Questions & Answers for Project: CSC-18761 Repair & Seal Floors building 9 & 30, Solicitation

SP4702-19-R-0008

1. Can the QC & Superintendent be the same person?

Reply: Yes

2. Can the QC and superintendent work both buildings at the same time?

3. Can we also be working both buildings at the same time?

Building 9:

1. What is the scheduling and phasing of this building? Can we do the whole building at the same time or half at a time for example?

Reply: (2) Sections at a time only

2. Current concrete slabs aren’t level with each other, are we supposed to level them? Leave them as are? Or thin coat where need to level them?

Reply: Contractor is required to level concrete slabs prior to repair cracks. Unevenness concrete floor shall be repaired by grinding, leveling and patching in accordance with Specification Section 03 01 30.71 Concrete Rehabilitation.

3. For depth repair of concrete, from damage concrete areas how far past the damage are we supposed to cut out and repair?

Reply: No less than 1” past the crack/ damage area.

Building 30:

4. Does the Rack system stay?

5. The items one the rack system will they be empty?

Reply: No

6. Does the high stuff stay or will it be removed?

Reply: It will stay. No removal is required.

7. What space from floor to first rack system shelving will there be for our equipment to operate underneath?

Reply: Yes. Government will remove materials that is on the floor only.

8. What are we supposed to do at the determination points?

Reply: See detail G/13 on sheet 13 of 13 for the termination point detail.

9. What is the scheduling/phasing of this building look like all bays at the same time or 2 at a time?

Reply: Maximum (2) sections at a time only.

10. What is the quantity of crack fill and where on the bid sheet?

Reply: See GENERAL NOTES, ITEM NO. 1 for the clarification about quantity of crack fill work. It is shown under DIVISION 3 CONCRETE item on the bid sheets.