10. KTR Work Surveillance Checklist - Placement or Removal Empty ROB or Vac Box.pdf

PDF 45 KB Posted

Attached to
Anniston Hazardous Waste Removal Federal contract opportunity
Solicitation number
SP450025R0008
Issued by
Defense Logistics Agency

About this file

The document is a Contractor Work Surveillance Checklist for the placement or removal of empty Rolloff Boxes (ROB) or Vacuum Boxes. The checklist is designed for a government representative to comprehensively evaluate and document the contractor's performance during container delivery and setup. Key evaluation points include verifying the contractor's arrival time, equipment readiness (appropriate container size, plastic liner, watertight tarp cover), container condition, weight ticket, site inspection, equipment functionality, and overall work safety. The form requires the government representative to mark "Yes," "No," or "N/A" for each criteria and provides space for additional comments and the representative's signature and date.

View the file

Other files for this federal contract opportunity

Other files attached to Anniston Hazardous Waste Removal, newest first.
File Type Posted
SP450025R0008 Anniston Question 3.docx DOCX document
SP450025R0008 Anniston Question 4.docx DOCX document
Question 2 for SP450025R0008 Anniston Hazardous.docx DOCX document
20D0021 ORDER REPORT.xlsx XLSX spreadsheet
Offeror Question.docx DOCX document
7. Ordering history.xlsx XLSX spreadsheet
11. CAC Application Process- Anniston Renewal- PR 25-BE-017.pdf PDF
9. KTR Work Surveillance Checklist- Anniston Renewal- PR 25-BE-017.pdf PDF
6. PPI Questionnaire_02132025.pdf PDF
8. Wage+Determination.pdf PDF
12. Provision Fill-ins.pdf PDF
4. Addenda to 52.212‐1 Instructions Template_Final.docx DOCX document
3. Anniston Pickup-Service Locations v11-21-2024-PR25-BE-017.xlsx XLSX spreadsheet
5. Addenda to 52.212‐2 Evaluation.docx DOCX document
1. Anniston Renewal -Price Schedule - PR# 25-BE-017.xlsx XLSX spreadsheet
2. Anniston Renewal -PWS- PR-25-BE-017 .docx DOCX document
Clause - CONUS SB Set-Aside.docx DOCX document
Combo Notice Description docx.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Work Surveillance Checklist

Placement or Removal of Empty Rented Rolloff Box (ROB) or Vacuum Box

Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________

Contract Number: SP4500-______-D-___________ TO #: ________________ CLIN: ______________

Name of Designated Government Representative: ___________________________________________

Title of Designated Government Representative: ____________________________________________

Phone Number of Designated Government Representative: (______) _______-___________ Ext.______

Yes No N/A Description of Contractor Work Surveillance: [ROB] or [Vac Box] (Circle one)

Did the Contractor arrive on site at the scheduled time and date?

Did the Contractor arrive on site with all of the requisite equipment, including

- One ROB or Vacuum Box container of the appropriately ordered size, with

- One plastic liner of sufficient size and thickness to adequately contain the waste for which it was intended (ROB only), and

- One watertight tarp cover that was generally free of rips and tears (ROB only)?

Does the Contractor have an approved weight ticket showing the empty (tare) weight of the container?

Was the container inspected by a Designated Government Representative upon arrival at the designated location?

Was the container of acceptable appearance and integrity, with minimal evidence of corrosion, visibly void of waste residue and legible/offensive graffiti upon delivery?

Was the ROB, bows and cover free of any defects or damage, other than those attributable to normal wear and tear, and determined acceptable for Government use? Please document below any noteworthy defects or damage and have driver initial for acknowledgment.

Note: Failure of the driver to acknowledge any existing noteworthy defects or damage will be cause for rejection of the ROB and liner.

Did the equipment operate properly without causing a delay in work?

Was the work performed safely and did the equipment meet the satisfaction of the Designated Government Representative?

Comments:

Signature of Designated Government Representative Date