Attachment 2 - Price Schedule V2.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- SP451026Q0001
- Issued by
-
Defense Logistics Agency
About this file
This is a Price Schedule for a Material Handling Equipment (MHE) maintenance services contract for the DLA Disposition Services Mid-America Region. The price schedule outlines costs for a Firm Fixed Priced, Time and Material Indefinite Delivery Indefinite Quantity (IDIQ) contract structure consisting of one 12-month base period plus two 12-month option periods, with a total contract value of $270,000.
The schedule itemizes preventive maintenance services for various equipment types including electric forklifts (3-4k capacity), standard forklifts (ranging from 3-4k to 50-59k capacity), front-end loaders, warehouse tractors, utility task vehicles, warehouse sweepers, lawn mowers, and medium excavators. Most preventive maintenance line items are priced at $0.00 and reflect quantities needed annually (e.g., 36 electric forklifts, 18 standard 3-4k forklifts, 34 forklifts rated 5-10k). The base period and each option period total $90,000, representing $30,000 per year for repair/replacement parts (ROM 90,000 units at $1.00 each) while labor for unscheduled repairs and corrective maintenance is listed at $0.00. The cost structure is identical across the base period and both option periods, with no escalation indicated. This solicitation is set aside 100% for Small Business under NAICS code 811310.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Equipment List V2.xlsx | XLSX spreadsheet | |
| Attachment 11 - Questions and Answers.docx | DOCX document | |
| Attachment 8 - Wage Determination Hood.pdf | ||
| Attachment 2 - Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment 7 - Wage Determination San Antonio.pdf | ||
| Attachment 10 - MA Locations.pdf | ||
| Attachment 6 - Wage Determination Sill.pdf | ||
| Attachment 4 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 1 - PWS.docx | DOCX document | |
| Attachment 5 - Wage Determination - Colorado.pdf | ||
| Attachment 3 - Equipment List.xlsx | XLSX spreadsheet | |
| Attachment 9 - Wage Determination Riley.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
Price Schedule for Mid-America Region MHE Service Contract
| CLIN | BASE Period - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 0001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 36 | $0.00 | $0.00 |
| 0002 | Preventive Maintenance: Forklift, 3-4k | EA | 18 | $0.00 | $0.00 |
| 0003 | Preventive Maintenance: Forklift, 5-10k | EA | 34 | $0.00 | $0.00 |
| 0004 | Preventive Maintenance: Forklift, 12-19k | EA | 12 | $0.00 | $0.00 |
| 0005 | Preventive Maintenance: Forklift, 20-29k | EA | 4 | $0.00 | $0.00 |
| 0006 | Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | $0.00 |
| 0007 | Preventive Maintenance: Forklift, 50-59k | EA | 4 | $0.00 | $0.00 |
| 0008 | Preventive Maintenance: Front End Loader | EA | 14 | $0.00 | $0.00 |
| 0009 | Preventive Maintenance: Tractor, Warehouse | EA | 4 | $0.00 | $0.00 |
| 0010 | Preventive Maintenance: Utility Task Vehicle | EA | 18 | $0.00 | $0.00 |
| 0011 | Preventive Maintenance: Warehouse Sweeper | EA | 7 | $0.00 | $0.00 |
| 0012 | Preventive Maintenance: Lawn Mower, Metered-Powered | EA | 2 | $0.00 | $0.00 |
| 0013 | Preventive Maintenance: Excavator, Medium | EA | 2 | $0.00 | $0.00 |
| 0014 | Repair/Replacement Parts | ROM - UN | 90000 | $1.00 | $90,000.00 |
| 0015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 360 | $0.00 | $0.00 |
| Base Total | $90,000.00 |
| CLIN | OPTION 1 - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 1001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 36 | $0.00 | $0.00 |
| 1002 | Preventive Maintenance: Forklift, 3-4k | EA | 18 | $0.00 | $0.00 |
| 1003 | Preventive Maintenance: Forklift, 5-10k | EA | 34 | $0.00 | $0.00 |
| 1004 | Preventive Maintenance: Forklift, 12-19k | EA | 12 | $0.00 | $0.00 |
| 1005 | Preventive Maintenance: Forklift, 20-29k | EA | 4 | $0.00 | $0.00 |
| 1006 | Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | $0.00 |
| 1007 | Preventive Maintenance: Forklift, 50-59k | EA | 4 | $0.00 | $0.00 |
| 1008 | Preventive Maintenance: Front End Loader | EA | 14 | $0.00 | $0.00 |
| 1009 | Preventive Maintenance: Tractor, Warehouse | EA | 4 | $0.00 | $0.00 |
| 1010 | Preventive Maintenance: Utility Task Vehicle | EA | 18 | $0.00 | $0.00 |
| 1011 | Preventive Maintenance: Warehouse Sweeper | EA | 7 | $0.00 | $0.00 |
| 1012 | Preventive Maintenance: Lawn Mower, Metered-Powered | EA | 2 | $0.00 | $0.00 |
| 1013 | Preventive Maintenance: Excavator, Medium | EA | 2 | $0.00 | $0.00 |
| 1014 | Repair/Replacement Parts | ROM - UN | 90000 | $1.00 | $90,000.00 |
| 1015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 360 | $0.00 | $0.00 |
| Option 1 Total | $90,000.00 |
| CLIN | OPTION 3 - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 2001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 36 | $0.00 | $0.00 |
| 2002 | Preventive Maintenance: Forklift, 3-4k | EA | 18 | $0.00 | $0.00 |
| 2003 | Preventive Maintenance: Forklift, 5-10k | EA | 34 | $0.00 | $0.00 |
| 2004 | Preventive Maintenance: Forklift, 12-19k | EA | 12 | $0.00 | $0.00 |
| 2005 | Preventive Maintenance: Forklift, 20-29k | EA | 4 | $0.00 | $0.00 |
| 2006 | Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | $0.00 |
| 2007 | Preventive Maintenance: Forklift, 50-59k | EA | 4 | $0.00 | $0.00 |
| 2008 | Preventive Maintenance: Front End Loader | EA | 14 | $0.00 | $0.00 |
| 2009 | Preventive Maintenance: Tractor, Warehouse | EA | 4 | $0.00 | $0.00 |
| 2010 | Preventive Maintenance: Utility Task Vehicle | EA | 18 | $0.00 | $0.00 |
| 2011 | Preventive Maintenance: Warehouse Sweeper | EA | 7 | $0.00 | $0.00 |
| 2012 | Preventive Maintenance: Lawn Mower, Metered-Powered | EA | 2 | $0.00 | $0.00 |
| 2013 | Preventive Maintenance: Excavator, Medium | EA | 2 | $0.00 | $0.00 |
| 2014 | Repair/Replacement Parts | ROM - UN | 90000 | $1.00 | $90,000.00 |
| 2015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 360 | $0.00 | $0.00 |
| Option 2 Total | $90,000.00 | ||||
| TOTAL WITH ALL OPTIONS | $270,000.00 |
&"-,Bold"&14FOR OFFICIAL USE ONLY&"-,Regular"&11
PROCUREMENT SENSITIVE - SOURCE SELECTION INFORMATION
File details come from the government source that posted it. Updated .