DISA B11S13
INDEPENDENT GOVERNMENT COST ESTIMATE
PROJECT NO. CSC-20046 DRAWING NO. 4-578 DATE:
PROJECT TITLE: Install Infrared Heaters, Building 43
ARCHITECT/ENGINEER: ESTIMATOR:
PRELIMINARY DESIGN FINAL DESIGN X OTHER
| ITEM | QUANTITY | MATERIAL | LABOR | EQUIP COST | TOTAL COST | ||||||
| NO. OF UNITS | UNIT OF MEASURE | PER UNIT | TOTAL | UNIT MANHOUR | TOTAL MANHOURS | RATE PER HOUR | TOTAL | UNIT RATE | TOTAL | ||
| GENERAL CONDITIONS COST | |||||||||||
| MOBILIZATION/DEMOBILIZATION | JOB | ||||||||||
| DUMPSTER, RENTAL | Weeks | ||||||||||
| RENT AERIAL LIFT | MO |
TOTAL GENERAL CONDITIONS SUBTOTAL
MECHANICAL COST
| DUCTWORK, METAL;SELECTIVE DEMOLITION | LBS |
| INFRARED HEATER SYSTEM, INCLUDING VACUUM AIR PUMP | EA |
| INFRARED HEATER SYSTEM CONTROLLER | EA |
| BLACK STEEL PIPE, 1" DIA | LF |
| BLACK STEEL PIPE, 1-1/4" DIA | LF |
| 1" GAS REGULATOR | LF |
| AIR GRILLE | EA |
| MAU/INFRARED CONTROL CONFIGURATION | JOB |
TOTAL MECHANICAL SUBTOTAL
| ELECTRICAL COST | |
| #12 THHN WIRE | CLF |
| 3/4" EMT CONDUIT (INCLUDING ALL BENDS, ELBOWS, FITTINGS, ETC…) | LF |
| 20A DUPLEX RECEPTACLE (INCLUDES BOX, RECEPTACLE, COVERPLATE) | EA |
TOTAL ELECTRICAL SUBTOTAL
| TOTAL PROJECT CONSTRUCTION COST | SUBTOTAL |
| OH | |
| PROFIT | |
| BOND | |
| FINAL |