Att 11a ROTA - Spill Plan.pdf
PDF 2 MB Posted
- Attached to
- HAZARDOUS WASTE DISPOSAL SERVICES FOR SPAIN Federal contract opportunity
- Solicitation number
- SP4520-10-R-0001
About this file
Attachment 11a
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att 5 HWPS.pdf | ||
| Att 2 1348-1A.pdf | ||
| Att 15 APLs.pdf | ||
| Att 3 1683E.pdf | ||
| Att 14 PP Survey.pdf | ||
| Att 4a Facility Profile Sheet.pdf | ||
| Att 10 Sample Label.pdf | ||
| Att 12 Country Clearance Insurance.pdf | ||
| Att 1 DD1155.pdf | ||
| Att 4b Transporter Profile Sheet.pdf | ||
| Solicitation Cover Letter.doc | DOC document | |
| Att 13 FGS Spain 2008.PDF | ||
| Att 11b Moron AB - Spill Plan.pdf | ||
| Bid Schedule.xlsx | XLSX spreadsheet | |
| Att 8 Monthly and Annual Status Report.pdf | ||
| Att 7 RESERVED.pdf | ||
| Att 9 Special Equipment.pdf | ||
| Att 6 PP History.pdf | ||
| Spain RFP SP4520-10-R-0001_Latest 16 Dec 09.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP4520-10-R-0001, SPAIN Page 1 of 76 ATTACHMENT 11a
NAVSTA ROTA SPCR i August 2002
TABLE OF CONTENTS
VOLUME 1 – SPILL PREVENTION, CONTROL AND REPORTING PLAN
Record of NAVSTA Rota SPCR Updates and Changes............................................................................... ii
Executive Summary...................................................................................................................................... iii
1.0 INTRODUCTION
1.1 Regulations
1.2 Administration and Policy
1.2.1 SPCR Plan Update Requirements
1.3 SPCR Organization
1.4 NAVSTA Rota Description
1.4.1 Mission
1.4.2 History
1.4.3 Location
2.0 SPILL POLICY
2.1 COMNAVACTSPAIN/NAVSTAROTA General Spill Policy
2.2 Initial Response Actions
2.3 First Responder: NAVSTA Rota Fire Department
2.4 Response Actions
2.5 Command Duty Officer
2.6 Installation On-Scene Coordinators (IOSCs) for POL/HS
2.7 Immediate Response Teams
2.8 Incident Command System (ICS)
2.8.1 Responsibilities
2.9 Notifications
2.9.1 Immediate Notification Checklist and Response Team Members
2.9.2 Reporting Requirements
2.9.3 Disposal of Spill Debris
2.9.4 Training
2.9.5 Spill Communications Plan
3.0 SPCR FACILITY EVALUATIONS
3.1 SITE 1: NEX Gas Station (Building 178)
3.2 SITE 2: Public Works Gas Station (Building 83)
3.3 SITE 3: Hazardous Minimization (HAZMIN) Center (Building 3157)
3.4 SITE 4: Aviation Fuels and JP8 Load Rack
3.5 SITE 5: Booster Pump House Tanks, JP5/F76 Load Rack, & OWS
3.6 SITE 6: Bulk Fuel Farm and Ready Issue Tank Farm
3.7 SITE 7: VQ-2 Squadron Operations (Building 5)
3.8 SITE 8: AIMD (Buildings 1800, 1801, 211, 5 and 133)
3.9 SITE 9: Public Works Power Plant
3.10 SITE 10: Public Works Transportation Maintenance
3.11 SITE 11: Port Operations Including Piers 1, 2 and 3
3.12 SITE 12: DRMO (Buildings 186 and 1811)
3.13 SITE 13: Pest Control (Building 1865)
3.14 SITE 14: Air Force (725 AMS) Operations & Dispensing Area (Bldg. 1989)
3.15 SITE 15: NAVSTA Air Operations
3.16 SITE 16: Camp Mitchell (Seabees)
3.17 SITE 17: Miscellaneous ASTs
SP4520-10-R-0001, SPAIN Page 2 of 76 ATTACHMENT 11a
NAVSTA ROTA SPCR iii August 2002
Record of NAVSTA Rota SPCR Updates and Changes
Change Number Page(s) Affected Abstract Date Author’s
Initials
SP4520-10-R-0001, SPAIN Page 3 of 76 ATTACHMENT 11a
NAVSTA ROTA SPCR iii August 2002
EXECUTIVE SUMMARY
The Naval Station (NAVSTA) Rota Spill Prevention, Control and Reporting (SPCR) Plan is separated into two volumes for ease of use:
VOLUME 1: (Condensed Version) Advises who to call, when, defines a significant spill, immediate response actions, and summarizes locations where a significant spill may occur, and includes 17 specific sites. This version is condensed for the general user.
VOLUME 2: (Long Version) Details prevention, control, reporting, and training procedures and requirements summarized in volume 1. Elaborates on Incident Command System (ICS) implementation, surveillance, inspections, training exercises, drills and record keeping. Complies with COMFAIRMED instruction 5090.3A (Navy On-scene Coordinator) and Final Governing Standards (FGS) for Spain 1994 version, provides Tank Inventory and Management Plan (TMP), oil and hazardous substance inventory, deficiencies and facility recommendations, and worst-case spill scenarios.
This is a working document for specific answers to evaluator’s questions. Copy of this volume is maintained within the Public Works Environmental Office, not intended for general use.
This is an Environmental response, prevention and control document adhering to the requirements in OPNAV instruction 5090.1, COMFAIRMED instruction 5090.3 and Final Governing Standards for Spain. It does not address incidents covered under other U.S.
Navy directives and protocols, such as:
1) Weapons and munitions related incidents
2) Infectious, pathological and biological medical waste
3) Radiological incidents
4) Warfare/Force Protection and Disaster Preparedness issues.
SP4520-10-R-0001, SPAIN Page 4 of 76 ATTACHMENT 11a
NAVSTA ROTA SPCR 1 August 2002
1.0 INTRODUCTION
1.1 Regulations
The U.S. Department of Defense (DOD) Environmental Final Governing Standards (FGS) for Spain define the environmental protection compliance standards for DOD installations in Spain. The FGS for Spain were developed by adopting the more protective requirements of the Overseas Environmental Baseline Guidance Document (OEBGD), European Union laws and regulations, and Spanish laws and regulations at the national, regional, and local levels.
A facility is required to be included in the SPCR Plan if it is capable of producing a significant spill. A significant spill is defined by quantity as follows:
• Hazardous Waste (HW) or Hazardous Substance (HS) spill in excess of the corresponding reportable quantity (RQ) listed for the particular HW or HS in Table A.4 of FGS
• Refined Petroleum, Oil and Lubricants (POL) or liquid or semi-liquid hazardous material Hazardous Material (HM), HW, or HS spill in excess of 110 gallons
• Other HM in excess of 500 pounds (lbs.)
• A combination of POL and HM, HW, or HS in excess of 750 lbs.
In addition, facilities located near an environmentally sensitive area with the potential to impact the environment have been included in the Spill Prevention, Control and Reporting (SPCR) Plan.
NAVSTA Rota is required to have a SPCR Plan because it is capable of producing a significant spill as defined above.
All handling and storage facilities that are responsible for HS or POL materials in excess of the above quantities are required to have a copy of Volume 1 of the NAVSTA Rota SPCR Plan.
1.2 Administrations and Policy
This Spill Prevention Control and Reporting (SPCR) Plan has been prepared in accordance with Chapter 18 of the Final Governing Standards (FGS) for Spain, 1994.
Sixteen facilities at NAVSTA Rota have been identified as having the potential to produce a significant spill as defined by the FGS. A comprehensive review of these facilities is given in Volume 1, and recommended corrective actions are given in Annex N of this volume.
SP4520-10-R-0001, SPAIN Page 5 of 76 ATTACHMENT 11a
NAVSTA ROTA SPCR 2 August 2002
Spill prevention, control, and reporting procedures for all HS, HW and POL handling and storing facilities are described in this volume.
1.2.1 SPCR Plan Update Requirements
• The FGS require the SPCR Plan to be updated at least every five years or when there are significant changes in operations or facilities or a significant spill occurs.
• COMFAIRMED requires that the SPCR Plan be reviewed annually and updated as needed.
• Changes of personnel, titles, codes, and telephone numbers will be provided by notice.
Compliance to the SPCR Plan is mandatory for all SPCR facilities identified herein.
The SPCR Plan supersedes all previous spill contingency plans.
1.3 SPCR Organization
Volume 1 contains the general spill policy and the Facility Evaluations (SPCR facilities) identified at NAVSTA Rota.
Volume 2 contains spill prevention, control and reporting procedures for NAVSTA Rota and annexes with supporting information.
1.4 NAVSTA Rota Description
1.4.1 Mission
NAVSTA Rota supports naval activities of the Sixth Fleet in the Mediterranean. The Naval Station provides facilities, services and material support for operations and maintenance of naval weapons and aircraft for activities and units of the operating forces as designated by the Chief of Naval Operations. Facilities at NAVSTA Rota include three fueling piers, a large airport, various large fuel storage facilities, a power plant, and various other support facilities.
1.4.2 History
The U. S. Naval Complex at Rota was constructed in response to the September 1953 Defense Agreement permitting U. S. and Spanish cooperation to build and occupy various military bases on Spanish soil. Early construction began in 1955 and has continued to the present. The base is used by both the U.S. Navy and Spanish Navy.
SP4520-10-R-0001, SPAIN
ATTACHMENT 11a
NAVSTA ROTA SPCR 3 August 2002
1.4.3 Location
NAVSTA Rota consists of more than 150 facilities located on the Bay of Cadiz on the west coast of southern Spain. Facilities at NAVSTA Rota are shown in Annex A. The approximate number of activity personnel is 9,000 total, including a military population of approximately 4,500, although the population has decreased since 1994. NAVSTA Rota supports 491 single-family housing units and 91 multi-family housing units.
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 4 August 2002
2.0 SPILL POLICY
2.1 COMNAVACTSPAIN/NAVSTAROTA General Spill Policy
SIGNIFICANT SPILL: Any uncontained spill of petroleum products, oil and lubricants (POL) or hazardous material/waste greater than the reportable quantity (RQ) -- or if the Facility Incident Commander (FIC) determines a spill is significant.
If a spill is contained inside an impervious berm, or on a non-porous surface, or inside a building and is not volatilized and is cleaned up, the spill is considered a contained release and is not considered a significant spill. Significant spills must be reported and documented. (See detailed notification requirements in Section 2.9.2, and Section 4 of Volume 2.)
Example: Immediate cleanup is key; if a 50 gallon POL spill on land is ignored, not cleaned up immediately and allowed to seep into ground, that is significant, even though it is not specified as a reportable quantity.
YOU SPILL YOU DIG!
All activities on-board NAVSTA will clean up all spills regardless of quantity, significance, or whether you have to report it. All activities that have the potential for a significant spill will have the capability to clean up a minor spill (up to 110 gallons of POL).
The spill causing activity has the primary responsibility for spill notification and cleanup (i.e., providing manpower, materials, absorbents, shovels, brooms, drums, etc.). The spill causing activity will prepare the incident report, as needed.
If a response action is required, once the spill is stabilized and contained by the Fire Department, the spill causing activity will support the cleanup and be responsible for disposal. (Tenant/Visiting Command may be responsible for response costs.)
All spills (of any amount) on the flightline should be reported to the Fire Department at ext: 2950.
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 5 August 2002
Common RQ examples (Not sure? Report it):
See requirements section on reports. (Section 2.9.2)
Type Material Examples RQ*
(*ANY AMOUNT
IN THE WATER!)
Equivalent*
(*ANY AMOUNT IN
THE WATER!)
1. Petroleum products JP8, JP5, Diesel, used/unused lube oil, hydraulic fluid, kerosene, etc.
110 gallons Two 55-gallon drums
2. Hazardous waste:
D001 – Ignitable D002 – Corrosive D007 – Chromates
Paint related material Sulfuric Acid, Sodium hydroxide Alodine
100 pounds 100 pounds 10 pounds
12.5 gallons
12.5 gallons 1 gallon
3. Hazardous Material:
Ethylene Glycol Calcium Hypochlorite Toluene
Auto Anti-Freeze Decon. Agent, disinfectant Paint thinner
110 gallons 10 pounds 1000 pounds
Two 55-gallon drums 1 gallon 125 gallons
2.2 Initial Response Actions
The phone number 911 is Emergency Dispatch, used for Emergencies. This number immediately invokes Fire, Police, Ambulance or Disaster Preparedness Officer, as needed, 24 hours a day, 7 days a week. It should be used for emergencies only!
Refer to communications plan (see Figure 2.1 at end of section) and Section 2.9 (notification checklist) for non-emergency Immediate Notifications.
What constitutes an Emergency?
1. Fires, smoke, explosions, alarms
2. Personnel injuries
3. Unknown situations, not sure what to do? Where it’s coming from? Too much to handle? Call for help before it gets out of control.
As stated in general spill policy, all activities at NAVSTA Rota that handle hazardous materials and petroleum products will have the capability to contain a spill they may cause.
When a significant spill is first detected (>110 gallons POL), the following actions should be taken:
1) Without endangering yourself, stop the leak or spill.
2) Evacuate personnel to a safe distance upwind and upgrade from the spill.
NAVSTA ROTA SPCR 6 August 2002
3) Pass the word to people in adjacent places.
4) Inform your supervisor or the supervisor of the nearest facility.
5) Dial 911 (security dispatch).
6) Give the following information:
• Name, telephone number, and identification of caller
• Time and location of spill
• Identity and quantity of spill materials
• Origin and cause of spill
• Description of spill (behavior of spill, affected areas)
• Anticipated movement of spill
• Planned or initiated actions
• Type of assistance required
• Is the spill on land or in the harbor waters?
7) For water spills, notify Port Operations Duty Officer (number 911) to activate the
Water Immediate Response Team.
8) Restrict all sources of ignition.
9) If a person has been splashed with a fuel or chemical, wash him/her with plenty of water for at least 15 minutes, remove all contaminated clothing, and GET MEDICAL
ATTENTION: EXT. 911.
10) If a person has been overexposed by inhalation, get the victim to fresh air, supply artificial respiration, if necessary, and GET MEDICAL ATTENTION.
11) Wait for the NAVSTA Rota Fire Department to arrive and direct them to the spill.
12) Provide Material Safety Data Sheets, if available.
2.3 First Responder: NAVSTA Rota Fire Department
The Fire Department is the First Responder and Immediate Response Team (IRT) for land and support team for water spills. The Fire Department will respond to contain the
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 7 August 2002 spill and to clean up minor spills with available resources only. They are to be notified for all spills regardless of quantity, especially for fuel spills.
2.4 Response Actions
The spill causing activity has the primary responsibility for spill notification and cleanup (i.e., the providing manpower, materials, absorbents, etc.). The spill causing activity will prepare the incident report, as needed.
All activities that have the potential for a significant spill will have the capability to clean up minor spills (up to 110 gallons of POL).
Once the spill is stabilized and contained by the Fire Department, the spill causing activity will support the cleanup. Most land oil spills can be cleaned up using Level D Personal Protection Equipment (PPE), a broom, and a shovel.
2.5 Command Duty Officer (CDO)
The CDO will immediately assume the following duties temporarily as the Installation On-Scene Coordinator (IOSC) and direct immediate response until properly relieved by the IOSC. The CDO is the official Command Representative and is given the authority to act on the behalf of the Commanding Officer in the event of an emergency. The CDO will work closely with the Fire Chief (IOSC), commit resources as the situation dictates, and notify personnel using recall lists at his/her disposal.
2.6 Installation On-Scene Coordinators (IOSCs) for POL/HS
The IOSC for land spills is the Fire Chief. The IOSC for spills during fueling operations is the Fuels Officer. The IOSC for water spills in the harbor is the Port Operations Officer. The IOSCs will implement the SPCR Plan for any significant spill.
2.7 Immediate Response Teams (IRTs)
Land IRT: All Personnel have been trained in Emergency Response Procedures. The teams can be reached 24 hours a day, 7 days a week by dialing 911.
Water IRT: All personnel are trained in small boat operations and oil spill containment and recovery. Personnel can be reached 24 hours a day, 7 days a week through the CDO or Port Services Duty Officer by dialing 911.
2.8 Incident Command System (ICS)
The chart below illustrates the NAVSTA Rota OHS Spill Response Organization based on Incident Command System recommended by COMFAIRMED Inst. 5090.3A.
Implementation details of the ICS are discussed in Volume 2, Chapter 2.
NAVSTA ROTA SPCR 8 August 2002
Incident Command System Oil and Hazardous Substance Spill Response
NAVSTA Rota Organizational Structure
Legal Officer LCDR Shwartz
Host Nation Liaison Toby/Jose Salido?
Safety Officer Billie Sizemore
Public Affairs Officer LT Davis
Operations Section Chief
- LCDR Walker (water)
- Chief McElroy (hazmat)
- LT Parsha (fueling ops)
Planning Section Chief CDR Higgins
Logistics Section Chief CDR Yudiski
Finance Section Chief LDCR Sosa
CDR Osborne Deputy Facility Incident Commander
Captain Noble Facility Incident Commander (FIC)
2.8.1 Responsibilities:
• Legal Officer -- anticipates legal issues and advises.
• Safety Officer -- Establishes safety zones, site safety plan, advises on PPE requirements.
• Host Nation Liaison -- Communicates with Host Nation.
• Public Affairs Officer -- On-base press releases as required. All off-base information through the Spanish Navy.
• Operations Chief -- Executes spill response and cleanup. Identifies resource requirements. Evaluates and reports results of response.
• Planning Operations Officer -- Develops plan and disseminates policy and guidance.
Notifies NOSC as required. Coordinates centrally managed training.
• Support Operations Chief -- Supports operations via communications, food, medical support, security, transportation, etc.
• Financial Section Chief -- Tracks expenditures and pursues reimbursement from responsible parties. Handles accounting and personnel administration.
NAVSTA ROTA SPCR 9 August 2002
2.9 Notifications
2.9.1 Immediate Notification Checklist and Response Team Members
NOTIFY TELEPHONE NUMBER POINT OF
CONTACT
NOTIFICATION REQUIRED
WHEN: NOTIFIED
Fire Department # 911
POL or HS spills are too large to be controlled by facility personnel
Primary IOSC (Land Spills)
# 2950 (24-Hr. Dispatch)
Fire Chief
POL or HS spills are too large to be controlled by facility personnel
IOSC (Fuel Spills)
# 2569
# 4989 (24-Hr. Dispatch)
Fuels Officer POL spills requiring control and cleanup
IOSC (Water Spills)
# 2020
# 2222 (24-Hr. Quarterdeck)
#2232
#2811
Port Ops. Officer
Port Ops. Leading Chief Petty Officer
Port Control Duty Desk
POL spills requiring control and cleanup in port area
Naval Station Rota AFTER
HOURS
# 2222 CDO/Quarterdeck
Spills requiring control and cleanup assistance; AFTER HOURS
Safety Manager # 2409/2252
Billie Sizemore
All HS/POL Spills which require Immediate Response Team Actions
Environmental Coordinator
# 1418 # 2347 (24-Hr. Dispatch) Tim Riordan HS spills requiring control and cleanup assistance occur
Alternate Environmental
Coordinator
# 2809 # 2347 (24-Hr. Dispatch) Mike Biever HS spills requiring control and cleanup
Security Manager # 2155/2779 LT David Kush
All HS/POL Spills which require
Water Crew Supervisor
# 2209 Richard Cox Chlorine Alarm
Fuels Division Dispatch
# 4989
Duty Officer POL spills requiring control and cleanup
Public Works Trouble Desk
# 2347 Duty Officer All HS/POL Spills which require
Camp Mitchell
# 2141 Duty Officer All HS/POL Spills which occur at Camp
Mitchell
Hospital
Ext. 3300/3307 Medical assistance needed
Spanish Port Captain
956-82-6820 POL spills which require Spanish assistance
Navy On-Scene
Coordinator (NOSC)
DSN: 626-4303
COMM: +39-081-568-4303 Admiral Holmes Notified by Environmental Coordinator, or FIC
Deputy NOSC
DSN: 626-3099
COMM: +39-081-568-3099 COMFAIRMED N4 Notified by Environmental Coordinator or FIC
NOSC Representative
DSN: 626-4680
COMM: +39-081-568-4680
Peter Gallant Notified by Environmental Coordinator
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 10 August 2002
NOTIFY TELEPHONE NUMBER POINT OF
CONTACT
NOTIFICATION REQUIRED
WHEN: NOTIFIED
Cell: +39-335-725-8097
SDO
DSN: 626-3366/3368
(24 Hrs/Day)
COMM: +39-081-568-
3366/3368 (24 Hrs/Day)
Notified by Environmental Coordinator
2.9.2 Reporting Requirements
The Facility Incident Commander (FIC) is responsible for notifying the proper authorities when reportable OHS discharges or releases occur within the FIC's area of jurisdiction.
NAVSTA Rota is responsible for response to OHS spills on land and adjacent waters caused by U.S. Navy activities or vessels in Rota.
1) Internal: NAVSTA Rota Fire Department complies with DODI 6055.7 DoD Fire Incident Reporting for all responses, regardless of quantity or significance. A copy of the Spill Prevention Control Report is included in Annex M of Volume 2. NAVSTA Fire Department maintains record.
An additional external report is required for significant spills, as specified below.
2) External: OFFICIAL NAVY MESSAGE (Environmental Coordinator will prepare Oil Spill Report, OPREP-3/SITREPs will be sent using existing protocols). The FIC will immediately notify the COMFAIRMED NOSC and the Executive Agent (CIN CUSNAVEUR) and submit a follow-up written report when:
• The spill occurs inside an installation and cannot be contained within any required berm or secondary containment
• The spill exceeds 400 liters (110 gallons) of POL
• A water source has been polluted
• The FIC is required, in accordance with country specific Final Governing Standards (FGS) or Environmental Executive Agent requirements, to report the spill to the host military
• The FIC has determined that the spill is significant
• If a spill is contained inside an impervious berm, or on a nonporous surface, or inside a building and is not volatilized and is cleaned up, the spill is considered a contained release and is not considered a significant spill.
A significant spill as defined in Spanish FGS is an uncontained release to the land or water in excess of any of the following quantities:
• For a hazardous waste or hazardous substance identified as a result of inclusion in the FGS Appendix A, Table A.4, in a quantity in excess of the reportable quantity
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 11 August 2002
(RQ) listed in RQ column (common examples listed in Section 2.0, and Annex G located in Volume 2)
• For POL or liquid or semi-liquid hazardous material, hazardous waste or hazardous substance, in excess of 400 liters (110 gallons)
• For other solid hazardous material, in excess of 225 Kg (500 pounds)
• For combinations of POL and liquid, semi-liquid and solid hazardous materials, hazardous waste or hazardous substance, in excess of 340 Kg (750 pounds).
When a significant spill occurs inside a DoD installation and cannot be contained within the installation boundaries or threatens the local host-nation drinking water resource, the COMFAIRMED NOSC, CINCUSNAVEUR, and appropriate host nation defense counterpart will be notified immediately.
OPNAVINST 5090.1B Oil Spill Message Report (Significant Spills) (Examples included in Annex B of Volume 2)
REPORT required information:
1) Date Spill occurred: 01 Oct. 2001, 1600
2) Activity/ship originating release: USS Bataan LHD5
3) Location: Naval Station Rota, Pier 1
4) Amount: 15 gallons
5) Type: Hydraulic Fluid
6) Operation when spilled occurred: Loading operations
7) Spill cause: Hydraulic line leak
8) Slick description/movement: Contained pier side and next to ships hull
9) Spill Environment: Sunny, low sea state
10) Areas damaged: Harbor area surrounding Pier 1
11) Voice report to COMFAIRMED was made
12) Samples were not taken
13) Containment method: Ship’s hull
14) Discharge removal method: Sorbents
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 12 August 2002
15) Volume of Product recovered: 5 gallons
16) Parties Performing Pollution Removal: Port Operations
17) Host Nation Regulatory Activity: None
18) Assistance required: None
19) Lessons learned: Boom ship
20) Activity contact: Mike Biever x/2809.
OPREP-3 Reporting
Official Navy messages:
Four different types, complete definitions and examples contained in OPNAVINST 3100.6G (OPREP-3/SITREP) and OPNAVINST 5090.1B (Environmental Natural Resources), summarized below:
1) Navy Pinnacle
2) Navy Blue
3) Unit Sitrep
4) Oil Spill Report
1) Navy Pinnacle: Incident or event occurs which is likely to generate national interest, i.e., attack, terrorist activity, loss of ship, etc.
Notification time requirement (3100.6G): (voice) 5 minutes from knowledge of event; (message) 20 minutes of event.
2) Navy Blue: Incident or event that may have military, political, or press interest, i.e., violent crime, fires, property damage, discharge of pollutants into critical waters or could threaten public health, welfare or create enforcement actions, etc.
Notification time requirement (3100.6G): (voice) 5 minutes from knowledge of event; (message) 20 minutes of event.
NOTE: A small spill in the water, contained, under control, or being responded to and being cleaned up is not a Navy Blue. Spill on land is not a Navy Blue.
3) Unit Sitrep: Incidents or events that do not qualify for pinnacle or blue reporting but may create interest, and follow-up actions.
NAVSTA ROTA SPCR 13 August 2002
4) SIGNIFICANT Oil Spill Report: In addition to OPNAVINST 3100.6G requirements above, land/water spills may or may not require Unit Sitrep (CO’s discretion), depends on significance. Specific Oil spill message format specified in Annex B of Volume 2.
Notification time requirement (5090.1B): (voice) immediately upon knowledge;
(message) as soon as practicable. If Oil spill report is not closed, follow-up with Unit Sitrep.
Military Sealift Command (MSC), Sixth Fleet Pollution Incidents
NAVSTA Rota may be reimbursed for spill response expenses incurred; documentation and after-action report are required for reimbursement.
2.9.3 Disposal of Spill Debris
Spill debris will be disposed of in accordance with NAVSTA Rota instruction 5090.1 and Chapter 6 (hazardous waste) of the Spanish FGS. Once the waste is consolidated, packaged and identified (i.e., 1348-1, waste profile sheet), Public Works Environmental Division is centrally funded for the disposal of NAVSTA hazardous waste through DRMO; tenant activities will be responsible for funding disposal of their spill debris.
55-gallon drums and absorbents are standard stock items, available through NAVSTA Supply Department at a spilling Activity cost:
Open top for solids – NSN 8110-00-030-7780
Closed top (bung) for liquids – NSN 8110-00-292-9783
Absorbent (50 lb. bag) – NSN 7930-00-269-1272
Absorbent pads for oil 16” X 18” – NSN 4235-01-219-7414
Not intended as complete list, other equivalent materials may be open-purchased using commercial vendors or Milstrip/Fedstrip using DLA Defense Supply Center Richmond (www.dscr.dla.mil).
2.9.4 Training
Training will be conducted and will follow the requirements detailed in Chapter 5.0 of Volume 2.
2.9.5 Spill Communications Plan
NAVSTA Rota’s Spill Communications Plan is depicted in Figure 2.1.
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 14 August 2002
FIGURE 2.1: SPILL COMMUNICATIONS
Telephone will be the primary means of communication for facilities and other command level activities such as the field level Incident Response Team (IRT). All NAVSTA response parties are equipped with 2-way radios programmed for interdepartmental communications.
Command Duty Officer (FIC Representative) x/2222 Cellular: 659452541
NOSC - COMFAIRMED (Naples)
39-081-568-4680 Spill Emergency (Dial 911) Cell: 3357258097 Security/DP Dispatch
PWD Trouble x/2347 (24 hr)
Hospital/Ambulance (Needed) x/3307
Spiller is responsible for clean-up support!
Help is needed?
Fuels Division (Supply) x/4989 (24 hr.)
(Spills involving fueling operations) flightline
NON EMERGENCY
90% of spills!
Air Ops.
Water (Port Ops.) x/2811 (no 24 hr) Land (Fire Dept.) x/2950 (24 hr.)
Duty cell:
659440315 LCPO cell:
617118954 Port Ops Officer:
Cell: 659812187
Environmental Telephone Tim Riordan Cell: 659469333 x/1418
Alt: Mike Biever Cell: 659921494 x/2809
PWU- Water Crew for chlorine alarm:
Cell: 699452468 x/2209
IRT’s
NAVSTA ROTA SPCR 15 August 2002
3.0 SPCR FACILITY EVALUATIONS
Potential POL and Hazardous Substance/Material spills associated with the activities at NAVSTA Rota could result from transfers, tank or pipe failure, leaks, accidents, systems malfunction, human error, or natural disasters. Because NAVSTA Rota has relatively level terrain in the areas in which these products are stored, surface runoff or spills would either pond in depressions in the local topography or would flow to one of the many drainage ditches located on base. Most small spills associated with these areas would soak into the sandy soil before reaching a drainage ditch.
Because much of NAVSTA Rota is unpaved, the potential for POL and HS/HM spills to soak into the ground is high. Leaks from underground storage tanks (USTs) and pipelines are the greatest potential source for subsurface contamination. However, most USTs have been replaced with new double-walled USTs.
Seventeen sites (16 facilities, and one miscellaneous AST section) have been addressed in this SPCR plan because of their ability to produce a significant spill. The site visits were conducted in August of 2001. The following site evaluations contain:
general information about the site, a discussion of possible spill risks, a description of storage tanks and products stored, site transfer operations, types of containment, drainage, security, and a site figure. The information presented for each site was obtained by visual inspection of the facility; review of pertinent records, maps, and the May 2001 SPCR Plan; and interviews with NAVSTA Rota personnel. Annex N (Volume
2) presents a list of recommendations for the deficiencies identified during the site evaluation. Volume 2 details spill prevention guidelines for NAVSTA Rota and contains a tank inventory and management plan in Annex D.
Miscellaneous Hazardous Substances and Areas Worth Special Mentioning
Most hazardous substances and materials at NAVSTA Rota are handled through the Consolidated Hazardous Waste Reutilization and Inventory Management Program (CHRIMP) and stored at the HAZMIN Center (Site 3). The following materials or areas are worth special mention for spill planning purposes but are not one of the 17 sites:
Chlorine Gas
Chlorine gas is stored in 100 kg. (220 lb.) cylinders located at Building 536 (near Utilities Power Plant); there are about 12 cylinders in storage (2640 lbs.). It is used at the drinking water reservoir, Building 71 (2 cylinders-440 lbs.). Chapter 5 of the Final Governing Standards (FGS) states any amount greater than the threshold planning quantity (TPQ) of 100 lbs. will be reported to the Executive Agent (CNE). Public Works Utilities is attempting to eliminate the use of Chlorine Gas for drinking water chlorination and use less toxic liquid sodium hypochlorite. The transition has occurred with the Granulated Activated Carbon (GAC) plant, Building 68 (see write up below). NAVSTA Rota’s historical use of gaseous chlorine is about 2000 lbs./year and should decrease.
NAVSTA ROTA SPCR 16 August 2002
See worst-case scenario in Annex L and a discussion on the hazards of chlorine in Annex G.
Propane
There is a significant amount (i.e., fire piles) of propane used on NAVSTA Rota, roughly 61,000 lbs. It is used at:
• MWR Champions – 6.4 CM
• MWR Fleet Recreation Center – 5.8 CM
• NEX Laundromat – 12 CM
• NEX Laundromat – 7.0 CM
• Camp Mitchell – 10.0 CM
• MWR Reflections – (2) 8.2 CM.
Propane is liquefied petroleum gas and would be considered a significant spill if released (1CM = about 262 gallons). Single storage of greater than 10,000 lbs. (9CM) is considered a significant fire hazard. The tanks are routinely serviced by the Resident Officer in Charge of Construction (ROICC) contract. Propane gas is provided through the Supply Department using a blanket purchase agreement.
GAC Plant, Building 68
In the fuel farm area at the drinking water inlet there is about 5280 lbs. (two 1200 kg.
containers) of 15% sodium hypochlorite solution in use. The reportable quantity (RQ) for sodium hypochlorite is 1000 lbs. (125 gallons or 474 liters). The liquid is less toxic then the gaseous chlorine, but not non-hazardous. It is corrosive and an oxidizer. The type used is nearly three times stronger than typical household use chlorine (i.e., clorox). The Supply contract changes containers every 30 days equating an annual usage of roughly 64,000 lbs. A large spill of this material would be considered significant.
Disaster Preparedness Warehouse, Building 1961
There are 140-50 lb. (7000 lbs.) cans of Super Tropical Bleach (Calcium Hypochlorite) stored in this warehouse. The RQ for calcium hypochlorite is 10 lbs.; a release of this material would be considered significant.
DGF High School Science Laboratory Stockroom, Room 803
A significant amount of small quantity chemicals of various types are stored in this room for classroom experiments. The room is designed for this purpose. If a release occurred it would be a safety issue to the students but contained in the building. It would not be considered significant.
SP4520-10-R-0001, SPAIN
NAVSTA ROTA SPCR 17 August 2002
Naval Hospital Rota
The Hospital uses many different types of chemicals and gases. All chemicals are inventoried and kept in binders sorted by departments, and maintained with the Industrial Hygienists and Hospital’s Safety office in Building 36. Any release would be contained within the building and not considered a significant release.
The Hospital has two underground tanks whose spill procedures are covered under site 17 (miscellaneous tanks).
Naval Security Group Activity (NSGA) and Naval Computer and Telecommunications area (NCTAMS)
Building 533 “Bull Ring” (NSGA), Building 8 (NCTAMS) and Building 1851 (SATCOM/NCTAMS) are secured areas that require special clearances for entry.
Operations at NSGA have decreased and for purposes of this plan, neither site is considered a significant spill risk.
All three (3) areas have USTs that supply emergency generators and small above ground tanks for paper furnaces for classified material destruction. (See spill procedures addressed under miscellaneous tank section, Section 3.17.)
LOX Farm
Cryogenic (very cold) liquids of Nitrogen and Oxygen are stored in significant quantity and the LOX farm, located across from the dog kennels. A release of these substances would not be considered significant by definition but could cause some safety or fire fighting concerns as both substances support or enhance combustion. The tanks and operations are maintained by ROICC service contract. All nitrogen and oxygen is issued through CHRIMP.
PCBs (Polychlorinated Biphenyls)
Naval Base Rota is PCB free (i.e., no transformers). Small amounts of PCBs may occur through equipment disassembly/demilitarization at DRMO. Spill procedures addressed under site 12 (DRMO).
NAVSTA ROTA SPCR 18 August 2002
3.1 SITE 1
NEX Gas Station (Building 178)
3.1.1 General Information
Site 1 consists of a gas station and service bay run by the Navy Exchange. It is located across from the corner of Dalmau Street and Second Avenue. Vehicles receive unleaded fuel from four dispenser pumps on two islands in front of the building, and receive diesel and kerosene from two dispenser pumps on the east side of building.
General vehicle maintenance is provided in the service bay. Located on the east side of the building are three USTs and one aboveground tank (AST) that store the fuel for the station. They are fueled approximately once a week from the asphalt fueling area directly in front of the tanks.
3.1.2 Spill Prediction
During normal business hours a significant gasoline spill would be a serious problem (See Worst-Case Scenario in Annex M). The NEX gas station is continuously manned during normal business hours 1000-1730.
Site 1 contains the following spill risks:
• Fuel transfer and dispensing
• Two 10,500-gallon double-walled USTs containing unleaded gasoline, Tanks 178.1 and 178.2. (Figure 3.1.1)
• 6,500-gallon double-walled UST containing diesel fuel, Tank 178.3
• 2,000-gallon double-walled AST containing kerosene fuel
• 1,320-gallon double-walled AST containing used oil and hydraulic fluid
• Four 55-gallon drums containing used oil and hydraulic fluid.
Possible causes of a spill include personnel error during transfer of fuels from tanker truck to USTs and the AST, or while using the dispenser pumps. Spills from both sources would not be contained and would flow across the asphalt onto the surrounding soil. The largest possible spill volume would be the volume of one of the USTs, 10,500 gallons, which should be contained in the double-wall of the tank. If this failed, the fuel would leak directly into the soil.
Spills occurring at the 2,000-gallon AST adjacent to the USTs on the east side of the building would flow over the asphalt paving and into the surrounding soil. A spill here is unlikely; the tank is double-walled and has a containment wall around it.
NAVSTA ROTA SPCR 19 August 2002
Spills occurring with the 1,320-gallon AST and four 55-gallon drums in the station service bay would be contained in the bay and would flow into the floor drain which runs to an Oily Water Separator (OWS) on the west side of the building. The AST is double walled, and a spill from it would be unlikely.
3.1.3 Storage
Gasoline and diesel fuel is stored in three double-walled (steel/fiberglass) USTs equipped with high-level alarms (90%), auto-shutoff alarms (95%), and liquid interstitial detection monitors. The underground fuel piping associated with the USTs is pressurized double-walled plastic piping with line leak detectors. There is an emergency shutoff switch located in the station office.
Kerosene is stored in a double-walled steel AST equipped with a high-level alarm and surrounded by a cinder block containment wall. Used oil and hydraulic fluid is kept in four 55-gallon drums and a pressurized double-walled AST.
There is one OWS located on the west side of the building just outside the service bay.
All drains in the service station run to the OWS.
A Spill kit containing various absorbents is located in the station office.
3.1.4 Transfer
All transfers occur during normal daylight working hours 1000-1730. Fuel deliveries are by 35,000 liter (9200 gallon) tanker truck, typically about twice a week, using a Spanish firm called “Repsol” through a Navy Exchange (NEX) purchase order. No spill provisions are included in the purchase order.
Gasoline and diesel is transferred from tanker trucks to the USTs through covered fill ports that provide secondary containment that drains to the USTs. Fuel is transferred from the USTs to the fuel dispenser pumps through flexible plastic double-walled piping which is pressurized. The monitoring system for the USTs checks fuel level, gross volume, fuel temperature, and water level.
Kerosene is transferred from tanker trucks to the AST through covered fill ports. The fuel dispenser is located directly on the AST, and fuel is transferred through double-walled piping.
Used oil and hydraulic fluid from vehicle maintenance is collected in four 55-gallon drums, which when full are pumped into a 1,320-gallon AST. When the AST is full, a local contractor pumps the used oil out.
SP4420-05-D-0006, SPAIN
SP4420-06-D-0091 Page 23 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 20 August 2002
3.1.5 Containment
All ASTs and USTs are double walled. The kerosene AST has an additional cinder block containment wall surrounding it. All of the 55-gallon drums are located on spill trays.
3.1.6 Drainage Control
Spills and runoff from the asphalt and concrete surface around the ASTs, USTs, and fuel dispensers will flow south and pool along curbing and then out the two entrances of the station into the grassy drainage ditch along Dalmau Street.
3.1.7 Security
There is adequate lighting around the station and fueling dispensers to observe and respond to spills. The gas station is located on a secured fenced-in military base with security 24 hours a day for 365 days a year.
SP4420-06-D-0091 Page 24 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 21 August 2002
3.2 SITE 2
Public Works (Government Vehicles) Gas Station (Building 83)
3.2.1 General Information
Site 2 is located near the corner of Cabrera Street and Fifth Avenue adjacent to the Public Works transportation maintenance compound. The gas station is not manned, fuel is dispersed using an electronic fuel accounting system. Vehicles receive unleaded gasoline and diesel fuel from two dispenser pumps located on a fueling island in front of Building 83. Located directly in front of the building behind the pumps are two USTs that store the fuel for the station.
3.2.2 Spill Prediction
Site 2 contains the following spill risks:
• Two 10,000-gallon double-walled USTs containing unleaded gasoline and diesel fuel, Tanks 83.1 and 83.2. (Figure 3.2.1)
Possible causes of a spill include personnel error during transfer of fuels from a tanker truck to USTs, or while using the dispenser pumps. Spills from both sources would be contained within the concrete bermed fuel dispensing area. The largest possible spill volume would be the volume of one of the USTs, 10,000 gallons, which should be contained in the double wall of the tank. If this failed, the fuel would leak directly into the soil.
3.2.3 Storage
Unleaded gasoline and diesel fuel is stored in two double-walled (steel/plastic) USTs equipped with high-level alarms (90%), auto-shutoff alarms (95%), and vapor interstitial detection monitors. The underground fuel piping associated with the USTs is pressurized double-walled plastic piping with vapor interstitial detection monitors.
Emergency shutoff switches (two total) are located on respective pillars closest to the pumps (one for each pump) and in the station office.
There is one OWS located just north of the USTs. All drains at the bermed fuel dispensing area run to the OWS.
A Spill trailer containing various absorbents is located adjacent to the station office.
3.2.4 Transfer
Unleaded gasoline and diesel fuel is transferred from tanker trucks to the USTs through covered fill ports that provide secondary catchment that drain to the USTs. Fuel is transferred from the USTs to the fuel dispenser pumps through flexible plastic double-
SP4420-06-D-0091 Page 25 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 22 August 2002 walled pressurized piping. The monitoring system for the USTs checks fuel level, gross volume, fuel temperature, and water level.
The Repsol contractor fills the tanks weekly. Daily monitoring is performed by the fuels division.
3.2.5 Containment
Both USTs are double walled. The fuel dispensing area is bermed and has drains running to the OWS. The OWS flows to the sanitary sewers.
3.2.6 Drainage Control
Spills and runoff from the asphalt and concrete surface around the fuel dispensers and USTs would flow to drains and the OWS.
3.2.7 Security
There is adequate lighting around the station and fueling dispensers to observe and respond to spills. There is a lockable gated fence surrounding the gas station. The Service station is under constant surveillance using a video camera that is monitored 24 hours a day at Building 3141 (Fuels Dispatch). The gas station is located on a secured fenced-in military base with security 24 hours a day for 365 days a year.
SP4420-06-D-0091 Page 26 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 23 August 2002
3.3 SITE 3
Hazardous Minimization (HAZMIN) Center (Building 3157)
3.3.1 General Information
Located on Bonifaz Street near the corner of Fourth Avenue, the HAZMIN Center is the central repository of hazardous materials implementing the Naval Supply System’s Consolidated Hazardous Materials Reutilization Inventory Management Program
(CHRIMP).
The center consists of two office trailers, three storage buildings (Buildings 56,144, and 1855), six open air sheds (Buildings 184, 193, 194, 598, 3155 and 3156), eight hazardous material storage lockers and a storage yard. (Figure 3.3.1)
3.3.2 Spill Prediction
Spills most likely would occur during material handling operations (loading, unloading, stocking, issues, etc.). The majority of materials stored are cleaning compounds, paint, paint related materials, adhesives and sealing compounds.
High frequency issues at HAZMIN Center that may cause a significant spill are shown in the table below:
NSN Chemical RQ Equivalent 6810005987316 6810009444129
Sodium Hypochlorite Solution 1000 lbs. 125 gallons
9150001178791 9150001497431 9150001497432 9150001594472 9150009857099 + Several others
Lube Oil Engine Hydraulic Fluid Hydraulic Fluid Lube Oil Lube Oil Aircraft
110 gal. Two 55-gal. Drums
6810002499354 Sulfuric Acid 1000 lbs. 125 gallons
Lower frequency issues, with low reportable quantity (higher toxicity) that may cause a significant spill are shown in the table below (any spill of these materials should be reported):
NSN Chemical RQ Equivalent 6840007823925 Diazonon1 1 lb. 1 pint – or ½ liter 6840008237849 Pyrethin1 1 lb. 1 pint – or ½ liter 6840011222651 Dursban1 1 lb. clorpyrifos 1 pint – or ½ liter 6810011200408 MEK peroxide 10 lbs. 1 gallon 6810009736472 Chloroform 10 lbs. 1 gallon 6810002424770 Calcium Hypochlorite Solid 10 lbs. 1 liter 8030014600246 Alodine 1132 (Chromic Acid) 10 lbs. 1 gallon 1May be stored at HAZMIN -- or Pest Control (Building 1865), see Site 13.
SP4420-06-D-0091 Page 27 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 24 August 2002
3.3.3 Storage
The largest single storage of flammable/combustible material (i.e., fire piles) are listed in the table below:
NSN Material Amount Equivalent 6830014409903 6830014409978 6830014409892
Acetylene Gas Acetylene Gas Acetylene Gas
55 ea. - 40 CF 79 ea. - 10CF 23 ea. - 225CF
Total 245,000 lbs.
N/A Used Oil 2 ea. – 750-gallon tanks
Building 3157
No hazardous materials are stored in these trailers.
Building 1855 (CHRIMP)
This building is the main storage warehouse for new products including paints, thinners, POLs, batteries, varnishes, and various household and office cleaning supplies. Most of the materials are stored in consumer size containers, and no container larger than five gallons was observed. A small section of the south portion is set aside for corrosive materials. A spill kit was observed in this building.
Building 144
This building is presently empty except for a series of shelves and a container of miscellaneous waste and oily rags. A spill kit was observed in this building.
Building 56
This building is used for the consolidation and storage of recyclable waste materials including paints and POLs. A spill kit was observed in this building.
Delivery (loading/unloading) Area
Only temporary storage occurs in this area, and all materials are transferred to their appropriate designated storage areas as soon as possible.
Storage Sheds (Buildings 184, 193, 194, 598, 3155 and 3156)
Storage Sheds 194 and 598 were empty. Shed 184 contained compressed gas cylinders and miscellaneous hazardous waste, including printer cartridges, oily rags, and household items waiting for pickup by DRMO. Shed 193 contained waste paint cans, painting materials, waste adhesives, and drums of waste POLs. Shed 3155 contained empty drums, various compressed gas cylinders, and several bags of sodium
SP4420-06-D-0091 Page 28 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 25 August 2002 chloride. Shed 3156 contained drums of various POLs, including hydraulic and electric oil and several containers of paint.
Hazardous Materials Storage Lockers
Storage Locker 1 was empty; Lockers 2 and 5 contained oxidizing materials; and Lockers 3, 4, 7 and 8 contained miscellaneous flammable materials.
Storage Yard
The storage yard was empty with the exception of two flat racks used to store miscellaneous items, including POLs and other hazardous materials for emergency deployment by the Marine Corps.
3.3.4 Transfer
All materials are delivered and unloaded in the designated area outside of Building 1855. The materials are then segregated and transferred manually or by forklift to an appropriate location within the compound.
The sumps west of Building 1855 are pumped out by a contractor as needed.
3.3.5 Containment
Building 3157
No hazardous materials are stored in these trailers.
Building 1855 (CHRIMP)
Spills occurring in Building 1855 will flow into drains that lead to one of three underground sumps west of the building.
Building 144
No sumps or drains are located in this building. The structure provides a certain measure of containment, and all storage shelves provide spill containment.
Building 56
There are no sumps or drains in this building. The structure provides a certain measure of containment, and most drums and containers are stored on containment pallets.
SP4420-06-D-0091 Page 29 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 26 August 2002
Delivery (loading/unloading) Area
A small collection trench encloses this area and could be used to collect spills or releases; however, the trench is currently filled with gravel and dirt and would be ineffective if a spill was to occur. No containment is currently provided for this area.
Storage Sheds (Buildings 184, 193, 194, 598, 3155 and 3156)
With the exception of Shed 598, which is no longer used, each of the storage sheds is inside a bermed concrete containment area. The berms are provided with manually operated drainage valves, which were open during the site visit.
Hazardous Materials Storage Lockers
Each locker was secured and provides containment for spills or leaks.
Storage Yard
The storage yard was empty with the exception of two flat racks used to store miscellaneous materials, including POLs and other hazardous materials, for emergency deployment by the Marine Corps. These racks were covered with tarps, but no other containment is provided.
3.3.6 Drainage Control
Drainage from the specific buildings and storage sheds is discussed in the above sections. The perimeter of the compound provides no drainage control, and any material reaching the perimeter would flow off site.
3.3.7 Security
The HAZMIN Center is completely enclosed by an 8-ft. chain-link fence that is locked after operating hours. All gate locks are provided a seal to ensure no unauthorized entrance has occurred, and NAVSTA Rota security personnel conduct drive-by patrols at various times throughout the night.
Lighting is provided by lights mounted on top of Buildings 56, 144, and 1855 and is adequate to observe and respond to spills in and around the storage buildings.
SP4420-06-D-0091 Page 30 of 76 ATTACHMENT 11A
NAVSTA ROTA SPCR 27 August 2002
3.4 SITE 4
Aviation Fuels and JP-8 Load Rack
3.4.1 General Information
The Aviation Fuels Branch is responsible for fueling all aircraft and for filling certain ASTs located at NAVSTA Rota. Aircraft are fueled by tanker trucks filled at the JP-8 loading rack or fueled directly from five (5) fueling ports located on the flightline using pantographs.
Historically, the JP-8 loading rack is the site of the largest land spills at NAVSTA Rota.
A 2000-gallon spill occurred in January 2000 (personnel error), and a 5000-gallon spill…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .