Attachment 2 - Price Schedule.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- SP451026Q0001
- Issued by
-
Defense Logistics Agency
About this file
The file is a Price Schedule for a Material Handling Equipment (MHE) Service Contract for the DLA Disposition Services Mid-America Region. The document outlines a comprehensive pricing structure with a base period and two option periods, each lasting 12 months, with a total contract value of $270,000. The pricing schedule includes detailed line items for preventive maintenance across multiple equipment types such as electric forklifts (various weight classes), front end loaders, warehouse tractors, utility vehicles, warehouse sweepers, scooters, and excavators.
The contract is set aside 100% for small businesses under NAICS code 811310 with a size standard of $12,500,000. Key pricing components include $0 rates for most preventive maintenance services, $1 per unit for repair/replacement parts (totaling $90,000 per period), and labor for unscheduled repairs priced at $0. The solicitation is issued by the Defense Logistics Agency (DLA) Disposition Services, which manages DoD surplus property, and will result in a Firm Fixed Price, Time and Material Indefinite Delivery Indefinite Quantity (IDIQ) contract with a total performance period not exceeding three years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Equipment List V2.xlsx | XLSX spreadsheet | |
| Attachment 2 - Price Schedule V2.xlsx | XLSX spreadsheet | |
| Attachment 11 - Questions and Answers.docx | DOCX document | |
| Attachment 8 - Wage Determination Hood.pdf | ||
| Attachment 7 - Wage Determination San Antonio.pdf | ||
| Attachment 10 - MA Locations.pdf | ||
| Attachment 6 - Wage Determination Sill.pdf | ||
| Attachment 4 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 1 - PWS.docx | DOCX document | |
| Attachment 5 - Wage Determination - Colorado.pdf | ||
| Attachment 3 - Equipment List.xlsx | XLSX spreadsheet | |
| Attachment 9 - Wage Determination Riley.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
Price Schedule for Mid-America Region MHE Service Contract
| CLIN | BASE Period - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 0001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 24 | $0.00 | $0.00 |
| 0002 | Preventive Maintenance: Forklift, 3-4k | EA | 18 | $0.00 | $0.00 |
| 0003 | Preventive Maintenance: Forklift, 5-10k | EA | 32 | $0.00 | $0.00 |
| 0004 | Preventive Maintenance: Forklift, 12-19k | EA | 12 | $0.00 | $0.00 |
| 0005 | Preventive Maintenance: Forklift, 20-29k | EA | 4 | $0.00 | $0.00 |
| 0006 | Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | $0.00 |
| 0007 | Preventive Maintenance: Forklift, 50-59k | EA | 4 | $0.00 | $0.00 |
| 0008 | Preventive Maintenance: Front End Loader | EA | 18 | $0.00 | $0.00 |
| 0009 | Preventive Maintenance: Tractor, Warehouse | EA | 4 | $0.00 | $0.00 |
| 0010 | Preventive Maintenance: Utility Task Vehicle | EA | 18 | $0.00 | $0.00 |
| 0011 | Preventive Maintenance: Warehouse Sweeper | EA | 10 | $0.00 | $0.00 |
| 0012 | Preventive Maintenance: Scooter, 3 or 4 Wheel | EA | 2 | $0.00 | $0.00 |
| 0013 | Preventive Maintenance: Excavator, Medium | EA | 2 | $0.00 | $0.00 |
| 0014 | Repair/Replacement Parts | ROM - UN | 90000 | $1.00 | $90,000.00 |
| 0015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 360 | $0.00 | $0.00 |
| Base Total | $90,000.00 |
| CLIN | OPTION 1 - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 1001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 24 | $0.00 | $0.00 |
| 1002 | Preventive Maintenance: Forklift, 3-4k | EA | 18 | $0.00 | $0.00 |
| 1003 | Preventive Maintenance: Forklift, 5-10k | EA | 32 | $0.00 | $0.00 |
| 1004 | Preventive Maintenance: Forklift, 12-19k | EA | 12 | $0.00 | $0.00 |
| 1005 | Preventive Maintenance: Forklift, 20-29k | EA | 4 | $0.00 | $0.00 |
| 1006 | Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | $0.00 |
| 1007 | Preventive Maintenance: Forklift, 50-59k | EA | 4 | $0.00 | $0.00 |
| 1008 | Preventive Maintenance: Front End Loader | EA | 18 | $0.00 | $0.00 |
| 1009 | Preventive Maintenance: Tractor, Warehouse | EA | 4 | $0.00 | $0.00 |
| 1010 | Preventive Maintenance: Utility Task Vehicle | EA | 18 | $0.00 | $0.00 |
| 1011 | Preventive Maintenance: Warehouse Sweeper | EA | 10 | $0.00 | $0.00 |
| 1012 | Preventive Maintenance: Scooter, 3 or 4 Wheel | EA | 2 | $0.00 | $0.00 |
| 1013 | Preventive Maintenance: Excavator, Medium | EA | 2 | $0.00 | $0.00 |
| 1014 | Repair/Replacement Parts | ROM - UN | 90000 | $1.00 | $90,000.00 |
| 1015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 360 | $0.00 | $0.00 |
| Option 1 Total | $90,000.00 |
| CLIN | OPTION 3 - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 2001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 24 | $0.00 | $0.00 |
| 2002 | Preventive Maintenance: Forklift, 3-4k | EA | 18 | $0.00 | $0.00 |
| 2003 | Preventive Maintenance: Forklift, 5-10k | EA | 32 | $0.00 | $0.00 |
| 2004 | Preventive Maintenance: Forklift, 12-19k | EA | 12 | $0.00 | $0.00 |
| 2005 | Preventive Maintenance: Forklift, 20-29k | EA | 4 | $0.00 | $0.00 |
| 2006 | Preventive Maintenance: Forklift, 30-39k | EA | 3 | $0.00 | $0.00 |
| 2007 | Preventive Maintenance: Forklift, 50-59k | EA | 4 | $0.00 | $0.00 |
| 2008 | Preventive Maintenance: Front End Loader | EA | 18 | $0.00 | $0.00 |
| 2009 | Preventive Maintenance: Tractor, Warehouse | EA | 4 | $0.00 | $0.00 |
| 2010 | Preventive Maintenance: Utility Task Vehicle | EA | 18 | $0.00 | $0.00 |
| 2011 | Preventive Maintenance: Warehouse Sweeper | EA | 10 | $0.00 | $0.00 |
| 2012 | Preventive Maintenance: Scooter, 3 or 4 Wheel | EA | 2 | $0.00 | $0.00 |
| 2013 | Preventive Maintenance: Excavator, Medium | EA | 2 | $0.00 | $0.00 |
| 2014 | Repair/Replacement Parts | ROM - UN | 90000 | $1.00 | $90,000.00 |
| 2015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 360 | $0.00 | $0.00 |
| Option 2 Total | $90,000.00 | ||||
| TOTAL WITH ALL OPTIONS | $270,000.00 |
&"-,Bold"&14FOR OFFICIAL USE ONLY&"-,Regular"&11
PROCUREMENT SENSITIVE - SOURCE SELECTION INFORMATION
File details come from the government source that posted it. Updated .