Solicitation_Attachment__1.pdf

PDF 3 MB Posted

Attached to
CSC-16749 & CSC-16778, Repair Heating Systems BLDG 9 & 17
Solicitation number
SP4702-17-R-0032
Issued by

About this file

Solicitation Attachment #1 - Drawings for CSC-16749 (BLDG 17)

View the file

Other files

File Type Posted
Site_Visit_sign-in_sheet.pdf PDF
SF30_SP470217R00320001.pdf PDF
CSC-16749_-_Revised_Sheets_9_&_10.pdf PDF
BLDG_9_-_water_line_sizes.pdf PDF
Solicitation_Attachment__4.pdf PDF
SF1442_SP4702-17-R-0032.pdf PDF
Solicitation_Attachment__3.pdf PDF
Solicitation_Attachment__2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R

H W S

H W S

H W S

H W S

H W S

HWS

H W S

H W S

H W S

H W R

H W S

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W S

H W R

H W S H W S H W S

H W S

H W R

H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W R

HWRHWRHWR

H W S

H W R

H W S

H W R

H W R H W R

HWS

H W S

H W S

H W S

H W S

H W S

H W S

HWR

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W R

HWR

H W R

H W S

H W R

H W S

H W R

H W S

H W R

H W S

HWSHWS

HWR

H W S

HWR

H W R

HWS

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W S

H W S

H W R

H W S H W S H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

HWRHWRHWRHWRHWR

H W R

H W R

H W R

H W S

H W S

H W S

H W R

H W R

H W R

H W S

H W S

H W S

H W R

H W S

H W S

HWR

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W R

H W S

H W R

HWS

H W R

H W S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECTION NO.1

AutoCAD SHX Text

SECTION NO.2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text CODED NOTES: 1. REMOVE EXISTING UNIT HEATER. DDC CONTROLS AND TEMPERATURE SENSOR TO REMOVE EXISTING UNIT HEATER. DDC CONTROLS AND TEMPERATURE SENSOR TO REMAIN FOR CONNECTION TO NEW UNIT HEATER. 2. REMOVE EXISTING UNIT HEATER AND ASSOCIATED PIPING BACK TO HOT WATER REMOVE EXISTING UNIT HEATER AND ASSOCIATED PIPING BACK TO HOT WATER SUPPLY AND RETURN MAINS. CAP PIPE AT MAIN. REMOVE ALL ASSOCIATED CONTROLS AND TEMPERATURE SENSORS FOR HEATER.

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

HW RETURN

AutoCAD SHX Text

HW SUPPLY

AutoCAD SHX Text

UNIT HEATER

AutoCAD SHX Text T

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE GOVERNMENT PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE GOVERNMENT AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT THE GOVERNMENT OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT.

AutoCAD SHX Text

FIELD VERIFY ALL CONDITIONS

AutoCAD SHX Text GENERAL NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT WATER SYSTEM THAT MAY BE REQUIRED. WATER SHALL BE DRAINED TO SANITARY SEWER. 2. AT NO TIME DURING THE HEATING SEASON, TYPICALLY OCTOBER 1ST THRU APRIL AT NO TIME DURING THE HEATING SEASON, TYPICALLY OCTOBER 1ST THRU APRIL 1ST, SHALL THE HEATING SYSTEM BE TAKEN OUT OF OPERATION.

AutoCAD SHX Text

BUILDING 17 DEMOLITION SECTIONS 1-2

AutoCAD SHX Text

SCALE: 1/16" = 1'

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

FACILITIES ENGINEERING OFFICE

AutoCAD SHX Text

BUILDING 308

AutoCAD SHX Text

INSTALLATION MANAGEMENT DIVISION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

FACILITY ENGINEER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DS-FCE (ENVIRONMENTAL)

AutoCAD SHX Text

DEPUTY FACILITY ENGINEER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DS-FCS (SECURITY)

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text DEFENSE LOGISTICS AGENCY DEFENSE SUPPLY CENTER COLUMBUS COLUMBUS, OHIO 43218-3990

AutoCAD SHX Text

SHEET REFERENCE NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DS-FCO (SAFETY)

AutoCAD SHX Text

MARK

AutoCAD SHX Text 1/16" =1'

AutoCAD SHX Text 1-Jun-17

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4-569

AutoCAD SHX Text

DEMOLITION SECTIONS 1 & 2

AutoCAD SHX Text

CSC-16749

AutoCAD SHX Text

REPAIR HEATING SYSTEM, BLDG. 17

VH

H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S

H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W S H W S H W S

H W S

H W S

H W R

H W R

H W S

H W S

H W S

H W S

H W S

HWSHWSHWS

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

HWR

H W R

H W S

H W S H W S H W S

HWRHWR

HWR

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R H W R H W R H W R H W R H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

HWSHWS

H W S

H W S

H W R

HWS

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W S

H W R

H W S H W S H W S

H W S

H W R

H W S

H W R

H W S H W S H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W S H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R H W R

H W R

H W S

H W R

H W R H W R H W R

H W S

H W R

H W S

H W R

H W S

H W R

H W S

H W S

H W S

H W R

H W R

H W R

H W R

HWS

H W R

H W S

HWSHWS

H W R H W R

HWSHWS

H W R H W R

HWS

H W R

H W R H W R

HWSHWSHWS

HWRHWR

HWSHWS

H W R

H W S

H W R

H W S

H W R H W R

HWSHWS

H W R

H W S

H W S

H W S

H W R

H W R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECTION NO.3

AutoCAD SHX Text

SECTION NO.4

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text CODED NOTES: 1. REMOVE EXISTING UNIT HEATER. DDC CONTROLS AND TEMPERATURE SENSOR TO REMOVE EXISTING UNIT HEATER. DDC CONTROLS AND TEMPERATURE SENSOR TO REMAIN FOR CONNECTION TO NEW UNIT HEATER. 2. REMOVE EXISTING UNIT HEATER AND ASSOCIATED PIPING BACK TO HOT WATER REMOVE EXISTING UNIT HEATER AND ASSOCIATED PIPING BACK TO HOT WATER SUPPLY AND RETURN MAINS. CAP PIPE AT MAIN. REMOVE ALL ASSOCIATED CONTROLS AND TEMPERATURE SENSORS FOR HEATER. 3. REMOVE EXISTING UNIT HEATER AND RELOCATE TO NEW LOCATION SHOWN ON REMOVE EXISTING UNIT HEATER AND RELOCATE TO NEW LOCATION SHOWN ON SHEET 5. REMOVE ASSOCIATED PIPING BACK TO LOCATION SHOWN. REMOVE ALL ASSOCIATED CONTROLS AND RELOCATE TO NEW LOCATION SHOWN ON SHEET 5. 4. REMOVE EXISTING AHU UNIT, ASSOCIATED PIPING AND DUCTWORK. CAP PIPING REMOVE EXISTING AHU UNIT, ASSOCIATED PIPING AND DUCTWORK. CAP PIPING AT MAIN.

AutoCAD SHX Text

HW RETURN

AutoCAD SHX Text

HW SUPPLY

AutoCAD SHX Text

UNIT HEATER

AutoCAD SHX Text T

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE GOVERNMENT PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE GOVERNMENT AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT THE GOVERNMENT OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT.

AutoCAD SHX Text

FIELD VERIFY ALL CONDITIONS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 17 DEMOLITION SECTIONS 3-4

AutoCAD SHX Text

SCALE: 1/16" = 1'

AutoCAD SHX Text

NORTH

AutoCAD SHX Text GENERAL NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT WATER SYSTEM THAT MAY BE REQUIRED. WATER SHALL BE DRAINED TO SANITARY SEWER. 2. AT NO TIME DURING THE HEATING SEASON, TYPICALLY OCTOBER 1ST THRU APRIL AT NO TIME DURING THE HEATING SEASON, TYPICALLY OCTOBER 1ST THRU APRIL 1ST, SHALL THE HEATING SYSTEM BE TAKEN OUT OF OPERATION.

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

FACILITIES ENGINEERING OFFICE

AutoCAD SHX Text

BUILDING 308

AutoCAD SHX Text

INSTALLATION MANAGEMENT DIVISION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

FACILITY ENGINEER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DS-FCE (ENVIRONMENTAL)

AutoCAD SHX Text

DEPUTY FACILITY ENGINEER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DS-FCS (SECURITY)

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text DEFENSE LOGISTICS AGENCY DEFENSE SUPPLY CENTER COLUMBUS COLUMBUS, OHIO 43218-3990

AutoCAD SHX Text

SHEET REFERENCE NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DS-FCO (SAFETY)

AutoCAD SHX Text

MARK

AutoCAD SHX Text 1/16" = 1'

AutoCAD SHX Text 1-Jun-17

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4-569

AutoCAD SHX Text

DEMOLITION SECTIONS 3 & 4

AutoCAD SHX Text

CSC-16749

H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R

W S

H W S

H W S

H W S

H W S

H W S

H W S

HWS

H W S

H W S

H W S

H W R

H W S

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W S

H W R

H W S H W S H W S

H W S

H W R

H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W R

HWRHWRHWR

H W S

H W R

H W S

H W R

H W R H W R

HWS

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W R

HWR

H W R

H W S

H W R

H W S

H W S

HWR

H W R

HWS

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W S

H W S

H W R

H W S H W S H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

HWRHWRHWRHWRHWR

H W R

H W R

H W R

H W S

H W S

H W S

H W R

H W R

H W R

H W S

H W S

H W S

H W R

H W S

H W S

HWR

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W R

H W S

H W R

H W S

H W R

H W R

H W S

H W S

HWR

G G

G G

G G

G G

G

G G

G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECTION NO.1

AutoCAD SHX Text

SECTION NO.2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

HW RETURN

AutoCAD SHX Text

HW SUPPLY

AutoCAD SHX Text

NEW UNIT HEATER

AutoCAD SHX Text T

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

DDC FIELD PANEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UH-1

AutoCAD SHX Text T

AutoCAD SHX Text DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE GOVERNMENT PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE GOVERNMENT AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT THE GOVERNMENT OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT.

AutoCAD SHX Text

FIELD VERIFY ALL CONDITIONS

AutoCAD SHX Text

UH-2

AutoCAD SHX Text CODED NOTES: 1. PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURER'S RECOMMENDATION. CONNECT UNIT PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURER'S RECOMMENDATION. CONNECT UNIT HEATER TO EXISTING ELECTRIC CIRCUIT, CONTROL VALVE, DDC CONTROLLER AND TEMPERATURE SENSOR. SEE SCHEDULE SHEET 7. 2. PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURE'S RECOMMENDATIONS. INSTALL NEW 1-1/4" PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURE'S RECOMMENDATIONS. INSTALL NEW 1-1/4" HOT WATER SUPPLY AND RETURN PIPING FROM MAIN TO UNIT HEATER. PIPING SHALL BE ASTM A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL, SEAMLESS. WHERE PIPE NEEDS REDUCED USE ECCENTRIC REDUCERS. INSULATE NEW PIPE WITH 1" FIBERGLASS INSULATION WITH ALL SERVICE JACKET. PROVIDE NEW DDC CONTROLLER, ELECTRIC CIRCUIT, SPACE TEMPERATURE SENSOR AND CONTROL VALVE. SEE SCHEDULE SHEET 7.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1-1/4"

AutoCAD SHX Text

BUILDING 17 NEW WORK SECTIONS 1-2

AutoCAD SHX Text

SCALE: 1/16" = 1'

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

NATURAL GAS PIPE

AutoCAD SHX Text GENERAL NOTES: 1. PROVIDE NEW GAS PIPING AS SHOWN. GAS LINE SHALL BE INSTALLED 13' AFF. PIPING SHALL CONFORM TO ASTM PROVIDE NEW GAS PIPING AS SHOWN. GAS LINE SHALL BE INSTALLED 13' AFF. PIPING SHALL CONFORM TO ASTM A53/A53M, GRADE B, SCHEDULE 40 BLACK STEEL, SEAMLESS. PROVIDE THREADED ENDS FOR SIZES 2 INCHES AND SMALLER; OTHERWISE, PLAIN END BEVELED FOR BUTT WELDING. PROVIDE PIPE IDENTIFICATION CONFORMING TO ASME A13.1. PROVIDE IDENTIFICATION A MINIMUM OF EVERY 20' ON PIPING. 2. ALL NATURAL GAS WORK SHALL BE IN ACCORDANCE WITH THE LATEST REVISION OF THE NATIONAL FUEL GAS CODE ALL NATURAL GAS WORK SHALL BE IN ACCORDANCE WITH THE LATEST REVISION OF THE NATIONAL FUEL GAS CODE NFPA 54/ANSIZ233.1. 3. EXISTING HEATER CONTROL SYSTEM IS MANUFACTURED BY AUTOMATED LOGIC. ALL NEW CONTROLLERS AND C0NTROL EXISTING HEATER CONTROL SYSTEM IS MANUFACTURED BY AUTOMATED LOGIC. ALL NEW CONTROLLERS AND C0NTROL SYSTEM COMPONENTS MUST BE COMPATIBLE WITH EXISTING AUTOMATED LOGIC CONTROL SYSTEM. AFTER INSTALLATION OF HEATERS IS COMPLETE SYSTEM SOFTWARE SHALL BE UPDATED TO ADD NEW HEATERS. CONTRACTOR SHALL APPLY ALL NECESSARY SYSTEM UPDATES TO EXISTING AUTOMATED LOGIC SOFTWARE.

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

FACILITIES ENGINEERING OFFICE

AutoCAD SHX Text

BUILDING 308

AutoCAD SHX Text

INSTALLATION MANAGEMENT DIVISION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

FACILITY ENGINEER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DS-FCE (ENVIRONMENTAL)

AutoCAD SHX Text

DEPUTY FACILITY ENGINEER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DS-FCS (SECURITY)

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text DEFENSE LOGISTICS AGENCY DEFENSE SUPPLY CENTER COLUMBUS COLUMBUS, OHIO 43218-3990

AutoCAD SHX Text

SHEET REFERENCE NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DS-FCO (SAFETY)

AutoCAD SHX Text

MARK

AutoCAD SHX Text 1/16" = 1'

AutoCAD SHX Text 8-Aug-17

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4-569

AutoCAD SHX Text

NEW WORK SECTIONS 1 & 2

AutoCAD SHX Text

CSC-16749

H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S

H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R H W R

H W S H W S H W S

HWSHWSHWS

H W R

H W R

HWR

H W R

H W S

H W R H W R H W R H W R H W R H W R

HWSHWS

H W S

H W S

H W S

H W R

H W S

H W R

H W S H W S H W S

H W S

H W R

H W S

H W R

H W S H W S H W S

H W S

H W R

H W S H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R H W R

H W R

H W S

H W R

H W R H W R H W R

H W S

H W R

H W S

H W R

H W S

H W R

H W S

H W R

H W R

HWS

H W R

H W S

H W R H W R

H W S H W S

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W S

H W S

H W S

H W S

H W R

H W R

G G

G G

G G

G G

G G

G G

G G G G G G G G G G G G

G

G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECTION NO.3

AutoCAD SHX Text

SECTION NO.4

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

HW RETURN

AutoCAD SHX Text

HW SUPPLY

AutoCAD SHX Text

UNIT HEATER

AutoCAD SHX Text T

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

UH-1

AutoCAD SHX Text DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE GOVERNMENT PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE GOVERNMENT AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT THE GOVERNMENT OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT.

AutoCAD SHX Text

FIELD VERIFY ALL CONDITIONS

AutoCAD SHX Text

INFRARED HEATER

AutoCAD SHX Text T

AutoCAD SHX Text

VP-1

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text 1-1/4"

AutoCAD SHX Text 1-1/4"

AutoCAD SHX Text

AutoCAD SHX Text

IH-2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

BUILDING 17 NEW WORK SECTIONS 3-4

AutoCAD SHX Text

SCALE: 1/16" = 1'

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1-1/4"

AutoCAD SHX Text 1-1/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text T

AutoCAD SHX Text CODED NOTES: 1. PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURER'S RECOMMENDATION. CONNECT UNIT HEATER TO EXISTING ELECTRIC CIRCUIT, CONTROL VALVE, DDC PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURER'S RECOMMENDATION. CONNECT UNIT HEATER TO EXISTING ELECTRIC CIRCUIT, CONTROL VALVE, DDC CONTROLLER AND TEMPERATURE SENSOR. SEE SCHEDULE SHEET 8. 2. PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURE'S RECOMMENDATIONS. INSTALL NEW 1-1/4" HOT WATER SUPPLY AND RETURN PIPING FROM MAIN TO UNIT PROVIDE NEW UNIT HEATER. INSTALL UNIT PER MANUFACTURE'S RECOMMENDATIONS. INSTALL NEW 1-1/4" HOT WATER SUPPLY AND RETURN PIPING FROM MAIN TO UNIT HEATER. PIPING SHALL BE ASTM A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL, SEAMLESS. WHERE PIPE NEEDS REDUCED USE ECCENTRIC REDUCERS. INSULATE NEW PIPE WITH 1" FIBERGLASS INSULATION WITH ALL SERVICE JACKET. PROVIDE NEW DDC CONTROLLER, ELECTRIC CIRCUIT, SPACE TEMPERATURE SENSOR AND CONTROL VALVE. SEE SCHEDULE SHEET 8. SEE DETAIL SHEET 7. 3. INSTALL EXISTING UNIT HEATER AT NEW LOCATION. INSTALL UNIT PER MANUFACTURE'S RECOMMENDATIONS. RELOCATE CONTROL VALVE, THERMOSTAT, DDC CONTROLLER, INSTALL EXISTING UNIT HEATER AT NEW LOCATION. INSTALL UNIT PER MANUFACTURE'S RECOMMENDATIONS. RELOCATE CONTROL VALVE, THERMOSTAT, DDC CONTROLLER, ELECTRIC CIRCUIT AND ALL ASSOCIATED APPURTENANCES TO NEW LOCATION. 4. INSTALL NEW INFRARED TUBE CONDENSING HEATING SYSTEM. PROVIDE VACUUM PUMP PACKAGE SIZED BY MANUFACTURER TO HANDLE LOAD OF SYSTEM AND MOUNT ON INSTALL NEW INFRARED TUBE CONDENSING HEATING SYSTEM. PROVIDE VACUUM PUMP PACKAGE SIZED BY MANUFACTURER TO HANDLE LOAD OF SYSTEM AND MOUNT ON WALL AT LOCATION SHOWN. SYSTEM SHALL HAVE (4) BURNERS SIZED AT 100 MBH EACH. INSTALL UNITS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. INSTALL SYSTEM LEVEL WITH EXISTING LIGHTS IN THE AREA APPROXIMATELY 11' AFF. SEE SCHEDULE SHEET 7. 5. INSTALL NEW INFRARED MODULATING TUBE HEATER. INSTALL UNIT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. VENT UNIT TO OUTSIDE IN ACCORDANCE INSTALL NEW INFRARED MODULATING TUBE HEATER. INSTALL UNIT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. VENT UNIT TO OUTSIDE IN ACCORDANCE WITH THE LATEST REVISION OF THE NATIONAL FUEL GAS CODE NFPA 54/ANSI Z223.1. 6. INSTALL GAS REGULATOR AT LOCATION SHOWN. REGULATOR SHALL CONFIGURED TO SUPPLY 515 CFH @ 14" W.C.INSTALL GAS REGULATOR AT LOCATION SHOWN. REGULATOR SHALL CONFIGURED TO SUPPLY 515 CFH @ 14" W.C.

AutoCAD SHX Text

IH-1

AutoCAD SHX Text

IH-1

AutoCAD SHX Text

IH-1

AutoCAD SHX Text

IH-1

AutoCAD SHX Text GENERAL NOTES: 1. PROVIDE NEW GAS PIPING AS SHOWN. GAS LINE SHALL BE INSTALLED 13' AFF. PIPING SHALL CONFORM TO ASTM A53/A53M, GRADE B, SCHEDULE 40 BLACK STEEL, PROVIDE NEW GAS PIPING AS SHOWN. GAS LINE SHALL BE INSTALLED 13' AFF. PIPING SHALL CONFORM TO ASTM A53/A53M, GRADE B, SCHEDULE 40 BLACK STEEL, SEAMLESS. PROVIDE THREADED ENDS FOR SIZES 2 INCHES AND SMALLER; OTHERWISE, PLAIN END BEVELED FOR BUTT WELDING. PROVIDE PIPE IDENTIFICATION CONFORMING TO ASME A13.1. PROVIDE IDENTIFICATION A MINIMUM OF EVERY 20' ON PIPING. 2. ALL NATURAL GAS WORK SHALL BE IN ACCORDANCE WITH THE LATEST REVISION OF THE NATIONAL FUEL GAS CODE NFPA 54/ANSIZ233.1. ALL NATURAL GAS WORK SHALL BE IN ACCORDANCE WITH THE LATEST REVISION OF THE NATIONAL FUEL GAS CODE NFPA 54/ANSIZ233.1. 3. EXISTING HEATER CONTROL SYSTEM IS MANUFACTURED BY AUTOMATED LOGIC. ALL NEW CONTROLLERS AND C0NTROL SYSTEM COMPONENTS MUST BE COMPATIBLE EXISTING HEATER CONTROL SYSTEM IS MANUFACTURED BY AUTOMATED LOGIC. ALL NEW CONTROLLERS AND C0NTROL SYSTEM COMPONENTS MUST BE COMPATIBLE WITH EXISTING AUTOMATED LOGIC CONTROL SYSTEM. AFTER INSTALLATION OF HEATERS IS COMPLETE SYSTEM SOFTWARE SHALL BE UPDATED TO ADD NEW HEATERS. CONTRACTOR SHALL APPLY ALL NECESSARY SYSTEM UPDATES TO EXISTING AUTOMATED LOGIC SOFTWARE.

AutoCAD SHX Text

NATURAL GAS PIPE

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

FACILITIES ENGINEERING OFFICE

AutoCAD SHX Text

BUILDING 308

AutoCAD SHX Text

INSTALLATION MANAGEMENT DIVISION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

FACILITY ENGINEER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DS-FCE (ENVIRONMENTAL)

AutoCAD SHX Text

DEPUTY FACILITY ENGINEER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DS-FCS (SECURITY)

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text DEFENSE LOGISTICS AGENCY DEFENSE SUPPLY CENTER COLUMBUS COLUMBUS, OHIO 43218-3990

AutoCAD SHX Text

SHEET REFERENCE NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DS-FCO (SAFETY)

AutoCAD SHX Text

MARK

AutoCAD SHX Text 1/16" = 1'

AutoCAD SHX Text 8-Aug-17

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4-569

AutoCAD SHX Text

NEW WORK SECTIONS 3 & 4

AutoCAD SHX Text

CSC-16749

H W S H W S H W S H W S

W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W S H W S H W S H W S H W S H W S H W S H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W

R

H W R

H W R

H W

R

H W R

H W R

H W

R

H W

R

H W R

H W R

H W

R

H W S

H W S

H W S

H W S

H W R

H W R

H W R H W R H W R H W R H W R H W R H W RH W R H W R H W R H W R

H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S H W S

G G

H W S

H W S

H W S

H W S

H W R

H W R

G G G G G G

H W S H W S H W S H W S

H W S

H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W

R

H W R

H W R

H W R

H W R

H W S H W S H W S H W S H W S H W S H W S H W S

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W R

H W

R

H W R

H W R

G G

G G

G G

G G

G

AutoCAD SHX Text

BOILER PIPING SCHEMATIC SCALE: NONENONE

AutoCAD SHX Text

SAFETY RELIEF VALVE

AutoCAD SHX Text

PRESSURE/TEMPERATURE GAUGE

AutoCAD SHX Text

FLOW SWITCH

AutoCAD SHX Text

SHUT OFF VALVE

AutoCAD SHX Text

TEMPERATURE GAUGE

AutoCAD SHX Text

BOILER CIRCULATING PUMP

AutoCAD SHX Text

STRAINER

AutoCAD SHX Text

BALANCE VALVE

AutoCAD SHX Text

SHUT OFF VALVE

AutoCAD SHX Text

SAFETY RELIEF VALVE

AutoCAD SHX Text

PRESSURE/TEMPERATURE GAUGE

AutoCAD SHX Text

FLOW SWITCH

AutoCAD SHX Text

SHUT OFF VALVE

AutoCAD SHX Text

TEMPERATURE GAUGE

AutoCAD SHX Text

BOILER CIRCULATING PUMP

AutoCAD SHX Text

STRAINER

AutoCAD SHX Text

BALANCE VALVE

AutoCAD SHX Text

BALANCE VALVE

AutoCAD SHX Text

SHUT OFF VALVE

AutoCAD SHX Text

RETURN FROM BUILDING

AutoCAD SHX Text

SUPPLY TO SYSTEM PUMP AND BUILDING

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

BALANCE VALVE

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

BOILER

AutoCAD SHX Text GENERAL NOTES: 1. MECHANICAL LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL DROPS, RISES, OR OFFSETS REQUIRED FOR A MECHANICAL LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL DROPS, RISES, OR OFFSETS REQUIRED FOR A COMPLETE INSTALLATION. COORDINATE EXACT ROUTING OF WORK WITH ALL OTHER TRADES AND OBSTRUCTIONS. COORDINATE EXACT LOCATIONS OF CEILING MOUNTED WORK WITH LIGHTS, CEILING GRID, AND OTHER OBSTRUCTIONS. NEW WORK SHOWN IN BOLD. 2. CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT WATER SYSTEM THAT MAY BE REQUIRED. CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT WATER SYSTEM THAT MAY BE REQUIRED. WATER SHALL BE DRAINED TO SANITARY SEWER.

AutoCAD SHX Text

GAS LINE DISCONNECTION POINT

AutoCAD SHX Text B-1

AutoCAD SHX Text B-2

AutoCAD SHX Text P-1

AutoCAD SHX Text P-2

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BP-1

AutoCAD SHX Text

BP-2

AutoCAD SHX Text GENERAL NOTES: 1. MECHANICAL LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL DROPS, RISES, OR OFFSETS REQUIRED FOR A MECHANICAL LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL DROPS, RISES, OR OFFSETS REQUIRED FOR A COMPLETE INSTALLATION. COORDINATE EXACT ROUTING OF WORK WITH ALL OTHER TRADES AND OBSTRUCTIONS. COORDINATE EXACT LOCATIONS OF CEILING MOUNTED WORK WITH LIGHTS, CEILING GRID, AND OTHER OBSTRUCTIONS. NEW WORK SHOWN IN BOLD. 2. CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT WATER SYSTEM THAT MAY BE CONTRACTOR IS RESPONSIBLE FOR ANY DRAINING AND REFILLING OF THE HOT WATER SYSTEM THAT MAY BE REQUIRED. WATER SHALL BE DRAINED TO SANITARY SEWER. 3. INSTALL NEW HOT WATER SUPPLY AND RETURN PIPING AS SHOWN. HOT WATER PIPING SHALL BE ASTM A53/A53M, INSTALL NEW HOT WATER SUPPLY AND RETURN PIPING AS SHOWN. HOT WATER PIPING SHALL BE ASTM A53/A53M, GRADE B, SCHEDULE 40, BLACK STEEL, SEAMLESS. WHERE PIPE NEEDS REDUCED USE ECCENTRIC REDUCERS. INSULATE NEW PIPE WITH 2" FIBERGLASS WITH ALL SERVICE JACKET. 4. PROVIDE NEW GAS PIPING AS SHOWN. PIPING SHALL CONFORM TO ASTM A53/A53M, GRADE B, SCHEDULE 40 PROVIDE NEW GAS PIPING AS SHOWN. PIPING SHALL CONFORM TO ASTM A53/A53M, GRADE B, SCHEDULE 40 40 BLACK STEEL, SEAMLESS. PROVIDE THREADED ENDS FOR SIZES 2 INCHES AND SMALLER; OTHERWISE, PLAIN END PROVIDE THREADED ENDS FOR SIZES 2 INCHES AND SMALLER; OTHERWISE, PLAIN END BEVELED FOR BUTT WELDING. PROVIDE PIPE IDENTIFICATION CONFORMING TO ASME A13.1. PROVIDE IDENTIFICATION A MINIMUM OF EVERY 20' ON PIPING.

AutoCAD SHX Text

GAS LINE CONNECTION POINT

AutoCAD SHX Text B-1

AutoCAD SHX Text B-2

AutoCAD SHX Text P-1

AutoCAD SHX Text P-2

AutoCAD SHX Text 3"

AutoCAD SHX Text CODED NOTES: 1. DISCONNECT EXISTING GAS LINE SUPPLY BOILERS AT LOCATION SHOWN. REMOVE PIPE FROM METER TO DISCONNECTION POINT. DISCONNECT EXISTING GAS LINE SUPPLY BOILERS AT LOCATION SHOWN. REMOVE PIPE FROM METER TO DISCONNECTION POINT.

AutoCAD SHX Text

BUILDING 17 MECHANICAL ROOM - EXISTING

AutoCAD SHX Text

SCALE: 1/4" = 1'

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

BUILDING 17 MECHANICAL ROOM - NEW

AutoCAD SHX Text

SCALE: 1/4" = 1'

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text CONTROL GENERAL NOTES: 1. UDATE BOILER CONTROL SEQUENCE AS STATED IN BOILER SYSTEM SEQUENCE OF CONTROLS. UDATE BOILER CONTROL SEQUENCE AS STATED IN BOILER SYSTEM SEQUENCE OF CONTROLS. 2. EXISTING BOILER SYSTEM CONTROLS MANUFACTURER IS SIEMENS.EXISTING BOILER SYSTEM CONTROLS MANUFACTURER IS SIEMENS.

AutoCAD SHX Text BOILER SYSTEM SEQUENCE OF OPERATIONS: PUMPS THE LEAD SECONDARY HEATING WATER PUMP OPERATES WHENEVER THE OUTDOOR AIR TEMPERATURE IS BELOW THE HIGH LIMIT SETPOINT. THE LAG PUMP DOES NOT OPERATE. THE LEAD SECONDARY PUMP IS SWITCHED WEEKLY. IF THE LEAD PUMP HAS NO POWER OR FAILS TO START (AS PROVEN BY THE FLOW SWITCH) WHEN ENABLED, AN ALARM IS ISSUED FOR THAT PUMP, THE PUMP IS DISABLED, AND THE LAG PUMP BECOMES THE LEAD PUMP AND IS ENABLED. IF THE NEW LEAD PUMP HAS NO POWER OR FAILS TO START (AS PROVEN BY THE FLOW SWITCH) WHEN ENABLED, AN ALARM IS ISSUED FOR THAT PUMP, AND BOTH PUMPS ARE DISABLED UNTIL THE SEQUENCE IS RESET. BOILERS WHEN A SECONDARY HEATING WATER PUMP IS ENABLED, THE LEAD BOILER CONTROLLER IS ENABLED, THE BOILER VALVE IS OPENED, AND THE BOILER PRIMARY PUMP IS STARTED. WHEN THE LEAD BOILER'S INTERNAL HEATING WATER FLOW SWITCH VERIFIES FLOW, THE BOILER CONTROLLER MODULATES THE BOILER FIRING TO PROVIDE HEATING WATER AT THE PRIMARY HEATING WATER SUPPLY SETPOINT TEMPERATURE. THE SECONDARY HEATING WATER MIXING VALVE MODULATES TO PROVIDE SECONDARY HEATING WATER AT THE SECONDARY HEATING WATER SUPPLY SETPOINT TEMPERATURE. IF, AFTER A TIME DELAY, THE SECONDARY HEATING WATER SUPPLY SETPOINT TEMPERATURE IS NOT ATTAINED, THE LAG BOILER CONTROLLER IS ENABLED, THE BOILER VALVE IS OPENED, AND THE BOILER PRIMARY PUMP IS STARTED. WHEN THE LAG BOILER'S INTERNAL HEATING WATER FLOW SWITCH VERIFIES FLOW, THE BOILER CONTROLLER MODULATES THE BOILER FIRING TO PROVIDE PRIMARY HEATING WATER AT THE PRIMARY HEATING WATER SUPPLY SETPOINT TEMPERATURE. THE LEAD BOILER IS SWITCHED WEEKLY. IF THE LEAD BOILER DOES NOT RECEIVE POWER WHEN REQUIRED OR THE BOILER CONTROLLER GENERATES AN ALARM, AN ALARM IS ISSUED FOR THAT BOILER, THE BOILER IS DISABLED, AND THE LAG BOILER BECOMES THE LEAD BOILER AND IS ENABLED. IF BOTH BOILERS DO NOT RECEIVE POWER WHEN REQUIRED OR BOTH BOILER CONTROLLERS GENERATE AN ALARM, AN ALARM IS ISSUED, THE BOILERS ARE DISABLED, THE BOILER VALVES OPEN FULLY, AND THE SECONDARY MIXING VALVE GOES TO THE FULL BOILER BYPASS POSITION. SUPPLY TEMPERATURE RESET THE PRIMARY HEATING WATER SUPPLY TEMPERATURE SETPOINT IS RESET PROPORTIONATELY FROM ITS MAXIMUM TEMPERATURE AT THE MINIMUM SCHEDULED OUTDOOR AIR TEMPERATURE TO ITS MINIMUM TEMPERATURE AT THE MAXIMUM SCHEDULED OUTDOOR AIR TEMPERATURE. THE SECONDARY HEATING WATER SUPPLY TEMPERATURE SETPOINT IS RESET PROPORTIONATELY FROM ITS MAXIMUM TEMPERATURE AT THE MINIMUM SCHEDULED OUTDOOR AIR TEMPERATURE TO ITS MINIMUM TEMPERATURE AT THE MAXIMUM SCHEDULED OUTDOOR AIR TEMPERATURE. SUPPLY TEMPERATURE ALARM IF THE SECONDARY HEATING WATER SUPPLY TEMPERATURE FALLS AND REMAINS BELOW THE SECONDARY HEATING WATER SETPOINT FOR LONGER THAN A SET DELAY, A HEATING WATER LOW TEMPERATURE ALARM IS ISSUED, BUT THE EQUIPMENT REMAINS IN OPERATION. EMERGENCY SHUTOFF SWITCH UPON ACTUATION OF THE EMERGENCY SHUTOFF SWITCH, THE PUMPS AND THE BOILERS ARE SHUT DOWN, AND AN ALARM IS ISSUED. PUMP VFD CONTROL: 1. ONCE ENABLED THE PUMP SPEED SHALL BE MODULATED TO MAINTAIN THE CALCULATED DIFFERENTIAL ONCE ENABLED THE PUMP SPEED SHALL BE MODULATED TO MAINTAIN THE CALCULATED DIFFERENTIAL PRESSURE (DP) SETPOINT. 2. SOFTWARE PRIMARY/STANDBY FUNCTION SHALL ALLOW EITHER OF THE HOT WATER PUMPS TO ACT AS SOFTWARE PRIMARY/STANDBY FUNCTION SHALL ALLOW EITHER OF THE HOT WATER PUMPS TO ACT AS THE PRIMARY PUMP. 3. THE REMOTE DP SETPOINT SHALL BE DETERMINED OPENING ALL HEATER CONTROL VALVES TO SYSTEM THE REMOTE DP SETPOINT SHALL BE DETERMINED OPENING ALL HEATER CONTROL VALVES TO SYSTEM AND MEASURING PRESSURE ON DP SENSOR. 4. VFD SHALL MODULATE TO MAINTAIN DP SETPOINT. VFD SHALL MODULATE DOWN TO ITS MINIMUM. VFD SHALL MODULATE TO MAINTAIN DP SETPOINT. VFD SHALL MODULATE DOWN TO ITS MINIMUM. ONCE VFD REACHES ITS MINIMUM(DETERMINED BY MOTOR MANUFACTURER DATA) AND DP STILL INCREASES THEN THE 3-WAY VALVE SHALL MODULATE TO BYPASS FLOW TO MAINTAIN DP SETPOINT. 5. ALARM ON PRIMARY PUMP FAILURE DETECTED VIA CURRENT SENSING SWITCH. UPON FAILURE OF THE ALARM ON PRIMARY PUMP FAILURE DETECTED VIA CURRENT SENSING SWITCH. UPON FAILURE OF THE PRIMARY PUMP, THE STANDBY PUMP SHALL START AUTOMATICALLY. THE BAS SHALL MAINTAIN A START COMMAND AT THE PRIMARY PUMP AND RESUME CONTROL WITH THE PRIMARY PUMP UPON CONFIRMATION THAT THE LEAD PUMP HAS RETURNED TO NORMAL OPERATION. THE STANDBY PUMP SHALL BE DISABLED ONCE THE PRIMARY PUMP RESTARTS. 6. LEAD PUMP DESIGNATION SHALL BE ROTATED WEEKLY (ADJ) IN ACCORDANCE WITH THE BAS LEAD PUMP DESIGNATION SHALL BE ROTATED WEEKLY (ADJ) IN ACCORDANCE WITH THE BAS SCHEDULE.

AutoCAD SHX Text 180 F°F

AutoCAD SHX Text 150 F°F

AutoCAD SHX Text 10 F°F

AutoCAD SHX Text 55 F°F

AutoCAD SHX Text HW Temp

AutoCAD SHX Text Outside Air Temp Air TempAir Temp TempTemp

AutoCAD SHX Text Hot Water Supply Temperature Reset Schedule Water Supply Temperature Reset ScheduleWater Supply Temperature Reset Schedule Supply Temperature Reset ScheduleSupply Temperature Reset Schedule Temperature Reset ScheduleTemperature Reset Schedule Reset ScheduleReset Schedule ScheduleSchedule

AutoCAD SHX Text CODED NOTES: 1. INSTALL NEW BOILER CIRCULATION PUMP. PUMP SHALL BE INSTALLED PER MANUFACTURER'S INSTALL NEW BOILER CIRCULATION PUMP. PUMP SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. INSTALL NEW 3" PIPING/PIPING ACCESSORIES TO CONNECT CIRCULATION PUMPS TO EXISTING HOT WATER SUPPLY AND RETURN PIPING. SEE BOILER PIPING SCHEMATIC THIS SHEET. SEE SCHEDULE SHEET 8. SEE DETAIL SHEET 7. 2. INSTALL NEW VFD FOR EXISTING PUMP MOTORS. SEE CONTROL SEQUENCE THIS SHEET. INSTALL NEW VFD FOR EXISTING PUMP MOTORS. SEE CONTROL SEQUENCE THIS SHEET. 3. INSTALL NEW 3" 3-WAY CONTROL VALVE (CV = 28.3) AND BYPASS PIPING. INSTALL NEW 3" 3-WAY CONTROL VALVE (CV = 28.3) AND BYPASS PIPING. 4. COORDINATE WITH COLUMBIA GAS TO CONFIGURE GAS METER TO SUPPLY BUILDING WITH 3515 CFH @ 2 PSIG COORDINATE WITH COLUMBIA GAS TO CONFIGURE GAS METER TO SUPPLY BUILDING WITH 3515 CFH @ 2 PSIG GAS. 5. PROVIDE NEW GAS REGULATOR TO PROVIDE 3000 CFH @ 14" W.C.TO BOILERS.PROVIDE NEW GAS REGULATOR TO PROVIDE 3000 CFH @ 14" W.C.TO BOILERS.

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

FACILITIES ENGINEERING OFFICE

AutoCAD SHX Text

BUILDING 308

AutoCAD SHX Text

INSTALLATION MANAGEMENT DIVISION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

FACILITY ENGINEER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DS-FCE (ENVIRONMENTAL)

AutoCAD SHX Text

DEPUTY FACILITY ENGINEER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DS-FCS (SECURITY)

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text DEFENSE LOGISTICS AGENCY DEFENSE SUPPLY CENTER COLUMBUS COLUMBUS, OHIO 43218-3990

AutoCAD SHX Text

SHEET REFERENCE NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DS-FCO (SAFETY)

AutoCAD SHX Text

MARK

AutoCAD SHX Text 1/4" = 1'

AutoCAD SHX Text 1-Jun-17

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4-569

AutoCAD SHX Text

NEW WORK MECHANICAL ROOM

AutoCAD SHX Text

CSC-16749

INLINE CENTRIFUGAL PUMP

H W S

H W R

H W S

H W S

H W S

H W R

H W S

EXHAUST DETAIL

N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

CHECK VALVE REQUIRED IF SYSTEM IS PRESSUREIZED BY OTHER SOURCES

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

UNION

AutoCAD SHX Text

CONCENTRIC REDUCER

AutoCAD SHX Text

MOTOR

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

CONCENTRIC REDUCER

AutoCAD SHX Text

UNION

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

GATE VALVE - N.C. (OPEN FOR PUMP SUCTION PRESSURE)

AutoCAD SHX Text IF PUMP SUCTION AND DISCHARGE FLANGES ARE TAPPED, USE THESE POINTS FOR PRESSURE GAGE CONNECTIONS

AutoCAD SHX Text

PRESSURE GAGE

AutoCAD SHX Text 1/4"

AutoCAD SHX Text

GATE VALVE - N.O. (CLOSE FOR PUMP SUCTION PRESSURE)

AutoCAD SHX Text

MANUAL CONTROL BALANCING VALVE

AutoCAD SHX Text DDC SYSTEM NOTES: DDC CONTROLLERS SHALL BE CONFIGURED FOR INDIVIDUAL TEMPERATURE SETPOINTS AND INDIVIDUAL TIME OF DAY SCHEDULING. FURNISH AND INSTALL DDC CONTROLLER AND ALL ASSOCIATED WIRING AND CONDUIT. SYSTEM FRONT END IS LOCATED IN BUILDING 17 ROOM 207. SEQUENCE OF OPERATIONS: THE UNIT SHALL RUN ACCORDING TO A USER DEFINABLE TIME SCHEDULE IN THE FOLLOWING MODES: OCCUPIED MODE: THE UNIT SHALL MAINTAIN A HEATING SETPOINT OF 60°F (ADJ.). MAIL ROOM AREA IN BUILDING 17-3 SHALL BE SET AT 68°F(ADJ.).UNOCCUPIED MODE (NIGHT SETBACK): THE UNIT SHALL MAINTAIN A HEATING SETPOINT OF 50°F (ADJ.). ALARMS SHALL BE PROVIDED AS FOLLOWS: LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER DEFINABLE AMOUNT (ADJ.). FAN: THE FAN SHALL RUN ANYTIME THE ZONE TEMPERATURE DROPS BELOW HEATING SETPOINT, UNLESS SHUTDOWN ON SAFETIES. HEATING COIL VALVE: THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND MODULATE THE HEATING COIL VALVE TO MAINTAIN ITS HEATING SETPOINT.

AutoCAD SHX Text

LOCAL TEMPERATURE SENSOR (TYP.)

AutoCAD SHX Text

UNIT HEATER

AutoCAD SHX Text

FAN CONTACT (TYP.)

AutoCAD SHX Text

CONTROL VALVE (TYP.)

AutoCAD SHX Text

UNIT CONTROLLER (TYP.)

AutoCAD SHX Text

INTELLIGENT FIELD PANEL

AutoCAD SHX Text

ETHERNET LINE FOR LAN ACCESS OR LOCAL WORKSTATION

AutoCAD SHX Text

HARD WIRED

AutoCAD SHX Text

COMMUNICATION LINE

AutoCAD SHX Text

DIRECT DIGITAL CONTROLLER(UNIT HEATERS)

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

UC

AutoCAD SHX Text

UC

AutoCAD SHX Text

UNIT HEATER

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text

TRANSFORMER (TYP.)

AutoCAD SHX Text

HOT WATER RETURN

AutoCAD SHX Text

HOT WATER UNIT HEATER WITH TWO-WAY

AutoCAD SHX Text

CONTROL VALVE PIPING DIAGRAM

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

MV

AutoCAD SHX Text

NO

AutoCAD SHX Text

HOSE END DRAIN CONNECTION (TYP)

AutoCAD SHX Text

SUSPENDED UNIT SHALL BE INSTALLED LEVEL

AutoCAD SHX Text

AIRFLOW

AutoCAD SHX Text PROVIDE MANUAL AIR VENT IF BRANCH CONNECTION IS MADE ABOVE HORIZONTAL, OR IF BRANCH PIPING MUST DROP DOWN AT ANY POINT ALONG HORIZONTIAL RUN.

AutoCAD SHX Text

AUTOMATIC BALANCING VALVE

AutoCAD SHX Text

KEEP WATER PIPING AS HIGH AS POSSIBLE

AutoCAD SHX Text

ISOLATION VALVE

AutoCAD SHX Text

Y-STRAINER

AutoCAD SHX Text C

AutoCAD SHX Text NOTES: 1. DISTANCES FROM ADJACENT WALKWAYS, ADJACENT BUILDINGS, OPERABLE WINDOWS AND OTHER DISTANCES FROM ADJACENT WALKWAYS, ADJACENT BUILDINGS, OPERABLE WINDOWS AND OTHER BUILDING OPENINGS, MUST BE CONSISTENT WITH THE NATIONAL FUEL GAS CODE, ANSI Z223.1/NFPA54. 2. ALL VENT PIPING SHOULD BE ADEQUATELY SUPPORTED FROM THE BUILDING STRUCTURE. ALL VENT PIPING SHOULD BE ADEQUATELY SUPPORTED FROM THE BUILDING STRUCTURE. 3. ALL CONNECTIONS SHALL BE PROPERLY SEALED AND SECURED ACCORDING TO THE VENT ALL CONNECTIONS SHALL BE PROPERLY SEALED AND SECURED ACCORDING TO THE VENT MANUFACTURER'S RECOMMENDATIONS.

AutoCAD SHX Text

BIRD SCREEN

AutoCAD SHX Text

4" HEAT TREATED ALUMINIZED TUBING

AutoCAD SHX Text CLEARANCE THIMBLE. FOLLOW THE REQUIREMENTS OF THE THIMBLE AND/OR CATEGORY III VENT PIPE MANUFACTURER

AutoCAD SHX Text

WALL

AutoCAD SHX Text

WALL

AutoCAD SHX Text

FLEXIBLE BOOT

AutoCAD SHX Text

VACUUM PUMP

AutoCAD SHX Text

BAND CLAMP

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

FACILITIES ENGINEERING OFFICE

AutoCAD SHX Text

BUILDING 308

AutoCAD SHX Text

INSTALLATION MANAGEMENT DIVISION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

FACILITY ENGINEER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DS-FCE (ENVIRONMENTAL)

AutoCAD SHX Text

DEPUTY FACILITY ENGINEER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DS-FCS (SECURITY)

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text DEFENSE LOGISTICS AGENCY DEFENSE SUPPLY CENTER COLUMBUS COLUMBUS, OHIO 43218-3990

AutoCAD SHX Text

SHEET REFERENCE NUMBER:

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DS-FCO (SAFETY)

AutoCAD SHX Text

MARK

AutoCAD SHX Text

NONE

AutoCAD SHX Text 1-Jun-17

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

KENT KLINGLER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4-569

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text

CSC-16749

HYDRONIC UNIT HEATER SCHEDULE

AutoCAD SHX Text

MARK

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

DELIVERY

AutoCAD SHX Text

CAPACITY @ 160°FEWT, EAT 60°F

AutoCAD SHX Text

MAX MOUNTING HEIGHT

AutoCAD SHX Text

THROW

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

HOT WATER

AutoCAD SHX Text

HORIZONTAL

AutoCAD SHX Text

120,000 BTU/HR

AutoCAD SHX Text 15'

AutoCAD SHX Text 46'

AutoCAD SHX Text 115V/1P/60Hz

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

HOT WATER

AutoCAD SHX Text

HORIZONTAL

AutoCAD SHX Text

190,000 BTU/HR

AutoCAD SHX Text 16'

AutoCAD SHX Text 46'

AutoCAD SHX Text 115V/1P/60Hz

AutoCAD SHX Text

INFRARED UNIT HEATER SCHEDULE

AutoCAD SHX Text

MARK

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CAPACITY

AutoCAD SHX Text

FUEL

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text

IH-1

AutoCAD SHX Text

INFRARED TUBE

AutoCAD SHX Text

100,000 BTU/HR

AutoCAD SHX Text

NATURAL GAS

AutoCAD SHX Text 115V/1P/60Hz

AutoCAD SHX Text

CONDENSING SYSTEM. DESIGN BASIS: ROBERTS GORDON CO-RAY-VAC MODEL CRV-B10

AutoCAD SHX Text

IH-2

AutoCAD SHX Text

INFRARED TUBE

AutoCAD SHX Text

115,000 BTU/HR

AutoCAD SHX Text

NATURAL GAS

AutoCAD SHX Text 115V/1P/60Hz

AutoCAD SHX Text

MODULATING HEATER. DESIGN BASIS: ROBERTS GORDON VANTAGE MODEL CTH3-115-30U

AutoCAD SHX Text

VACUUM PUMP SCHEDULE

AutoCAD SHX Text

MARK

AutoCAD SHX Text

FLOW UNITS

AutoCAD SHX Text

HP

AutoCAD SHX Text

RPM

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text

VP-1

AutoCAD SHX Text

AutoCAD SHX Text 115V 1P

AutoCAD SHX Text

AutoCAD SHX Text 115V/1P/60Hz

AutoCAD SHX Text

CONDENSING SYSTEM. DESIGN BASIS: ROBERTS GORDON CO-RAY-VAC MODEL EP-201

AutoCAD SHX Text

PUMP SCHEDULE

AutoCAD SHX Text

ID

AutoCAD SHX Text

FUNCTION

AutoCAD SHX Text

GPM

AutoCAD SHX Text

HEAD (FT.)

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

VOLTAGE

AutoCAD SHX Text

MOTOR HORSEPOWER

AutoCAD SHX Text

RPM

AutoCAD SHX Text

SUCTION SIZE

AutoCAD SHX Text

DISCHARGE SIZE

AutoCAD SHX Text

BP-1

AutoCAD SHX Text

BOILER CIRCULATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

IN-LINE

AutoCAD SHX Text

208V/3 PH

AutoCAD SHX Text .75

AutoCAD SHX Text

AutoCAD SHX Text

3 IN

AutoCAD SHX Text

3 IN

AutoCAD SHX Text

BP-2

AutoCAD SHX Text

BOILER CIRCULATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

IN-LINE

AutoCAD SHX Text

208V/3 PH

AutoCAD SHX Text .75

AutoCAD SHX Text

AutoCAD SHX Text

3 IN

AutoCAD SHX Text

3 IN

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR.

AutoCAD SHX Text

FACILITIES ENGINEERING OFFICE

AutoCAD SHX Text

BUILDING 308

AutoCAD SHX Text

INSTALLATION MANAGEMENT DIVISION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

FACILITY ENGINEER

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DS-FCE (ENVIRONMENTAL)

AutoCAD SHX Text

DEPUTY FACILITY ENGINEER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DS-FCS (SECURITY)

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text DEFENSE LOGISTICS AGENCY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .