATE
PROJECT NO.CSC-18761DRAWING NO.3-1684 (13 Sheets)DATE:
PROJECT TITLE:Repair and Seal Floors, Buildings 9 & 30
ARCHITECT/ENGINEER:M. Rustam AliESTIMATOR:
PRELIMINARY DESIGNFINAL DESIGNXOTHER
Work to be performed by General Contractor.
CLIN 002- BUILDING 30 BID FORMS
ITEMQUANTITYMATERIALLABOREQUIP COSTTOTAL DIRECT COST
NO. OF UNITSUNIT OF MEASUREPER UNITTOTALUNIT MANHOURTOTAL MANHOURSRATE PER HOURTOTAL
DIVISION 01-General Requirements
Project Management
Project ManagerJOB
Technical Submittals & Documentation PreparationJOB
Quality Contol Testing & Inspecting Services on siteJOB
Temporary Environmental Control & Waste Management on siteJOB
Mobilization & Demobilization CostsJOB
Total Direct Cost
DIVISION 02-Existing Conditions
Removal of expansion joint materials from floor joints in Sections 5-13LF
Total Direct Cost
DIVISION 03-Concrete
Concrete Rehabilitation:
Seal cracks sizes 1/4" x 1/2" and higher by using Eco-PJS ( semi-rigid two-component polyurea ) joint filler material for concrete floors @ the rate of 150 LF/ GAL in Sections 5-13.LF
Concrete Patching & Leveling Work- Grinding, cleaning and patching with epoxy grout, 1/4" thick at patching locationsSF
Total Direct Cost
DIVISION 07-Thermal & Moisture Protection
Replacement of existing epoxy mortar with semirigid epoxy sealant expansion joint by using Eco-EJF Eco-PJS semi-rigid two-component polyurea joint filler to construct expansion joints in Sections 5-13LF
Total Direct Cost
DIVISION 09-Finishes
High-Performance Coatings
Concrete Floor Surface Preparation- Clean dirt, oil, grease & previously coated epoxy system by grinding with grinder includes hauling & disposal off DSCC.S.F.
Coating Maretial Preparation- Mix & prepare coating materials for primer, 1/4" power-trowel epoxy overlay resurfacer & top coatings incl. materials and labor only.JOB
Application of 9 mils prime coating Materials on cleaned prepared concrete floors @ the rate of 180 SF/GAL.S.F.
Application of 1/4" Power-Trowel Epoxy Overlay Resurfacer over prime coated floors.S.F.
Application of 8 mils seal coating Materials over new 1/4" epoxy resurfacer floors @ the rate of 200 SF/GAL.S.F.
Application of 3 mils Satin Urethane top coating Materials over new seal coating floors @ the rate of 500 SF/ GAL.S.F.
Total Direct Cost
SUB-TOTAL OF DIRECT COSTS
ADDED OVERHEAD
ADDED PROFIT
ADDED BOND COSTS
TOTAL ESTIMATED PROJECT COST FOR BUILDING 30
CONSTRUCTION COST ESTIMATE
PROJECT NO.CSC-18761DRAWING NO.3-1684 (13 Sheets)DATE:
PROJECT TITLE:Repair and Seal Floors, Buildings 9 & 30
ARCHITECT/ENGINEER:M. Rustam AliESTIMATOR:
PRELIMINARY DESIGNFINAL DESIGNXOTHER
Work to be performed by General Contractor.
SUMMARY SHEET
ITEMQUANTITYMATERIALLABOREQUIP COSTTOTAL COST
NO. OF UNITSUNIT OF MEASUREPER UNITTOTALUNIT MANHOURTOTAL MANHOURSRATE PER HOURTOTAL
CLIN # 001-TOTAL COST FOR BUILDING 9
CLIN # 002-TOTAL COST FOR BUILDING 30
TOTAL ESTIMATED PROJECT COST