PROJECT NO. DATE:
PROJECT TITLE:
PRELIMINARY DESIGN OTHER
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
Scissors Lift MO
Dumpster wk
Demolition (Unit Heaters, Pipe, AHU) LS
Hydronic Unit Heaters ea
Infrared Heater System LS
Boiler Circulation Pumps LS
Hydronic Piping LS
Natural Gas Piping LS
Pipe Insulation LS
Pipe Specialties (Valves, Strainers, Control Valves, etc.)
LS
Gas Meter and Regulators LS
VFD's LS
Controls Work LS
Electrical Work LS
SUBTOTAL
OH
profit bond
TOTAL
ITEM TOTAL
COST
DRAWING NO.
Repair Heating System, Bldg 17
ARCHITECT/ENGINEER:
QUANTITY MATERIAL LABOR
4-569
FINAL DESIGN
EQUIP COST
ESTIMATOR:
CSC-16749
CONSTRUCTION COST ESTIMATE
Klingler
Solicitation Attachment #3 SP4702-17-R-0032 Page 1 of 2
PROJECT NO. DATE:
PROJECT TITLE:
PRELIMINARY DESIGN OTHER
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
Scissors Lift MO
Dumpster wk
Asbestos Abatement LS
Demolition (Unit Heaters, Pipe, AHU's, etc.) LS
Unit Heaters LS
Sch 40, Pipe LS
Sch 80, Pipe LS
Pipe Insulation LS
Piping Specialties (Steam Traps, Valves, Unions, Strainers, etc.)
LS
DDC Controls LS
Electric LS
SUBTOTAL
OH
profit bond
TOTAL
CSC-16778
CONSTRUCTION COST ESTIMATE
ITEM TOTAL
COST
DRAWING NO.
REPAIR HEATING SYSTEM, BLDG 9
ARCHITECT/ENGINEER:
QUANTITY MATERIAL LABOR
4-574
FINAL DESIGN
EQUIP COST
Klingler ESTIMATOR:
Solicitation Attachment #3 SP4702-17-R-0032 Page 2 of 2