SP4702-20-R-0031 Solicitation.pdf

PDF 8 MB Posted

Attached to
Installation of Infared Heaters Bldg 43 Defense Supply Center Columbus
Solicitation number
SP4702-20-R-0031
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

CODE 8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

SP4702-20-R-0031

DLA CONTRACTING SERVICES OFFICE, COLUMBUS

ATTN: DCSO-C

P. O. Box 3990

Columbus, OH 43218-3990

SEE TABLE OF CONTENTS PAGE 3 0F 291

DEFENSE SUPPLY CENTER, COLUMBUS

ATTN: DCSO-C

P. O. Box 3990

Columbus, OH 43218-3990

For Courier Services, offers must be address to:

3990 East Broad Street, Columbus, OH 43213-1152.

5. REQUISITION/PURCHASE REQUEST NUMBER

84913487

SP4702

a. NAME

Kristin Schoeck

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

614-692-0489

6. PROJECT NUMBER

CSC-20046

1 29107/15/2020 local time 08/15/2020

1:00 PM

(See Clause (FAR 52.211-10

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

TABLE OF CONTENTS

SECTION A. . . . . . . . . . Solicitation/Table of Contents – STANDARD FORM 1442

SECTION B. . . .. . . .. . . Supplies or Services and Prices/Costs

SECTION C. . . . . . . . . . Descriptions/Specifications/Performance Work Statement

SECTION D. . . . . . . . . . Packaging and Marking (Not Applicable). . . . . . . . . . . . . . . . . . . . . . . . N/A

SECTION E. . . . . . . . . . Inspection and Acceptance

SECTION F. . . . . . . . . . Deliveries or Performance

SECTION G. . . . . . . . . Contract Administration Data (Not Applicable). . . . . . . . . . . . . . . . . . . . N/A

SECTION H. . . . . . . . . Special Contract Requirements

SECTION I. . . . . . . . . . Contract Clauses

SECTION J. . . . . . . . . . List of Documents, Exhibits, and Other Attachments

SECTION K. . . . . . . . . Representations, Certifications, and Other Statements of Offerors. . . 268

SECTION L. . . . . . . . . . Instructions, Conditions and Notices to Offerors

Attachment 1

Attachment 2

Attachment 3

Attachment 4

DOL Wage Rate Determination

Eng. Form 93

Eng. Form 4025-R

Construction Estimate/Bid Form

Section J: List of Attachments

SECTION M. . . . . . . . . . Evaluation Factors for Award

DESCRIPTION OF SERVICES

The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-20046 Infared Heaters Building 43) , contract drawing No. 4-578 (6 sheets), complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.

TERM OF CONTRACT

The period of performance for this project is 90 calendar days after the issuance of the Notice to

Proceed.

OFFER FOR SERVICES

CONRACT

LINE TEM

NO.(CLIN)

SUPPLIES/SERVICES QUANTITY UNIT TOTAL AMOUNT

0001 CSC-20046 Infared Heaters Building 43 FY20

1 JOB $

ALL CLIN PRICING SHALL BE INCLUSIVE OF OVERHEAD, PROFIT AND BONDING

COSTS

When invoicing in Wide Area Work Flow, reverse the quantity and unit price as shown above on each CLIN. Failure to do so will result in a delay in payment of the invoice as the invoice will have to be rejected and resubmitted. If you have any questions regarding this matter, contact your

WAWF representative Matt Foreman at 614-692-1050 or matthew.foreman@dla.mil.

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

The text of any referenced FAR, DFARS, or DLAD clause/provision may be obtained electronically at http://farsite.hill.af.mil (DLA Procurement Regulations). The complete edition of Federal Acquisition Regulations (FAR) or DoD FAR Supplement (DFARS) may be obtained by purchase from the Superintendent of Documents, Government Printing Office, Washington, DC 20402.

The clauses/provisions incorporated by reference have the same force and effect as if they were in full text; however, those having no bearing on the instant acquisition become self-deleting.

MAGNITUDE OF THIS CONSTRUCTION PROJECT IN TERMS OF ESTIMATED COST:

( ) This Project is estimated less than $25,000.

( ) This Project is estimated between $25,000 and $100,000.

(X) This Project is estimated between $100,000 and $250,000 .

( ) This Project is estimated between $250,000 and $500,000 .

( ) This Project is estimated between $500,000 and $1,000,000 .

( ) This Project is estimated between $1,000,000 and $5,000,000 .

( ) This Project is estimated between $5,000,000 and $10,000,000.

( ) More than $10,000,000.

DESCRIPTION OF WORK:

The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-20046 Infared Heaters Building 43) , contract drawing No. 4-578 (6 sheets) complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.

NOTE: While the Government currently intends to purchase the requirements sought in this solicitation, it may nevertheless be canceled in the event of spending cutbacks necessitated by passage of the Balanced Budget and Emergency Deficit Control Act of 1985, P.L.99-177.

NOTICE: Any contract awarded to a contractor who, at the time of award was suspended, debarred, and ineligible for receipt of contracts with government agencies or in receipt of a notice of proposed debarment from any government agency, is voidable at the option of the Government.

(The following is applicable when marked with an "X".)

(X) Wage Rate Decision OH180002 06/09/2020

Common Access Card (CAC) Procedures

Performance under this contract may require the contractor to obtain a Common Access Card (CAC). If CACs are issued under this contract, the contractor shall complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to control and account for contractor CACs at all times. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.

1. The contractor has each contractor employee requiring a CAC complete and sign Sections I and II of the DD Form 1172-2. The instructions for completing the DD Form 1172-2 are located at http://www.cac.mil/docs/1172-2-Instructions.pdf.

o For Section II, Block 22 - If the contractor employee signs and the DD Form 1172-2 it is then forwarded by the contractor. This provides verification for the employee information. If the contractor is submitting a DD Form 1172-2 for him/herself (e.g., the owner), with no higher authority above them for verification, then the signature in Block 22 must be notarized to verify identity.

2. The contractor forwards the DD Form(s) 1172-2 via hand-carry, secure mail, or encrypted email to (NOTE: The contractor may forward these forms individually or as a group):

O The Contracting Officer’s Representative (COR) for the contract, if a COR was designated.

O The Contracting Officer (CO) for the contract, if no COR was designated.

3. Each contractor employee must verify his/her account information upon receipt of an email from the Government containing a username and password for the Trusted Associate Sponsorship System (TASS). The web link for TASS is included in the email.

4. Each contractor employee will receive an email via TASS when his/her account has been approved. The email will notify the employee to obtain a Government-issued CAC from the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The email will also provide a link that identifies the locations of RAPIDS offices.

5. Each contractor employee shall obtain his/her issued CAC from the RAPIDS office.

6. The contractor, within one (1) business day of issuance, provides written notice via email to the COR (or the CO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date of expiration of the CAC. This notification may be made individually for each contractor employee or together for a group of contractor employees.

7. The contractor establishes procedures to control and account for Government-issued contractor CACs at all times, to include the following:

O Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.

O Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government.

O Ensure contractor employees do not abuse or place holes in their CACs.

O Ensure contractor employees do not display their CACs in public.

8. If a contractor CAC is lost or stolen:

o The contractor employee shall immediately notify the contractor that the contractor CAC has been lost or stolen.

o The contractor shall immediately notify the COR (or the CO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor CAC, as follows:

• In person, followed within one (1) business day by a written notice via email, or

• In writing, via email, or

• By telephone, followed within one (1) business day by a written notice via email.

o The contractor shall report the lost or stolen CAC card to the local DLA

Police/host installation police, who will provide the contractor a police report. If there is no local DLA Police/host installation police, or no police report is provided, the contractor shall provide information to the COR/CO, as applicable, detailing the circumstances of how the CAC was lost or stolen. The COR/CO will provide a memorandum for the contractor employee to support issuance of new CAC.

o The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.

9. If the expiration date for a contractor CAC is prior to completion of the contract and the contractor employee is to continue working under the contract and still requires a CAC, the contractor:

o Notifies the COR as follows:

• In person, followed within one (1) business day by a written notice via email, or

• In writing, via email, or

• By telephone, followed within one (1) business day by a written notice via email o No less than two (2) weeks prior to the current CAC’s expiration date, completes and complies with the steps above beginning with Step 2 for issuance of a new contractor CAC for the employee.

o Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC.

o Notifies the COR once a new CAC has been issued.

10. The contractor/contractor employee turns in any found CACs immediately, via handcarry, to the nearest Federal law enforcement office.

11. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:

o Contract completion or termination o Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC)

12. The contractor:

o For contract completion or termination – within one (1) business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods:

i. If the COR/CO is co-located or near enough that in-person transfer of CACs can be arranged, the contractor:

• Arranges to meet the COR (or the CO, if no COR was designated) to turn-in the collected contractor CAC(s).

• Hand-carries all collected contractor CACs for turn-in to meet the

COR (or the CO, if no COR was designated).

• Completes and signs the Government-Issued Contractor CAC

Turn-In Receipt with the COR (or the CO, if no COR was designated). The contractor is provided a copy of the receipt.

ii. If in-person transfer of CAC cannot be arranged, the contractor:

• Sends, via certified mail, the CACs to the COR/CO. The contractor includes in the package the Government-Issued Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.

• Notifies COR/CO that CACs have been sent via certified mail.

• Receives a completed copy of the receipt from the COR/CO once the COR/CO has received the CACs.

o For termination/reassignment of an employee:

i. Immediately notifies the COR (or the CO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:

• In person, followed within one (1) business day by a written notice via email, or

• In writing, via email, or

• By telephone, followed within one (1) business day by a written notice via email.

ii. Follows the turn-in procedures above for contract completion or termination, as applicable.

Contractor Reporting Requirements: The contractor is required to submit, on a monthly basis, to the COR (or the CO, if no COR was designated) a report of all employees working on the contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC. The report must note where changes have occurred (additions or deletions) since the previous month. Contractor employees who already have a CAC related to another DLA or DoD contract must be included in the monthly report. Contractor shall note the issuing organization and the CAC expiration date. Contractor is still responsible for notifying the COR/CO when the individual is no longer working under the subject contract.

The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations. Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:

• Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue

• Disapproval of invoices and delay of payment

• Withholding of final payment (in accordance with FAR 52.204-9)

• Documentation of CAC Non-Compliance in the Contractor Performance Assessment

Reporting System (CPARS)

DS-FCI ENGINEERING PROJECT DATA SHEET

PROJECT CSC #: CSC-20046 Install Infrared Heaters, Bldg. 43

PROJECT NAME: Install Infrared Heaters, Bldg. 43

PROJECT LOCATION(S): Building 43

CUSTOMER: DSCC

PROJECT TYPE: Maintenance & Repair

CURRENT SITUATION:

Building 43 is a 29,884 sq. ft. vehicle maintenance building that is heated by a combination of infrared tube heaters and direct fired make up air units. The west annex make up unit is not configured correctly thus making it difficult to keep space temperature at set point.

REGULATORY REQUIREMENTS:

UFC 3-410-01 Heating, Ventilating, And Air Conditioning Systems states for conditioned heating in areas of high to moderate physical activity space temperature shall be 55°F dry bulb.

IMPACT IF NOT PROVIDED:

If this project is not executed the west annex of the building space temperature will not be able to maintain the requirements of 55°F dry bulb. Workers will be cold and this will cause decreased productivity.

SCOPE OF WORK:

1. Install new infrared tube condensing heating system. System shall have (4) burners sized at 100 mbh each. Provide gas regulator to provide a minimum of 100 cfh natural gas at

14" wg to each unit

2. Reconfigure operation of existing make up air unit (duo-aire model# aa5). Unit shall turn on when existing exhaust fans in room 126 turn on to provide make up air.

3. Reconfigure duct work for MAU into space.

Bldg 48

VENT

VENT

PUBLIC SAFETY FACILITY

RESPONSE

APPROACH

XX

XX

XX

XX

XX

XX

XX XX

XXX

XXX

XX

XX

XX

XX

XX

XX

XX

XXX

XXX

C

EA

.A N

TH

O

N Y.

E.

D ig ita lly s ig ne d by

C

EA

.A N

TH

O

N Y.

E.

D at e:

0.

.2

:1

4:

-0

4'

5/

/2

5/

/2

5/

/2

CSC-20046

INSTALL INFRARED HEATERS, BUILDING 43

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 33 00 SUBMITTAL PROCEDURES

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 31 SAFETY SECURITY AND FIRE PROVISIONS

01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION

01 50 30 GENERAL SOW

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 11 25 FACILITY GAS PIPING

23 54 16.00 HEATING SYSTEM; GAS FIRED HEATERS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

-- End of Project Table of Contents --

SECTION 01 35 31

SECURITY, SAFETY AND FIRE PROVISIONS

(Rev 09/24/2014)

The following provisions are general in nature and tailored to the Defense Supply Center Columbus Installation. They cover items regarding access, as well as requirements to maintain a safe and secure environment for all individuals on the Installation. Not all of these provisions will apply to every solicitation or contract. Any questions regarding the applicability of the following provisions should be directed to the Contracting Officer or designee.

Any Government publications referenced herein will be provided upon request.

1.0 SECURITY

1.0.1 All contractors must abide by all security/force protection policies in effect on the DSCC Installation. Security/force protection procedures on the installation may include, but are not limited to, personnel screening, installation access and ID procedures, vehicle search requirements, restricted area access, and parking restrictions.

Contractors must be aware that security/force protection procedures may change due to changes in the local Force Protection Condition level.

1.0.2 Contractor personnel working on the Defense Supply Center Columbus installation will be subject to screening as dictated by current security regulations. Contractor personnel shall provide information requested to accomplish the required screening process. Levels of screening will be dictated by the sensitivity of the position the contractor will occupy and the access they require to DSCC and its facilities.

1.0.3 The contracting officer will coordinate with Security and

Emergency Services personnel prior to the start of the contract performance to ensure all required security/force protection security measures are in place. The contracting officer will coordinate with Security and Emergency Services personnel at the end of the contract to ensure all government issued IDs have been accounted for.

1.1 IDENTIFICATION (ID) CARD/BADGE

1.1.1 All contractors (including subcontractors) working On-Center must be issued a Contractor Badge by the DSCC Installation Pass & ID Office located at the DSCC Main Entrance, 401 N. Yearling Road, Whitehall, OH 43213 prior to starting work on the DSCC installation in accordance with DSCCI 5720.003 Installation Entry/Access. The type of credential required is divided into four areas as described below. Access of Foreign national contractor employees is strongly discouraged. Any request for foreign national access must be submitted to the Chief of Security and Emergency Services for approval one week in advance and approved on a case-by-case basis. If approved foreign nationals are only eligible for a Tier 1 or 2 ID.

1.1.2 Contractors conducting temporary business may obtain a Tier 1, Disposable Visitor Badge for up to 30 days. The contractor must be entered into the Visitor Notification System (VNS) by an authorized sponsor. Renewals of Tier 1 visitor badges in order to circumvent the requirement to receive a contractor ID for work longer than 30 days will not be tolerated.

1.1.3 Outside contractors working on the installation must be issued a

Tier 2, Local Access Badge (Outside Contractor) prior to starting work.

The Outside Contractor Badge (Red Stripe on top of card) has no building access programmed into the card. This card is not recognized by building lobby officers for entrance and is for contractors who solely work outside. Contractors with this badge must be escorted at all times when inside a building. The DSCC outside contractor ID may be obtained by the appropriate Verifying Official initiating a DSCC Form 2310, DSCC Tier 2 (Inside Contractor) ID Card and Key Card Request and forwarding it to their respective Personnel Security Office located at DSCC. This badge does not authorize the holder to sponsor visitors on to DSCC.

1.1.4 Contractors who require building access for more than thirty days but not DoD networks access must be issued a Tier 3, Local Access Badge (Inside Contractor) prior to starting work. The badge has a blue stripe on the top and can be programmed to operate any electronic access control devices needed. This badge is only authorized access to buildings which have been programmed on to it. Contractors with this badge must be escorted at all times when inside a building which they are not assigned. The Tier 3, Local Access Badge (Inside Contractor) may be obtained by the appropriate Verifying Official initiating a DSCC Form 2310, DSCC Tier 3 (Inside Contractor) ID Card and Key Card Request and forwarding it to their respective Personnel Security Office located at DSCC. This badge does not authorize the holder to sponsor visitors on to DSCC.

1.1.5 Contractors who require access to the Center’s information technology network in the course of the contract must be issued a DoD CAC and a Contractor Key Card prior to starting work on DSCC. The CAC can be obtained by the appropriate Trusted Agent placing the contractor employee into the Trusted Associate Sponsor System (TASS). The Contractor Key Card may be obtained by the appropriate Trusted Agent initiating a DSCC Form 2310, DSCC Tier 3 (Inside Contractor) ID Card and Key Card Request and forwarding it to their respective Personnel Security Office located at DSCC. Inside contractors that possess a CAC may sponsor visitors onto DSCC

1.1.6 Working with the applicant, the Trusted Agent or Verifying

Official will schedule an appointment within thirty days of badge approval at the Pass and ID office using the ID scheduler website:

https://centerwide.dscc.dla.mil/badgescheduler/Intro1.aspx. The Pass and ID office is located in Bldg. 52. Normal Hours of Operation: Monday through Friday, 0630-1530 hours. Once an appointment is made the Trusted Agent or Verifying Official will sponsor the applicant as a visitor in the Visitor Notification System, if necessary.

1.1.7 The Tier 3, Local Access Badge (Inside Contractor) ID and

Contractor Key Card is activated with basic access permissions, for example lobbies, cafeteria at Buildings 20 and 21. There is a block located in Section 3 of the DSCC Form 2310 in which the Verifying

Official will enter specific locations that utilize card readers that the applicant must gain access to. The Verifying Official will indicate the location by building number for exterior doors. Interior door access of any building must be listed separately. If 24/7 access is required, sufficient justification must be included.

1.1.8 Badges may be renewed beginning 90 days prior to expiration. The renewal process is the same as for the initial ID and key card. TA’s and AO’s will re-verify CAC, Outside Contractor or key card requirements and complete the necessary steps as outlined above.

Contractors must turn in all previously issued ID and key cards before receiving a new one. ID and key card renewal requests may be submitted up to 90 days before the card expiration date. It is the cardholder’s responsibility to advise their Verifying Official 90 days before the card expiration date that their ID will expire. This is to ensure that there is ample time for a new badge request to be processed and an appointment made at Pass and ID for badge issuance.

1.1.9 Contractor employees, including those of subcontractors, are required to wear the ID card/badge issued by the DSCC Installation Pass/ID Office conspicuously on their outer clothing at all times while working on this Center. Contractor personnel/subcontractors are subject to challenge and removal from the work area if the ID card is not being worn. It is the Contractor's responsibility to enforce this requirement. Failure to do so is just cause for terminating this contract for default.

1.1.10 It is the Contractor's responsibility to assure ID Cards issued to employees, including subcontractors, are turned in to the Pass/ID Office by each individual employee when the employees work on this project is completed. All ID cards/badges that have been issued during the life of this contract must be/have been returned to the Pass/ID Office to out process at the completion of the project. The Contracting Officer will verify with the Pass/ID Office that all items have been returned prior to authorizing final payment on the contract.

1.1.11 Under no circumstance will a Contractor or any contractor employees or subcontractors use or transfer their ID card/badge to allow anyone else access to any area on Center. Failure to comply with the requirements of this section is a security violation, which could result in subsequent administrative action, including requiring the contractor to permanently remove from the project the employee committing the violation, and/or termination of the contract for default.

1.3 VEHICLE OPERATION

1.3.1 Driving on Center

Contractor shall obey all speed limits and traffic signs. Speed limit on Center is 25 MPH unless otherwise posted. Radar is used on Center.

Disobeying traffic regulations may include a monetary fine, court appearance, or loss of driving privileges.

1.3.2 Parking

Contractor vehicles will be parked only in lots or areas designated by the Contracting Officer or designee. These areas will be discussed at the post award conference. The Contracting Officer or designee shall also determine if it is necessary for such vehicles to be in other than designated locations, and then make necessary arrangements for additional parking. Vehicles left on Center overnight must be coordinated with the Contracting Officer or designee. Any vehicle left unattended on Center that contains working materials, tools, and personal items of value must be locked at all times. The Government will not be liable for any lost, stolen or damaged vehicles or items.

1.3.3 Use of Alcohol and Illegal Drugs

The use of illegal drugs is prohibited on Federal property. Violators will be prosecuted.

1.3.4 Weapons on Center

No weapon, either on one’s person or placed inside a privately-owned vehicle is allowed. If a weapon of any type is found, it will be confiscated and held as evidence. Having unauthorized weapons on Federal property is a felony, and violators will be prosecuted.

1.4 ACCIDENTS/THEFTS/DAMAGE TO GOVERNMENT OR PRIVATE PROPERTY

If any of these incidents occur, the Contractor shall notify the Contracting Officer or designee and a Police Report will be initiated.

1.5 MATERIAL, DELIVERY AND RELEASE

1.5.1 All commercial vehicles will enter and exit the Center through the James Road Gate access control point (ACP). Commercial vehicles include, but are not limited to, semi-trucks, box trucks, passenger busses, cargo vans, dump trucks and walk-in vans. All such vehicles entering the gate will be processed through an entrance security inspection point before continuing onto Center. Hours of operation are from 0530-1730 M-F, excluding holidays. The names of Contractor personnel responsible for the receipt of Contractor's material and equipment delivered to this Center and telephone numbers or location where they can be reached shall be made available to the Contracting Officer or designee who will ensure the delivery is entered into the Visitor Notification System (VNS). All receipts and shipments shall be handled through the James Road Gate. It is the responsibility of the Contractor to provide the personnel and equipment required to unload incoming materials, tools and equipment. Personal deliveries to DSCC Associates, tenant activities or contractors, i.e. pizza, flowers, are not authorized. Foreign national delivery truck operators must be processed in accordance with the same procedure as outlined in paragraph 1.1.1. Contract Officials will ensure that all vendors are provided ample notice of the requirements and restrictions in this enclosure to minimize conflicts when commercial vehicles or vendors arrive on Center. They will also ensure all contracts comply with the stipulations outlined in policy guidance. If procedural requirements have not been met then the driver will not gain access and be turned away

1.5.2 All deliveries, except perishable items, fuel, warehouse deliveries, construction materials, or items too large to be x-rayed will be sent directly to the Central Receiving Facility (CRF). Items will be screened and delivered by the government. Any items being shipped from a building on site must be picked up from the CRF.

1.5.3 Properly marked Contractor vehicles will be allowed to carry tools and equipment normally carried in or on the vehicle. All vehicles are subject to security inspection at any time to determine if materials and tools being used or carried are authorized. Loading of materials onto the vehicles is the responsibility of the Contractor.

1.6 SECURING EQUIPMENT, TOOLS AND SUPPLIES

Contractors are responsible for securing their own equipment, tools, supplies, etc., that are brought to the job site. Lost or stolen equipment will be immediately reported to the DSCC Installation Police Department (692-2111). Under no circumstances will vehicles or construction equipment be left unattended with keys inside. If a vehicle is found unattended with keys in it, the keys will be confiscated by DSCC Installation Police.

1.7 REMOVAL OF CONTRACTOR PROPERTY

The Contractor shall be responsible for removing temporary buildings

(e.g. storage shed’s, trailers, shops, and office space), rubbish, tools, scaffolding, equipment and materials that are not the property of the Government at the completion of the project. The Contracting Officer or designee will not accept the project as completed until all Contractors property is removed. If the contractor is inadvertently paid prior to the removal of all of its buildings, rubbish, tools, scaffolding, equipment and materials that are not the property of the Government, the Contractor will be liable to the Government for the cost to the Government related to removing the Contractor’s property.

EXCEPTIONS: A written request may be submitted to the Contracting Officer for additional time to remove the temporary buildings and equipment. This exception applies only if the Contracting Officer provides written approval of the Contractor’s request for additional time to remove the temporary buildings and equipment. If the Contractor fails to remove the property in the additional time approved in writing, the Contractor will be liable to the Government for any cost to the Government related to removing the Contractor’s buildings, equipment and materials that are not the property of the Government.

With the written consent of the Contracting Officer, buildings may be abandoned and need not be removed.

2.1 SAFETY

The Defense Supply Center, Columbus is proud to be an Occupational

Safety and Health Administration (OSHA) Voluntary Protection Program (VPP) star site. Contractors shall comply with all Department of Labor and OSHA Rules and Regulations, 29CFR 1910 (General Industries) or 1926 (Construction), whichever is applicable. Contractors shall follow the safety requirements of EM 385-1-1, appropriate safety standards established by National Electric Code, National Fire Code, the State of Ohio, DLA or other safety requirements as established. The safety provisions listed below are only general in nature and are not intended to be all inclusive. The DSCC Installation Environmental, Safety and Occupational Health Office can be reached at 614-692-2332.

2.1.1 Submittal

Contractors and subcontractors shall watch a brief, approximately 10 minute, DM-FCE VPP Awareness film prior to performance of any on-site work. The video will be provided as a VCR tape or on a CD. A TV/VCR is available for use from the DSCC Installation Environmental, Safety and Occupational Health Office if needed. Contractors shall document, by use of the provided form or similar, that all contractor and subcontractor employees have viewed the film. A “VPP Awareness Training” form is provided at the end of this section. Only sub-contractors providing incidental services, e.g., laundry, delivery or other supply services are not covered. Copies of documentation shall be provided to the Contracting Officer or designee, who will forward them forwarded to the DSCC Installation Environmental, Safety and Occupational Health Office, upon completion.

2.1.2 Submittal

Contractors and subcontractors shall provide the information required by the “Contractor Safety/Environmental Management Systems Information Data Sheet”, also provided at the end of this section, prior to performance of any on-site work. If using subcontractors, information for subcontractors must be provided no later than 2 weeks prior to performance of any on-site work. Only sub-contractors providing incidental services, e.g., laundry, delivery or other supply services are not covered. Copies of the “Contractor Safety/Environmental Management Systems Information Data Sheet” shall be provided to the Contracting Officer or designee, who will forwarded them to the DSCC Installation Environmental Safety and Occupational Health Office, upon completion.

2.1.2.1 Submittal

For contracts that incur work hours greater than or equal to 1,000 hours/quarter (approximately 3 full-time employees), the Contracting Officer or designee will request that an OSHA Form 300A, for the last two years of operation, be submitted annually no later than January 15th of each year. Contractors with contracts which meet this requirement, but end prior to January 15th, shall submit this information at the end of the contract. Hours worked and injury information should be reflective of activity which occurred at the Defense Supply Center, Columbus. The Contracting Officer or designee will forward copies to the DSCC Installation Environmental Safety and Occupational Health Office upon completion.

2.1.3 Submittal

Safety Plan: The Contractor shall assure that an up-to-date Safety Plan is available at the job site at all times and available to the Contracting Officer or designee. The Safety Plan shall identify each major type of work (for example: plumbing, electrical, demolition, equipment installation, equipment maintenance) or where a subcontractor or work classification is to perform work. For each type of work the contractor shall prepare a Job Hazard Analysis (JHA).

2.1.3(a) The Contractor shall, for contracts with a completion schedule of 60 days or longer, submit a written Contractor Safety Plan to the Contracting Officer or designee for review within five

(5) days after receipt of the notice to proceed (NTP). Updated submissions are required whenever a JHA is added or changed.

2.1.3(b) For contracts with a completion schedule of less than 60 days, the Safety Plan must be made available to the Contracting Officer or designee upon request.

2.1.4 It is the responsibility of the Contractor to be aware of the safety requirements of personnel, equipment, buildings and materials.

All protective coverings, shields, protective barriers, barricades, warning signs, etc., will be furnished and installed by the Contractor where a hazard or potential hazard exists. Twenty-four (24) hours prior to the planned installation of protective barriers and barricades, the Contractor shall coordinate with the Contracting Officer or designee for concurrence and approval. Barricades and barriers shall be removed by the Contractor at the completion of work in the area.

2.1.5 Personal Protective Equipment (PPE)

Such as hard hats, safety glasses, safety shoes, etc. shall be worn in all areas and on all jobs as required by the DSCC Installation Environmental, Safety & Occupational Health Office.

2.1.5(a) All protective equipment must comply with appropriate

OSHA standards. All protective equipment is subject to review by the DSCC Installation Environmental, Safety & Occupational Health Office.

2.1.5(b) All hard hat areas shall be indicated by Contractor-furnished signs. It is mandatory that all personnel working on this project wear approved protective equipment for their own protection.

2.1.6 Accident/Incident

The contractor shall notify the Contracting Officer or designee, who will in turn notify the DSCC Installation Environmental, Safety and Occupational Health Office immediately after the occurrence of a serious accident resulting in either loss of life, or major property damage to a government facility. This notification shall not impede efforts to avoid additional injuries or damages.

2.1.6(a) Injury Treatment

Emergency first aid treatment is available for Contractor employees at the DSCC Installation Fire and Emergency Services, Building 46.

Fire and Emergency Services will respond for serious injuries occurring on Center. Emergency calls are made by dialing -911 on the Center telephone system, or 614-692-2111. If a private ambulance service is used, the Contractor is responsible for such expenses.

2.1.6(b) Mishap Reporting

A report on each job connected injury, property damage, or motor vehicle mishap shall be submitted to the Contracting Officer or designee, who will forward a copy to the DSCC Installation Environmental, Safety & Occupational Health Office, within 5 (five) days of the occurrence. This report may be made on either a Contractor's report form or DLA Form 1591, Mishap Report, or SF 91 (motor vehicle) found at http://www.dla.mil/dss/forms/. The estimated absence in days, if any, by employee due to injury and/or cost of property or vehicle damages shall be included.

2.1.7 Electrical Safety

Particular attention is directed to NFPA 70E, Standard for Electrical

Safety in the Workplace. Contractor shall fully comply with all sections of this standard, including but not limited to: PART I, Chapter 2-2.4.3 – Ground Fault Protection for Personnel on Construction Sites; PARTI, Chapter 3-7.1 – Use of Flexible Cords and Cables; PART II, Chapter 2-3 – Working On or Near Electrical Conductors or Circuit Parts; PART II, Chapter 5 – Lockout/Tag Out Practices and Devices. All electrical tools shall be properly grounded. Power saws shall be guarded.

2.1.8 Fall Protection

Particular attention is directed to the OSHA Fall Protection

Requirements. Personnel performing any type of work on elevated surfaces, over 6 feet, must adhere strictly to Fall Protection Standards. It is the responsibility of the Contractor to provide and maintain the fall protection plan to the Contracting Officer or designee for approval in accordance with Section 4, SUBMITTALS. Fall protection program/plan shall conform to the requirements of OSHA’S 1926.501, Duty to Have Fall Protection, and 1926.502, Fall Protection Systems Criteria and Practices. Attention is drawn to the requirement for Warning Line Systems, described in CFR Part 1926.502(f), and a competent person to monitor the safety of other employees per CFR Part 1926.502(h) - Safety Monitoring Systems.

2.1.9 Ladders & Scaffolds

2.1.9(a) Ladders shall be structurally rigid, sound, equipped with approved safety shoes, free of cracks and not painted. Ladders will be used only when very small hand tools or handling of light materials is involved. When performing electrical work or working near electrical lines, only ladders approved for electrical work shall be used.

2.1.9(b) Scaffolds shall have handrails and toe boards. Platforms shall be cleated to prevent movement.

2.1.10 All hand tools shall be kept in good repair and used only for the purpose intended. Defective tools shall be acceptably repaired or removed from service. Tools shall not be thrown from one level to another; and when used overhead, shall be secured by placing in tool boxes or other suitable containers when not in actual use.

2.1.11 All construction material shall be stored in a neat and stable manner so as to preclude leaning or falling stacks. Housekeeping will be maintained at a high level at all times. Scrap material, such as empty cartons, wood crates, etc., will be removed by the Contractor at the end of each work day.

2.1.12 Pneumatic tools and hoses shall be handled in strict accordance with EM 385-1-1, 3 September 1996, and the Occupational Safety and Health Act of 1970.

2.1.13 Compressed air used for cleaning purposes shall not exceed 30 p.s.i. when the nozzle end is obstructed or dead ended and then only with effective chip guarding and personal protective equipment.

Compressed air will not be used to blow dirt from hands, face or clothing.

2.1.14 Smoking will be prohibited except in designated areas.

2.1.15 Gasoline operated equipment used in buildings will be kept to a minimum to preclude the build-up of carbon monoxide and other air contaminants. Electric motor driven arc welders are preferred. If gasoline or diesel engine welders are used, the welder will be kept outside the building with welding cables run inside or the engine exhaust will be ducted outside the building subject to the DSCC Installation Environmental, Safety & Occupational Health Office’s approval. Excavating equipment will not be operated inside of any building without prior approval of the DSCC Installation Environmental, Safety & Occupational Health Office.

2.1.16 Submittal

Hazardous Material Safety Data Sheets: The Contractor shall provide

"prior to materials arrival on the installation" Material Safety Data Sheets (MSDSs) (OSHA Form 174 or equivalent) for all hazardous materials utilized during the period of this contract.

2.1.16(a) Copies of each MSDS shall be provided to the Contracting

Officer or designee, who will forward to the Environmental, Safety & Occupational Health Office for review and approval. Submittal will be reviewed within 10 working days. A copy of the MSDS shall also be kept on the job site. Hazardous materials are defined as (but not limited to) paints, lacquers, varnishes, sealers, thinners, adhesives, epoxies, acids, compressed gases, solvents, all chemicals containing flammable, toxic, caustic or corrosive mixtures. MSDSs are required regardless of the quantity required for the contract.

2.1.16(b) The listing of hazardous materials is not all inclusive.

Therefore, MSDSs are required for materials not listed therein, but contain hazardous ingredients, per paragraph (d) of 29 CFR Part 1910, Subpart Z, Section 1200, Hazardous Communication.

2.1.17 Confined Space Entry

The Contractor shall be responsible for compliance with all requirements as defined by the U. S. Department of Labor, Occupational Safety and Health Administration (OSHA) for Confined Space Entry. The Environmental, Safety & Occupational Health Office and the Fire Prevention Office shall be notified when and where confined space entry is occurring.

2.1.17(a) Confined spaces include, but are not limited to, manholes and Catch Basins as defined by OSHA regulation 29 CFR 1910.146, and shall be treated as a permit-required space.

2.1.17(b) The Contractor shall establish and use a permit system to restrict access to the space and to assure hazards within the space are controlled prior to entry.

2.1.17(c) The Contractor shall perform all required atmospheric testing for all potential air contaminants and oxygen deficiencies in the space. The space must be tested immediately prior to initial entry, and the space shall be repeatedly tested as needed but no less frequently than once per shift. At a minimum, the space will be tested for oxygen deficiency, flammables, carbon monoxide and hydrogen sulfide. The sampling protocol used by the Contractor is subject to review by the Contracting Officer or designee.

2.1.17(d) Forced ventilation shall be provided as necessary to assure air contamination remains below the limits as specified in 29 CFR 1910.1000. Confined spaces may be entered only where forced ventilation moves a volume of air at least 10 times the volume of space each hour (ten or more air changes per hour).

2.1.17(e) Tools and lighting must be selected to minimize hazards within the space.

2.1.17(f) Protective equipment shall be selected by the Contractor that is suitable for use against specific hazards in the space.

Protective equipment is subject to review by the Contracting Officer or designee.

2.1.17(g) The Contractor shall provide a person to serve as an attendant at the portal entry into the space. The attendant shall prevent unauthorized entry and summon assistance in case of emergency. The attendant shall be provided with protective equipment.

2.1.17(h) The Contractor shall request permits to enter the space through the Installation Environmental, Safety & Occupational Health Office (614-692-2332) and notify Installation Emergency Services Communication Center (ESCC) prior to entry.

2.2 FIRE PREVENTION

The following fire provisions are only general in nature and will not excuse a Contractor from following other fire prevention practices as established. In the event or suspicion of fire, immediately call the DSCC ESCC (Emergency Telephone: 911 from Center telephone system 614- 692-2111 from cellular telephones) to report the conditions.

2.2.1 Gasoline and other flammable liquids will be stored in approved safety cans with spring loaded, self-closing lids. Gasoline dispensing tanks shall be properly grounded, surrounded by a sand dike at least 12 inches high and located at least 50 feet from any structure. Location is to be specified by the DSCC Installation Fire Inspector, 614-692- 2921.

2.2.2 Tools and equipment used in buildings where flammable materials are stored or where flammable liquids are being used shall be of spark proof construction.

2.2.3 Equipment shall not be refueled with the engine running.