AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO.
CSC 15303
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP4702 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP470217R0028
X
2017 JUL 26
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DCSO COLUMBUS
ATTN DCSO-C
PO BOX 3990
COLUMBUS OH 43218-3990
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
26 JULY 2017
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
Amendment 0001 has been issued to provide a response to all potential vendors for this solicitation. The below information would provide questions (Q) submitted by the contractors due to Site Visit. And answers (A) to those questions by the Government;
1Q. Where are the underground sanitary lines located so we know how much floor needs cut out.
1A. The main sanitary line is located on the south side of building 30 along the roadway. Secondary sanitary lines are located underneath the toilets in the restrooms. Digging inside the restrooms is required to tap into the secondary sanitary lines to install new cleanouts and floor drains. Sheet 9/28, note 6: Water line source runs above ground. Water lines run along wall from section 2 to section 3. Water lines are also located inside the chase wall between restrooms 303 and 304.
2Q Mechanical sheet?
2A. Disregard reference to Mechanical sheet.
3Q. No mention of where the fire sprinkler ties into.
3A. The contractor should read paragraph number 2 under "project requirements" on Pg. 28 Of 28 on drawing number 3-1612. The fire sprinkler are to tie into the existing main lines.
4Q. Where is the electrical tying into?
4A. All electrical circuits and panel designations are clearly depicted on the construction drawings. All new electrical panels that are to be installed are clearly identified as to where the incoming power is located along with breaker and wire size information in the coded notes.
5Q. The bid form has a line item to install concrete gutter along concrete pad for Chiller Pad . I could not find any notes or location on the drawings for gutters. Please verify and note location of details on drawings.
5A. The bid item under "Structural Concrete Pad for Chiller #CH-1", there is an item under "Erosion and Sediment Control". It is, "Installation of concrete gutter along concrete pad". Please disregard this item.
6Q. Bolting the bollards to floor slab.
6A. The reason for the 4 ft. bollard foundation is for security reasons. It is specified for employees who may get angry and purposely run forklifts into buildings.
7Q. Site Visit attendance sheet.
7A. Attached Site Visit attendance sheet.
8Q. Section B total contract amount missing.
8A. Attached revised Section B.
AMENDMENT 0001 MUST BE SIGNED AND RETURNED WITH YOUR PROPOSAL.
All other terms/conditions for this solicitation remains unchanged.
PAGE 2 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP470217R0028-0001
SECTION J - LIST OF ATTACHMENTS
List of Attachments
Description File Name ATTACH.Revised Section B.
Revised Section B.
ATTACH.Site Visit Attendance Sheet.
Site Visit Attendance Sheet
PAGE 3 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP470217R0028-0001
CONTINUATION SHEET SP4702-l 7-R-0028 13
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION OF WORK:
The contractor shall furnish all plant, labor, material, supplies, equipment, tools, delivery, disposal and supervision necessary to install several new office areas, renovation of a dock office, installation of two new shower rooms in the existing restrooms, and an addition of a waiting area next to one of the dock offices. In addition, includes the installation of two new bottle water coolers, and the installation of a picnic gazebo outside of the main entrance south of section 1 at building 30: All work shall be performed in strict accordance with the specifications for project CSC-15303 "Install New Offices Areas at Building 30" subject to the tenns and conditions of the solicitation.
TER!Vl OF CONTRACT:
The period ofperfonnance for this contract is days after issuance of the Notice to Proceed (NTP). This performance period is 120 days (negotiable).
UNIT TOTAL
ITEM NO. SUPPLIES/SERVICES QTY UNIT PRICE AMOUNT
0001 Z2EZ-V00007994 JB $ $
0002 YIAB-V00007902 JB $ $
0003 YIEZ-V00007922 JB $ $
TOTAL AMOUNT$
IMPORTANT ACQUISITION NOTES:
Note 1: The offeror shall complete the following columns on this page: Unit Price and Total Amount. All costs, including bonds (as required), overhead and profit shall be included under the Total Amount.
Note 2: The offeror shall accept any amendments generated from this solicitation and shall complete the Constmction Cost Estimate Fonn (Attaclunent 3) as part of its proposal submission to be considered complete. Incomplete proposal will not be considered technically acceptable.
Note 3: As stated in clause 52.236-7, there will be a site visit on July 18, 2017 at 1:30 PM local time. Attendance at this site visit is optional for any contractor wishing to submit an offer in response to this solicitation. Please see clause for details.
Note 4: Quantity and unit price (Section B) will be flipped at the award stage for invoicing pmposes.