Updated Aviano Warehouse Cleaning PWS.docx

DOCX document 40 KB Posted

Attached to
DLA Disposition Services Aviano Warehouse Cleaning Federal contract opportunity
Solicitation number
SP451025Q1032
Issued by
Defense Logistics Agency

About this file

This Performance Work Statement (PWS) details warehouse custodial services for the Defense Logistics Agency (DLA) Disposition Services at Aviano Air Base in Italy. The contract is a firm-fixed price requirement for comprehensive warehouse cleaning services to be performed twice annually, with a total contract period of one 12-month base period and two 12-month option periods not exceeding three years. The cleaning services encompass 1,979.77 square meters of concrete floors, 2,415.70 square meters of interior wall surfaces, five portable offices, two stairways, overhead HVAC ductwork, and eight rows of storage racks, with specific cleaning requirements including wet mopping, dusting, wiping, and proper waste separation according to Italian/EU/US environmental regulations.

The solicitation (SP451025Q1032) is a full and open competition under NAICS code 561720, with quotes due by May 26, 2025, at 3:00 PM EST. Quotes must be emailed to two specified DLA contacts, and the evaluation will be conducted on a Lowest-Priced Technically Acceptable basis. Contractors must provide all management, tools, equipment, cleaning materials, and labor necessary to ensure a clean, professional warehouse appearance. The work will be performed at DLA Disposition Services Aviano Air Base, Building 1459, in Castello d'Aviano, Italy, during normal business hours, excluding US and Italian federal holidays.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Disposition Services Aviano Warehouse Cleaning, newest first.
File Type Posted
Questions and Answers.docx DOCX document
Price Schedule Aviano Warehouse Cleaning.xlsx XLSX spreadsheet
PWS Aviano Warehouse Cleaning.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

DEFENSE LOGISTICS AGENCY (DLA)

DISPOSITION SERVICES (DS)

AVIANO WAREHOUSE CLEANING

TABLE OF CONTENTS

1. INTRODUCTION

2. CLIN 0001 – WAREHOUSE CUSTODIAL SERVICES

3. PLACE OF PERFORMANCE

4. UNITED STATES AND ITALY FEDERAL HOLIDAYS

5. BASE/SITE ACCESS AND SECURITY

6. GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT, SERVICES (GFP/M/E/S)

7. CONTRACTOR FURNISHED PROPERTY, MATERIALS, AND EQUIPMENT (CFP/M/E)

8. ACCEPTABLE PERFORMANCE LEVELS (APLs)

9. SPILL RESPONSIBILITY

10. POINTS OF CONTACT (POC)

11. INVOICING INFORMATION

1. INTRODUCTION:

a. The Defense Logistics Agency (DLA) Disposition Services (DS) is a Major Subordinate Command (MSC) of the Defense Logistics Agency (DLA) with the responsibility of disposing and reutilizing the United States Government’s (USG) Department of Defense (DoD) excess and surplus property generated by the military services. This is accomplished through reutilization to other DoD activities, transfer to other Federal agencies, donation to authorized state and local organizations, sale to the public, or ultimate disposal through abandonment or destruction. The headquarters for DLA DS is in Battle Creek, Michigan. DLA DS Aviano, Italy requires Warehouse Custodial Services.

b. This requirement is for Warehouse Custodial Services to be performed at the DLA DS Aviano site and shall be completed two (2) times per year. The performance requirements are established in Section 2 of this PWS. Once work has begun, the Contractor shall have a period of ten (10) business days to complete all tasks referred to in Section 2 of this PWS.

c. This is a Firm-Fixed Price (FFP) contract, the first Warehouse Cleaning must be conducted 30 business days after award. The contract period of performance starts from the “award/effective date” as reflected in block three (3) of the SF1449. The Contracting Officer (KO) may extend the Warehouse Cleaning period for extenuating circumstances. Two (2) business days prior to the end of the scheduled Warehouse Cleaning, a written request for extension must be received from the Contractor detailing the circumstances that delayed delivery of service. Such written notifications will include the subject contract number, reason(s) for the delay with supporting substantiated actionable documentation, as applicable, and the estimated date and time for completed performance.

d. The contract consists of a period of performance of one (1) 12-month base period and two (2) 12-month option period and shall not exceed three (3) years.

e. Upon coordination with the USG Point of Contact (POC) of Warehouse Cleaning services, the Contractor shall be required to report to the DLA DS location main office, each day to sign in prior to conducting any services under this contract.

f. Any reference to Contractor throughout this PWS refers to the Contractor or Subcontractor should one be utilized. The Contractor is solely responsible for all associated work to be completed In Accordance With (IAW) the PWS.

2. CLIN 0001 – WAREHOUSE CUSTODIAL SERVICES:

The Contractor shall:

a. Provide all management, tools, equipment, cleaning materials, and labor necessary to ensure that Warehouse Custodial Services are performed at DLA DS Aviano resulting in a clean, neat, and professional appearance. The areas are to be free of dust, debris, standing water, dirt, food residue, animal feces, and any other foreign soiling materials.

b. Warehouse concrete floors: A total of 1979.77 total square meters by moving items that are easily moveable such as pallets, wheeled and powered equipment to gain access to areas to be cleaned. The Contractor is not responsible for moving larger items and the Government POC will operate USG equipment for the Contractor to gain access to the concrete floors to be cleaned.

Concrete floors shall be wet mopped, and the contractor shall ensure there is no standing water or other cleaning waste remaining on floor surfaces and ensure all cleaning materials and supplies are picked up after cleaning.

c. Interior perimeter walls, windows, connections, and dock boxes: A total of 2415.70 square meters of interior wall surfaces to be wiped down and cleaned with a max height of required cleaning is 6.6 meters high to include surfaces within the doors, garage doors, connection between dock boxes, exposed ducts, levers, and beams.

d. Portable office exterior walls and windows: Five (5) portable offices within the warehouse with the highest point of seven (7) meters high must be dusted, wiped down and/or cleaned.

e. Portable Office Roofs: Five (5) portable offices within the warehouse with the highest point of seven (7) meters high. Portable office roofs must be dusted, wiped down, and/or cleaned.

f. Stairways: Two (2) stairways that have 16 steps on each side of the double-decker portable office. Both stairs are 1.35 meters wide and 6.6 meters long. Stairs must be swept and/or wet mopped.

g. Overhead HVAC Cleaning: HVAC duct is located seven (7) meters from the floor with 58.5 linear meters of ductwork. Cleaning the interior of ducts and conducts is excluded from the required cleaning of the HVAC system. HVAC duct must be dusted, wiped down, and/or cleaned.

h. Storage Racks: The Government POC shall assist in the removal of inventory and pallets on the shelves for access for cleaning requirements as necessary. There are eight (8) rows of metal racks with up to four (4) shelves per rack with the tallest being six (6) meters high. Storage racks must be dusted, wiped down, and/or cleaned.

i. The waste collected or generated shall be disposed of in the existing bulk containers on site. However, the trash is required to be separated into plastic, paper/cardboard and dry waste according to Italian/EU/US environmental regulations. Please work with the COR for waste disposal instructions.

3. PLACE OF PERFORMANCE:

a. The Contractor shall perform all services on USG premises located at DLA DS Aviano Air Base, Castello d’Aviano PN, Italy, Building 1459.

Address of Performance:

DLA DISP SVCS BASE MILITARE AVIANO

AREA F EDIFICIO 1459

AEROPORTO BASE AVIANO

AVIANO PORDENONE , 33080

b. During normal business hours (0700-1600), except on recognized United States and Italy holidays (See section 4) or when the USG facility/installation is closed due to local or national emergencies, administrative closing, or similar USG directed facility/installation closings.

c. The Contractor shall always maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the USG facility/installation is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential.

4. UNITED STATES AND ITALY FEDERAL HOLIDAYS:

a. The Contractor is not required to provide services on the 11 United States (US) and 11 Italy Federal Holidays observed unless approved by the KO. When the legal holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When the legal holiday falls on a Saturday, the preceding Friday is observed as the holiday. The following holidays are observed:

United States Observed Federal Holidays:

New Year’s Day
January 1st
Martin Luther King’s Birthday
Third Monday in January
President’s Day
Third Monday in February
Memorial Day
Last Monday in May
Juneteenth
June 19th
Independence Day
July 4th
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veteran’s Day
November 11th
Thanksgiving Day
Fourth Thursday in November
Christmas Day
December 25th

Italy Observed Federal Holidays:

Epiphany
January 6th
Pasquetta
Monday after Easter
Aviano Patron Saint Day
April 12th
Liberation Day
April 25th
Italian Labor Day
May 1st
Republic Day
June 2nd
Assumption Day
August 15th
All Saint’s Day
November 1st
National Unity Day
November 4th
Immaculate Conception Day
December 8th
St. Stephen’s Day
December 26th

5. BASE/SITE ACCESS AND SECURITY:

a. The Contractor shall coordinate with DLA DS Aviano POC, for base installation access for all their employees. The Contractor shall be familiar with and comply with all Base Command policies regarding security considerations for all Contractor employees.

b. Unscheduled gate closures by the installation security personnel may occur at any time causing all personnel entering or exiting a closed installation to experience a delay; this cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by Contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the Contractor employee’s installation driving privileges.

c. Contractor employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All Contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The Contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The USG reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of Contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

d. The Contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the POC. Contractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation security personnel. The Contractor shall ensure compliance with all personal identity verification requirements as directed by DoD and/or local policy. Should the Force Protection Condition (FPCON) change, the USG may require changes in Contractor security matters or processes.

e. All work performed by the contractor shall be performed in accordance with all applicable laws, regulations, DLA standards, instructions, and commercial practices.

6. GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT, SERVICES (GFP/M/E/S):

The USG will provide the GFP/M/E/S listed below solely for the purpose of performance under this contract:

a. Property: The USG will furnish the necessary workspace for the Contractor to perform the services as outlined in this PWS.

b. Materials: No materials will be provided by the USG.

c. Equipment: The USG will, at its sole discretion, and upon approval of the POC, provide a licensed MHE operator with appropriate MHE to the Contractor to assist with moving items and/or equipment in the performance of this contract.

d. USG Furnished Utilities: Services: The Government will furnish electricity, water and sewage service as necessary for the accomplishment of work in accordance with this contract. The Contract shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amounts.

7. CONTRACTOR FURNISHED PROPERTY, MATERIALS, AND EQUIPMENT (CFP/M/E):

The Contractor shall provide the CFP/M/E listed below solely for the purpose of performance under this contract:

a. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicle and be maintained to present a neat, professional appearance.

b. Provide all Personal Protective Equipment (PPE) for employees IAW Occupational Safety and Health Administration (OSHA) guidance.

c. Provide all materials to clean up spills caused by their employees during the performance of this contract.

d. Provide the KO and POC with a Point of Contact and phone number to coordinate and schedule the Warehouse Cleaning.

e. All equipment used in the performance of this contract shall be in good operable condition and carry an Underwriters Laboratory (U/L) listing. Equipment found to be unsafe and unable to function as designed, shall not be used in performance of this contract. The POC may inspect the Contractor’s equipment and vehicles at any time and direct the removal of any unsafe or unusable equipment or vehicle from the installation.

8. ACCEPTABLE PERFORMANCE LEVELS (APLs):

a. APLs are the minimum performance levels of specific requirements which the Contractor must achieve or risk having the government consider performance unsatisfactory, which may result in monetary or other consideration from the Contractor.

b. If performance falls below the specified performance level, consideration may be taken at the USG’s discretion. Decisions will consider the impact on the USG because of the failure to meet the performance requirement and the number of times the failure has occurred throughout the contract period.

c. Performance incentives for the Contractor will include, but are not necessarily limited to, favorable impact on option exercise decisions, future awards of the same requirement, and future awards of similar requirements by DLA DS as well as other government and non-government entities that may review performance of this contract.

DELIVERABLE
STANDARD
TIMEFRAME
SECTION
ACCEPTABLE PERFORMANCE LEVEL (APL)
METHOD OF SURVEILLANCE
Complete Warehouse Cleaning
As determined by the POC IAW PWS section 2.
10 Business days upon start of Warehouse Cleaning
1.b. & 2.
No failures during each period of performance
POC
Sign in on visitor log
Sign Visitor log upon arrival for any service
Prior to commencing services on a scheduled day
1.e.
No Failures during each period of performance
POC
Complete Warehouse Cleaning of specified areas
Clean areas specified identified in the PWS 2.b. through 2.h.
10 Business days upon start of Warehouse Cleaning
2.
No failures during each period of performance
POC

9. SPILL RESPONSIBILITY:

The Contractor is solely responsible for all spills or leaks during the performance of this contract, which occurs because of, or is contributed to by the actions of its agents, employees, or subcontractors. The Contractor shall clean up such spills or leaks to the satisfaction of the USG in a manner that complies with applicable Federal, state, and local laws and regulations. The clean-up shall be at no cost to the USG. The Contractor shall report all such spills or leaks, regardless of their quantity, to the POC and KO immediately upon discovery. A written follow-up report shall be submitted to the POC and KO not later than twenty-four hours after the initial telephonic report. The written report shall be in narrative form, and at a minimum shall include the following:

1) Description of item spilled (including identity, quantity)

2) Whether amount spilled is EPA or state reportable, and if so, whether it was reported.

3) Exact time and location of spill including a description of the area involved

4) Containment procedures initiated

5) Summary of any communications Contractor has with press or USG officials other than the KO

6) Description of clean-up procedures employed or to be employed at the site including disposal location of spill residue

7) Description of item spilled (including identity, quantity)

10. POINT OF CONTACT (POC):

The POC will be provided by the KO upon receipt of the award or option modification as personnel changes occur throughout the duration of the contract.

11. INVOICING INFORMATION:

The Contractor shall invoice through the DOD WAWF system. Invoices must be submitted through WAWF in accordance with DFARS 252.232-7003. Refer to https://wawf.eb.mil for additional information.

File details come from the government source that posted it. Updated .