CONSTRUCTION_COST_ESTIMATE_ATTACHMENT_3.pdf

PDF 158 KB Posted

Attached to
Project CSC 15303 "Install New Ofice Areas at Building 30"
Solicitation number
SP4702-17-R-0028
Issued by

About this file

Attachment 3

View the file

Other files

File Type Posted
SP470217R00280001.pdf PDF
DOL_Wages_Determination_Attachment_8.pdf PDF
ENG_FORM_4025_R__ATTACHMENT_6.pdf PDF
DSCC_Site_Visit_Map_Attachment_4.pdf PDF
SP4702-17-R-0028.pdf PDF
Real_ID_Act_Attachment_7.pdf PDF
Scope_of_Work_Attachment_1pdf.pdf PDF
ENG_FORM_93.pdf PDF
DRAWINGS_ATTACHMENT_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO. DATE:

PROJECT TITLE:

ARCHITECT/ENGINEER:

PRELIMINARY DESIGN X OTHER

NO. OF UNITS

UNIT OF

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 1 - OFFICE

ARCHITECTURAL/CIVIL COST

Paint Interior and Exterior Drywall, Roller, Primer and 2 finish coats

SF

Interior Door & Frame (Include all hardware and accessories)

EA

Dry wall including all framing and accessories, 2 Sides SF Rigid Insulation for Walls, Fiberglass, 1.5#/C.F., unfaced, 1" thick, R4.1

SF

Interior Vinyl Windows, 4'-0" W x 3'-0" H EA Interior Vinyl Window Blinds, 48"x36" EA Flooring including carpet, base cover and all accessories SY

1/8" Rubber Base, Group 2, 4" High LF Suspended Ceiling, including frame, and hangers, Ceiling tile to be 3/4", 1 hour fire rated SF

1/2" Gypsum Board Ceiling Finished and Painted SF

CONTRACTOR BID FORM

ITEM TOTAL COST

DRAWING NO.

INSTALL NEW OFFICE AREAS BUILDING 30

QUANTITY MATERIAL LABOR

3-1612

FINAL DESIGN

EQUIP COST

ESTIMATOR:

CSC-15303

ATTACHMENT # 3

MECHANICAL COST

Diffuser/Grill Balancing EA Air Handler Balancing EA Commisioning LS 20 ton chiller with free cooling EA Air Handling Unit (AHU-2) EA 6" Dia. Duct LF 8" Dia. Duct LF 10" Dia. Duct LF 12" Dia. Duct LF 14" Dia. Duct LF

NO. OF UNITS

UNIT OF

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

6" Flex Duct LF Duct Insulation SF Diffusers EA Return Grill EA Volume Damper EA 3/4" Pipe, Sch 40 LF 1" Pipe, Sch 40 LF 1-1/2" Pipe, Sch 40 LF 2" pipe, Sch 40 LF 2-1/2" pipe, Sch 40 LF 3/4" pipe, sch 80 LF Pipe Insulation LF steam traps ea Control Valve ea Ball Valve ea Thermometers ea Controls LS

ELECTRICAL COST

120/208V, 3P, 4W, 200A MCB, 42 CKT PANELBOARD EA

250A, 3P, 208V CIRCUIT BREAKER EA

80A, 3P, 480V CIRCUIT BREAKER EA

15A, 3P, 208V CIRCUIT BREAKER EA

20A, 1P, 120V CIRCUIT BREAKER EA

100A NON-FUSED DISCONNECT SWITCH EA

30A NON-FUSED DISCONNECT SWITCH EA

#3/0 THHN WIRE CLF

#3 THHN WIRE CLF

#12 THHN WIRE CLF

#6 GROUND WIRE CLF

#8 GROUND WIRE CLF

#12 MC CABLE CLF

TOTAL COSTITEM QUANTITY MATERIAL LABOR EQUIP COST

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

2" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

1-1/4" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

1-1/4" S40 CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

3/4" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

20A DUPLEX OUTLET (INCLUDES BOX & COVER

PLATE)

EA

4" SQUARE JUNCTION BOX EA

TYPE 'A' 2X4 LIGHT EA

TYPE 'A/EM' 2X4 EMERGENCY LIGHT EA

TYPE 'C' 1X4 LIGHT EA

LED EXIT SIGN EA

DUAL TECH OCCUPANCY SENSOR EA

LIFT RENTAL

FIRE ALARM/FIRE SUPPRESSION COST

FIRE ALARM ADDITIONS LOT

FIRE SUPPRESSION ADDITIONS LOT

SUBTOTAL

OH

PROFIT

BOND

ITEM QUANTITY MATERIAL LABOR EQUIP COST TOTAL COST

TOTAL SECTION 1 OFFICE

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

Structural Concrete Pad for Chiller # CH-1 General Requirements

Mobilization & demobilization of Equipment EA

Hauling of excavated common earth off DSCC, Incl. 30 miles R/T Dumptruck & dump fees

CY

Cast-In-Place Concrete Installation of forms to construct walls & footings SFCA

Installation of Reinforcements #4 rebars @ 12" c/c TON

Installation of concrete for slab pad , incl. compaction of concrete per spec requirements, 4,000 PSI Concrete for Concrete Pad

CY

Broom finishing for concrete pad area SY

Concrete Curing for Chiller Pad w/ water curing CSF

Excavation and Backfill

Excavation of common earth from West side of Bldg. 30 CY

Spread crushed stone ODOT ITEM 304 under slab base course, CY

ITEM QUANTITY MATERIAL LABOR EQUIP COST

TOTAL COST

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

under new concrete pad with dozer, no compaction

Compaction of backfill material under pad and around pad CY

Concrete Construction Joints

Saw cut contraction joint in green concrete incl. sealant fill LF

Installation of construction/expansion joint as shown on drawing

LF

Exterior Improvements Installation of Steel pipe bollards with concrete filled along

EA

concrte pad, 8'L X 4' D HOLE X 8" DIAM.

Erosion & Sedimentation Control

30" Silter fence with wood stakes as shown on drawings LF

Installation of concrete gutter along concrete pad LF

SUBTOTAL

OH

PROFIT

BOND

ITEM QUANTITY MATERIAL LABOR EQUIP COST TOTAL COST

TOTAL CONCRETE PAD FOR CHILLER #CH1

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 3 - BREAK ROOM & OFFICE

ARCHITECTURAL/CIVIL/STRUCTURAL

COST

Demo Existing Break Room and Office, Walls, Doors, Ceiling

CF

Sawcut Floor, Trench to 2-0", 6" ODOT 304 Gravel, 4000 psi Concrete Fill and 6" Floor LS

6"x6"x1/4"x10'-0" Tubular Steel Column LS Paint Tubular Steel Column, Roller, Primer and 2 finish coats

SF

Paint Interior and Exterior Drywall, Roller, Primer and 2 finish coats

SF

Interior Door & Frame (Include all hardware and accessories)

EA

Dry wall including all framing and accessories, 2 Sides SF Rigid Insulation for Walls, Fiberglass, 1.5#/C.F., unfaced, 1" thick, R4.1

SF

Interior Vinyl Windows EA Interior Vinyl Window Blinds, 48"x36" EA Flooring including carpet, base cover and all accessories SY

1/8" Rubber Base, Group 2, 4" High LF Suspended Ceiling, including frame, and hangers, ceiling tile to be 3/4" 1 hour fire rated

SF

Bollard, 4" Dia. Steel Tube, Concrete Filled, w/ Yellow Post Sleeve, Saw Cut and Foundation, 52" Height Ea. LF

QUANTITYITEM TOTAL COST

EQUIP COSTLABORMATERIAL

Diffuser/Grill Balancing EA Air Handler Balancing EA Commisioning LS Air Handling Unit (AHU-3) EA 6" Dia. Duct LF 8" Dia. Duct LF 10" Dia. Duct LF 12" Dia. Duct LF 14" Dia. Duct LF 16" Dia. Duct LF 8" Flex Duct LF Duct Insulation SF Diffusers EA Return Grill EA Volume Damper EA Control Valve EA Ball Valve EA Thermometers EA Controls LS

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

ELECTRICAL COST

120/208V, 3P, 4W, 200A MCB, 42 CKT PANELBOARD EA

250A, 3P, 208V CIRCUIT BREAKER EA

15A, 3P, 208V CIRCUIT BREAKER EA

20A, 1P, 208V CIRCUIT BREAKER EA

30A NON-FUSED DISCONNECT SWITCH EA

#3/0 THHN WIRE CLF

#12 THHN WIRE CLF

#6 GROUND WIRE CLF

#12 MC CABLE CLF

2" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

3/4" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

20A DUPLEX OUTLET (INCLUDES BOX & COVER

PLATE)

EA

4" SQUARE JUNCTION BOX EA

TYPE 'A' 2X4 LIGHT EA

TYPE 'A/EM' 2X4 EMERGENCY LIGHT EA

TYPE 'B' 2X2 LIGHT EA

LED EXIT SIGN EA

DUAL TECH OCCUPANCY SENSOR EA

LIFT RENTAL

FIRE ALARM/FIRE SUPPRESSION COST

FIRE ALARM ADDITIONS LOT

FIRE SUPPRESSION ADDITIONS LOT

SUBTOTAL

OH

PROFIT

BOND

LABOR EQUIP COST TOTAL COSTITEM QUANTITY MATERIAL

TOTAL SECTION 3 BREAK ROOM & OFFICE

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 3 - DOCK OFFICE REMODEL

ARCHITECTURAL/CIVIL COST

Demo North Exterior Door and Hardware EA Demo North Exterior Wood Frame EA Concrete Unit Masonsry, 8"x16"x8" thick units, tooled joint 1 side, 2000 psi non-reinforced

SF

Brick Veneer Masonry, Standard, sel. Common, 4"x2- 2/3"x8", running bond

SF

Paint Exterior Masonry Wall, 1 coat Primer, 2 coats Paint, Inc. Preparation

SF

Framing, Stud Wall, 10' high walls, 18 ga. x 2-12" wide, Studs 12" O.C.

LF

Gypsum Board, 5/8" Thick, Taped and Finished SF Paint Interior Drywall, Roller, Primer and 2 finish coats SF Flooring including carpet, base cover and all accessories SY

1/8" Rubber Base, Group 2, 4" High LF Suspended Ceiling, including frame, and hangers, ceiling tile to be 3/4", 1 hour fire rated SF

ITEM QUANTITY MATERIAL

TOTAL COST

LABOR EQUIP COST

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

ELECTRICAL COST

#12 THHN WIRE CLF

#12 MC CABLE CLF

3/4" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

20A DUPLEX OUTLET (INCLUDES BOX & COVER

PLATE)

EA

4" SQUARE JUNCTION BOX EA

TYPE 'A' 2X4 LIGHT EA

TYPE 'A/EM' 2X4 EMERGENCY LIGHT EA

LED EXIT SIGN EA

DUAL TECH OCCUPANCY SENSOR EA

LIFT RENTAL

FIRE ALARM/FIRE SUPPRESSION COST

FIRE SUPPRESSION ADDITIONS LOT

SUBTOTAL

OH

PROFIT

BOND

ITEM QUANTITY MATERIAL LABOR EQUIP COST TOTAL COST

TOTAL SECTION 4 OFFICE

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 4 - OFFICE

ARCHITECTURAL/CIVIL COST

Paint Interior and Exterior Drywall, Roller, Primer and 2 finish coats

SF

Interior Door & Frame (Include all hardware and accessories)

EA

Dry wall including all framing and accessories, 2 Sides SF Rigid Insulation for Walls, Fiberglass, 1.5#/C.F., unfaced, 1" thick, R4.1

SF

Interior Vinyl Windows EA Interior Vinyl Window Blinds, 48"x36" EA Flooring including carpet, base cover and all accessories SY

1/8" Rubber Base, Group 2, 4" High LF Suspended Ceiling, including frame, and hangers, ceiling tile to be 3/4", 1 hour fire rated

SF

Bollard, 4" Dia. Steel Tube, Concrete Filled, w/ Yellow Post Sleeve, Saw Cut and Foundation, 52" Height Ea. LF

MECHANICAL COST

Diffuser/Grill Balancing EA Air Handler Balancing EA Commisioning LS Air Handling Unit (AHU-4) EA 6" Dia. Duct LF 8" Dia. Duct LF 12" Dia. Duct LF 8" Flex Duct LF Duct Insulation SF Diffusers EA Return Grill EA Volume Damper EA Control Valve EA Ball Valve EA Thermometers EA Controls LS

ITEM QUANTITY MATERIAL LABOR EQUIP COST

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

ELECTRICAL COST

15A, 3P, 208V CIRCUIT BREAKER EA

30A NON-FUSED DISCONNECT SWITCH EA

#12 THHN WIRE CLF

#12 MC CABLE CLF

3/4" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

20A DUPLEX OUTLET (INCLUDES BOX & COVER

PLATE)

EA

4" SQUARE JUNCTION BOX EA

TYPE 'A' 2X4 LIGHT EA

TYPE 'A/EM' 2X4 EMERGENCY LIGHT EA

LED EXIT SIGN EA

DUAL TECH OCCUPANCY SENSOR EA

LIFT RENTAL

FIRE ALARM/FIRE SUPPRESSION COST

FIRE ALARM ADDITIONS LOT

FIRE SUPPRESSION ADDITIONS LOT

SUBTOTAL

OH

PROFIT

BOND

LABOR EQUIP COST TOTAL COSTITEM QUANTITY MATERIAL

TOTAL SECTION 4 OFFICE

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 8 - WAITING AREA

ARCHITECTURAL/CIVIL COST

Paint Interior and Exterior Drywall, Roller, Primer and 2 finish coats

SF

Interior Door & Frame (Include all hardware and accessories)

EA

Dry wall including all framing and accessories, 2 Sides SF Rigid Insulation for Walls, Fiberglass, 1.5#/C.F., unfaced, 1" thick, R4.1

SF

Interior Vinyl Windows EA Interior Vinyl Window Blinds, 48"x36" EA Flooring including carpet, base cover and all accessories SY

1/8" Rubber Base, Group 2, 4" High LF Suspended Ceiling, including frame, and hangers, ceiling tile to be 3/4", 1 hour fire rated

SF

Bollard, 4" Dia. Steel Tube, Concrete Filled, w/ Yellow Post Sleeve, Saw Cut and Foundation, 52" Height Ea. LF

TOTAL COSTITEM QUANTITY MATERIAL LABOR EQUIP COST

Thru the Wall A/C Unit EA

ELECTRICAL COST

#12 THHN WIRE CLF

#12 MC CABLE CLF

3/4" EMT CONDUIT (INCLUDES ALL BENDS,

COUPLINGS, TERMINATIONS, ETC…)

LF

20A DUPLEX OUTLET (INCLUDES BOX & COVER

PLATE)

EA

TYPE 'A' 2X4 LIGHT EA

DUAL TECH OCCUPANCY SENSOR EA

LIFT RENTAL

FIRE ALARM/FIRE SUPPRESSION COST

FIRE SUPPRESSION ADDITIONS LOT

SUBTOTAL

OH

PROFIT

BOND

TOTAL SECTION 8 WAITING AREA

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 1 - COIL REPLACEMENT

MECHANICAL COST

Cooling Coil ahu-1 EA demo condensing unit LS demo cooling coil LS Control Valve EA Thermometers EA Controls LS

SUBTOTAL

OH

PROFIT

BOND

TOTAL

NO. OF UNITS

UNIT OF

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 1 - RESTROOM

ARCHITECTURAL/CIVIL COST

Demo Up to 4" x 70" x 1-1/4" Pilasters, Solid Plastic EA Up to 10" x 70" x 1-1/4" Pilasters, Solid Plastic EA

SUBTOTAL

OH

PROFIT

BOND

TOTAL COSTITEM QUANTITY MATERIAL

TOTAL COSTITEM QUANTITY MATERIAL LABOR EQUIP COST

TOTAL SECTION 1 RESTROOM

TOTAL SECTION 1 COIL REPLACEMENT

LABOR EQUIP COST

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 3 - RESTROOM

ARCHITECTURAL/CIVIL COST

Metal Support Lintel or Shelf Angle, Installation LF Framing, Stud Wall, 9' to 10' high walls, 18 ga. x 2-12" wide, Studs 12" O.C.

LF

Framing, Stud Wall, 9' to 10' high walls, 18 ga. x 3-5/8" wide, Studs 12" O.C.

LF

5/8" Gysum Board for Walls, Water Resistant, Taped and finished, with Compound Skin Coat (level 5 finish) SF

Sawcut Mesh Reinforced Concrete Slab up to 4" Per Pass LF

Sanitary Pipe Connection, 3" Cast Iron Lump 2"x2" Ceramic Tile Floors, Including Grout SF 6"x6" Ceramic Tile Walls SF Marble Threshold, 4" Wide, 36" Length, 5/8" Thick, White

EA

Robe Hook, Double EA Shelf, Stainless Steel, 5" Wide, 24" Long EA Soap Dish, Stainless Steel EA Curtain Rod, Stainless Steel EA Vinyl Curtain EA Folding Shower Seat, Stainless Steel EA Shower Heads, Installation EA Flloor Drain, Installation EA Metal Threshold, 36" Length LF Demo Suspended Ceiling, including frame, and hangers SF

5/8" Gypsum Board for Ceiling, Water Resistand, Taped and finished, with Compound Skin Coat (level 5 finish) 63 SF 3.13 197.19 0.021 1.323 65 86

$283.19

ITEM QUANTITY MATERIAL LABOR EQUIP COST

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

MECHANICAL COST

demo ductwork LS Diffuser/Grill Balancing EA Fan Balancing EA Exhaust Fan EA 8" Dia. Duct LF Rectangular Duct lbs Exhaust Grill EA Volume Damper EA

SUBTOTAL

OH

PROFIT

BOND

ITEM QUANTITY MATERIAL LABOR EQUIP COST TOTAL COST

TOTAL SECTION 3 RESTROOM

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

SECTION 8 - RESTROOM

ARCHITECTURAL/CIVIL COST

Metal Support Lintel or Shelf Angle, Installation LF

SUBTOTAL

OH

PROFIT

BOND

TOTAL COSTITEM QUANTITY MATERIAL LABOR EQUIP COST

TOTAL SECTION 8 RESTROOM

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

OCTAGON GAZEBO

14' Vinyl Octagon Gazebo EA Shipping LUMP Installation LUMP

CONCRETE PADS

Hauling LCY Mobilization for Backhoe EA Structural Excavation for Minor Structure, Common Earth, Hydraulic Backhoe, 1.2 CY Bucket

CY

Granular Base, ODOT #304, 6" for Concrete Pads SF Forms in Place, Slab on Grade, Edge Forms, Wood, On Grade 6" High

LF

Normal Weight Concrete, Ready Mix, High Early Strength, 4,000 PSI

CY

Concrete Placement, 6" Thick, Direct Chute - Pads CY Welded Wire Fabric for Pads 6 X 6 - W1.4 X W1.4 CSF Aluminum Edging LF 2"-8" River Cobbles TON

SUBTOTAL

OH

PROFIT

BOND

ITEM QUANTITY MATERIAL LABOR EQUIP COST

TOTAL COST

TOTAL OCTAGON GAZEBO

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

BOTTLE FILLING STATIONS

Bottle Filling Station w/ Bi-Level ADA Water Cooler EA

SUBTOTAL

OH

PROFIT

BOND

TOTAL PROJECT COST

TOTAL COSTITEM QUANTITY MATERIAL LABOR EQUIP COST

TOTAL BOTTLE FILLING STATIONS

TOTAL PROJECT COST