Attachment_03_PWS.pdf

PDF 286 KB Posted

Attached to
Scrap Disposal - Japan Federal contract opportunity
Solicitation number
SP4500-19-R-0016
Issued by
Defense Logistics Agency Disposition Services

About this file

Attachment 3 Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Scrap Disposal - Japan, newest first.
File Type Posted
Attachment_01_Schedule_of_Prices_Amendment_6.xlsx XLSX spreadsheet
SF30_SP450019R00160006.pdf PDF
Attachment_17_Off-site_DEMIL_Plan_Template.docx DOCX document
FCS_history.xlsx XLSX spreadsheet
SF30_SP450019R00160005.pdf PDF
SSI-MAY19-marked.pdf PDF
SF30_SP450019R00160004.pdf PDF
DEMIL_PROPERTY.jpg JPG image
Attachment_01_Schedule_of_Prices_Amendment_3.xlsx XLSX spreadsheet
SF30_SP450019R00160003.pdf PDF
SF30_SP450019R00160002.pdf PDF
SF30_SP450019R00160001.pdf PDF
Attachment_09_DLA_Form_1822.docx DOCX document
Attachment_08_DLA_Form_2505.docx DOCX document
Attachment_01_Schedule_of_Prices.xlsx XLSX spreadsheet
Attachment_09A_Instr_DLA_Form_1822.docx DOCX document
Attachments_list.docx DOCX document
Attachment_11_FCS.docx DOCX document
Attachment_06_Wrkld_Hist.docx DOCX document
Attachment_14_Trans_Profile_Sht.docx DOCX document
Attachment_13_Fac_Profile_Sht.docx DOCX document
SF1449_SP450019R0016.pdf PDF
Attachment_02_Definitions.docx DOCX document
Attachment_05_DLA_DS_Inv_SnpSht.docx DOCX document
Attachment_15_DD_Form_1155.docx DOCX document
Att_16_PPI_Questionnaire_-_Scrap.pdf PDF
Attachment_12_APLs.docx DOCX document
Attachment_10_Avail_Dual-Use_MHE.pdf PDF
Attachment_04_DLA_DS_Op_Hrs.docx DOCX document
Attachment_07_DLA_Form_1367.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP4500-19-R-0016

Attachment 3

[Type here]

PERFORMANCE WORK STATEMENT

TABLE OF CONTENTS

1.0 GENERAL INFORMATION

1.1 GENERAL

1.2 STATEMENT OF SERVICES

1.3 CONTRACT INFORMATION

1.4 CLIN FORMAT AND COMPENSATION OF SERVICES

1.5 CONTRACTOR RESPONSIBILITIES

1.6 LICENSES AND/OR PERMITS

1.7 SPECIAL REQUIREMENTS

1.8 REPORTS

1.8.1 REQUIRED INFORMATION

1.9 CONTRACTOR IDENTIFICATION

2.0 MANAGEMENT OF COLLECTION POINTS

2.1 REMOVAL OF CURRENT INVENTORIES

2.2 DESIGN / ORGANIZE/SET UP

2.3 FORWARD COLLECTION SITES

3.0 CONTAINER MANAGEMENT

3.1 DROP OFF, PICKUP, AND LOADING

3.2 WEIGHING

3.3 REMOVAL

3.4 TRANSPORTATION

3.5 SPILL RESPONSIBILITIES

3.5.1 SPILL REPORTING REQUIREMENTS

3.5.2 SPILL REPORT

4.0 RECYCLING AND DISPOSAL

4.1 RECYCLING

4.2 DISPOSAL

5.0 COMPLIANCE WITH LAWS

5.1 COMPLIANCE TERMS AND CONDITIONS

6.0 CUSTOMS

6.1 CUSTOMS DUTY TAX AND CLEARANCES

7.0 DEMILITARIZATION (DEMIL) / MUTILATION (MUT) / DEMANUFACTURING

(DEMAN)

7.1 CLINs 0043_B, 1043_B, 2043_B AND 0044_D, 1044_D, 2044_D

7.2 OFF SITE DEMIL / MUT / DEMAN PLANS

7.2.1 WEIGHING OF DEMIL / MUT / DEMAN REQUIRED ITEMS

7.3 TRANSPORTATION OF DEMIL / MUT / DEMAN REQUIRED PROPERTY

8.0 REQUIRED REPORTS

8.1 ACCOUNTING

8.2 COLLECTION REPORTS

8.2.1 MONTHLY REPORTS

8.2.2 SEMI-ANNUAL REPORT

8.3 MANIFESTING

8.3.1 MANIFEST TRACKING LOG

8.3.2 HM / HW REPORT

8.4 TRADE SECURITY CONTROL CLEARANCE (TSCC)

8.4.1 DEMIL CODE CHANGE NOTICES

8.5 CONTRACTOR MANPOWER REPORTING

9.0 SAFETY REQUIREMENTS

9.1 SAFETY AND HEALTH PRECAUTIONS

9.2 VOLUNTARY PROTECTION PROGRAM (VPP)

10.0 WEATHER

10.1 ADVERSE WEATHER

11.0 OBLITERATION OF DOD MARKINGS

11.1 REMOVAL OF DoD MARKINGS

12.0 DISPOSAL / RECYCLING OUTSIDE THE COUNTRY OF ORIGIN

12.1 TRANSPORTING SCRAP TO OTHER COUNTRIES

13.0 MISIDENTIFIED ITEMS

13.1 NOTIFICATION REQUIREMENT

14.0 ENVIRONMENTAL CONTROLS

14.1 WASTE REMOVAL

14.2 ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

15.0 CONTRACTOR-FURNISHED SUPPLIES, FACILITIES, AND SERVICES

15.1 EQUIPMENT AND MATERIALS

16.0 CONTRACTOR PERSONNEL: CONTRACT MANAGER / ALTERNATE CONTRACT

MANAGER / ON-SITE TECHNICAL REPRESENTATIVE

16.1 CONTRACTOR POINTS OF CONTACT

16.2 CONTRACTOR MANAGERS

16.2.1 APPEARANCE

16.3 ENGLISH REQUIREMENTS

16.4 CONTRACTOR KNOWLEDGE

16.5 RESTRICTIONS

16.6 EMPLOYEE TRAINING

16.7 PASSES FOR ENTRY INTO MILITARY INSTALLATIONS

17.0 PROGRESS MEETINGS

17.1 MEETINGS

18.0 U.S. GOVERNMENT-FURNISHED MATERIAL

18.1 FORMS AND PUBLICATIONS

19.0 U.S. GOVERNMENT-FURNISHED SERVICES AND FACILITIES

19.1 U.S. GOVERNMENT PERSONNEL

19.2 DEMIL CERTIFICATION TRAINING / INSTRUCTIONS

19.3 UTILITIES

19.4 OFFICE SPACE

19.5 INSTALLATION / EMERGENCY POINTS OF CONTACT

20.0 DUAL USE U.S. GOVERNMENT EQUIPMENT

20.1 AVAILABILITY

21.0 SECURITY

21.1 PHYSICAL SECURITY

21.2 KEY CONTROL

21.3 CLASSIFIED / CONFIDENTIAL MATERIAL

21.4 MPPEH

21.5 CLASSIFIED / CONFIDENTIAL REPORT

21.6 RANGE RESIDUE

22.0 POST-AWARD ORIENTATION CONFERENCE

22.1 POST AWARD ORIENTATION CONFERENCE

23.0 PHASE OUT

23.1 SITE VISITS

24.0 REVERSION

24.1 CANCELLATION OF SERVICES

25.0 PUBLIC AFFAIRS COORDINATION

25.1 PUBLIC RELEASE OR DISSEMINATION OF INFORMATION

26.0 UNIFORMS REQUIRING MANDATORY INCINERATION – CLINs 0039KB, 1039KB, 2039KB AND 0039SB, 1039SB, 2039SB

26.1 SPECIAL HANDLING

27.0 DELIVERIES AND PERFORMANCE

27.1 PERIOD OF PERFORMANCE

27.2 PLACE OF PERFORMANCE

27.3 CONTRACT EFFECTIVE PERIOD

27.4 TIME OF PERFORMANCE

27.5 CONTAINER PLACEMENT

27.6 CONTRACTOR NOTICE – LATE DELIVERY AND/OR PERFORMANCE

27.7 ACCEPTABLE PERFORMANCE LEVELS (APLs)

28.0 TRANSPORTERS AND TREATMENT, STORAGE, DISPOSAL AND RECYCLING

FACILITIES (TSDRF)

28.1 TREATMENT, STORAGE, DISPOSAL AND RECYCLING (TSDR) FACILITIES

28.2 TRANSPORTERS MATRIX

28.3 USE OF TRANSPORTERS AND TREATMENT, STORAGE, DISPOSAL AND

RECYCLING (TSDR) FACILITIES

29.0 INDEMNIFICATION

30.0 DEFENSE BASE ACT (DBA) INSURANCE

31.0 LIST OF ATTACHMENTS

PERFORMANCE WORK STATEMENT

1.0 GENERAL INFORMATION

1.1 General:

The contractor shall provide all personnel, equipment, containers, tools, materials, supervision, vehicles and other items or services necessary to perform scrap removal, demilitarization (DEMIL) / mutilation (MUT) and de-manufacturing (DEMAN) operations including disposal and recycling. The contractor shall meet the standards including disposal and recycling as defined in this Performance Work Statement for four (4) DLA Disposition Services sites located at Iwakuni, Misawa, Okinawa and Sagami, Japan. Area of coverage also includes Forward Collection Sites, including but not limited to Kawakami, Sasebo, Kure, Hiro Ammo Depot, Akasaki, Akazuki, Yokose, Draughon Range, Torii Station, Naha Port, White Beach, Tengan, Yokota, and Yokosuka. Additional pick-up locations within the listed installations above may be added at no additional cost to the government.

1.2 Statement of Services:

(a) Background

DLA Disposition Services disposes of foreign excess personal property of the United States Department of Defense (DoD). DLA Disposition Services receives property that is no longer required for use in the DoD and makes a determination whether the property is usable or scrap. If usable property is not needed for redistribution within the Federal U.S. Government, it may be donated to state and local U.S. Governments, sold to the general public, or processed for reclamation of specific metals and materials required for use by the DoD. Only material that has not been disposed of by these outlets or is determined to be scrap shall be subject to this contract.

(b) Purpose

The purpose of this contract is management services to include collecting, transporting, recycling, disposing, demilitarizing and de-manufacturing of scrap and recyclable material in an environmentally responsible and compliant manner. This contract does NOT involve disposal of hazardous materials (HM) or hazardous waste (HW). Scrap and recyclable materials may include range residue that have been assessed as safe (MDAS = Material Documented as Safe).

(c) Objectives

The objectives of contracting for scrap services are to ensure compliant scrap disposal management; to decrease disposal costs; to maximize economic off-sets; to reduce the U.S. Government's capital investment (facilities and equipment costs) and infrastructure; to reduce solid waste disposal through increased recycling;

and to move property efficiently.

(d) Definitions

A list of definitions is provided in Attachment 2.

(e) Permits

The U.S. Government will not seek facility or equipment permits for regulatory compliance. Therefore, contractor-proposed changes to current operations that trigger permitting requirements within U.S.

Government installations will not be allowed.

1.3 Contract Information:

(a) Term of the Contract

The contract includes one (1) 18-month base period and two (2) 18-month option periods.

(b) Contract Type

The contract(s) awarded from this solicitation will be a Firm Fixed Price, Indefinite Delivery /

Indefinite Quantity, Performance-Based, Commercial Service contract.

(c) Contract Minimum / Maximum

The minimum amount for the base period shall be ¥2,775,000, with no minimum for the option periods. The maximum amount for the base and each of the priced options shall be 300% of the estimated value of the period.

The estimated value of a period is the sum of all four schedules (Iwakuni, Misawa, Okinawa, & Sagami) for that period (Base period, 1st or 2nd option).

(d) Task Orders

Task Orders (see Attachment 3, DD Form 1155) will be issued based upon the unit prices established in the contract price schedule. No task order will be issued unless funds are available. The accounting and appropriation data will be stipulated on each task order. The issuance of a task order shall constitute notice of availability and obligation of funds for the items listed on the task order.

(e) TASK ORDER ADJUSTMENTS

All task order quantities are estimated amounts. The contractor can expect that the task order quantities will be required to be adjusted upward or downward as removals take place and the actual pounds being removed are measured. Therefore, the Government has the unilateral right to increase the task order quantity in those instances where the Government has underestimated the amount of weight that is required to be removed so the Contractor can continue performance. The Government has the unilateral right to decrease the task order weight in those instances where the Government has overestimated the quantity that is required to be removed.

In instances of decreasing weight, these decreases are not subject to FAR 52.212-4, termination for convenience coverage. In addition, it is agreed that it is acceptable for the Government to issue task order modification (i.e. quantity changes, noun descriptions, HIN changes, adding/deleting lines, extending task order end dates, etc.) unilaterally. The contractor will be paid for the actual items and quantities removed per the awarded contract price schedule. If upon receipt of a unilateral task order modification, the contractor does not agree with the change or changes, the contractor reserves the right to seek resolution with the Contracting Officer. These modifications are only against task orders. No changes are made to the terms and conditions of the contract.

1.4 CLIN Format and Compensation of Services:

The Schedule of Prices (Attachment 1) displays the CLIN, description and estimated quantity (weight) of each type of scrap material available for recycling and / or disposal. These quantities are forecasted eighteen

(18) month future generations based on historical data. When possible and for informational purposes only, U.S. Government Scrap Classification codes (SCL) are listed for each scrap item within the Schedule of Prices. Information describing the service or type of scrap material, collection / pickup area, and special handling requirements (demilitarization / mutilation and / or destruction, and de-manufacturing) are contained in each Contract Line Item Number (CLIN) format as follows:

a. The first four (4) positions are numeric and indicate service or scrap material for transportation, recycling and disposal (e.g. “0002” is Cardboard).

b. The fifth (5TH) position is an alpha-character and indicates the DLA Disposition Services site collection / pickup area. Some characters represent more than one pickup are.

DLA Disposition Services Sites:

K = Okinawa M = Misawa S = Sagami W = Iwakuni

Forward Collection Sites:

1. A = Iwakuni FCS Hiroshima – including

i. Kawakami Ammunition Depot;

ii. U.S. Army Akazuki Ammunition Depot;

iii. HIRO U.S. Navy Akasaki POL Depot;

iv. Kure, U.S. Army

2. B = Iwakuni FCS Nagasaki – including

i. U. S. Fleet Activities Sasebo Recycling Center;

ii. U.S. Navy Yokose LCAC Facility;

iii. U.S. Navy Akasaki POL Depot

3. C = Misawa FCS – including

i. Draughon Range, Aomori

4. D = Okinawa FCS 1 – including

i. Naval Base White Beach, Uruma City;

ii. Naha Port, Naha City;

iii. Torii Station, Yomitan Village

5. E = Okinawa FCS 2 – including

i. Tengan Anchorage, Camp Courtney

6. F = Sagami FCS 1 – including

i. U.S. Naval Base, Yokosuka

7. G = Sagami FCS 2 – including

i. Yokota Air Force Base

c. The sixth (6th) position indicates special handling requirements as follows:

A = Scrap / Recyclable material. No special handling requirements.

B = DEMIL \ MUT Scrap Material requiring demilitarization and / or destruction in accordance with PWS 7.0.

D = Electronic scrap requiring de-manufacturing in accordance with PWS 7.0.

d. For CLINs 0001, 1001, and 2001 only, the sixth (6th) position differentiates the various levels of service.

A = Part time (<40 hrs/wk), Full Service (Contractor load)

B = Full time (40 hrs/wk), Limited Service (Government load)

C = Full time (40 hrs/wk), Full Service (Contractor load)

e. An exception to the CLIN format described above is P7100J which is the CLIN for Defense Base Act insurance coverage. This CLIN appears in the Sagami price schedules only, but includes coverage for all of Japan if ordered.

f. Index information for Category 1 CLINs:

The Shigen Shinpou publication (index) will be used. Subscriptions for the publication may be obtained by contacting:

Shigen Shinpou 1-44-17 Higashiikebukuro Toshima-ku, Tokyo 170-0013 Tel: 03-3984-2551, Fax: 03-3984-2738 website: http://www.shigenshinpou.com/

This publication, published the first week of each month, shall be used for pricing and invoicing purposes. The specified high prices of the Shigen Shinpou Index will be used. It is the responsibility of the contractor to obtain the subscription and provide a copy to the Contracting Officer (CO) for verification purposes. The contractor shall e-mail the monthly index prices to the CO by the seventh day of each month. For example, the October index is due to the CO by October 7.

When a task order is issued for a particular month, it will reference the previous month’s index.

The index used in the task order will be replaced when the current month’s index is released. For example, a task order for November will be issued in late October and will reference October’s index prices since the November index has yet to be released. After the November index is released, a modification to the task order will be issued to replace the October index with the November index.

g. Special Services CLINs

i. De-manufacturing (DEMAN) CLINs X043_D

CLINs identified by a “D” in the sixth position require DEMAN. This CLIN shall be ordered by the “pound.” The unit of issue of “pound” will represent a per pound rate.

The contractor must be able to DEMAN property during normal operating hours at U.S. Government collection sites designated by the Contracting Officer. See DEMAN definition in Attachment 2. Disposal of residual material (hazardous waste and / or solid waste) not listed under Category 1 or 2 CLINs is the responsibility of the U.S. Government.

Contractor employees performing the DEMAN of property are required to be in possession of all required permits and licenses (for example: torch cutting permit, shredder operator license, crane operator license, forklift operator license) and must comply with all national, international and prefectural laws.

DEMAN work is intended at DLA Disposition Services at Iwakuni, Misawa, Okinawa and Sagami.

Once DEMAN work is performed and certified, the contractor shall segregate scrap items into scrap containers and removal will be requested under the appropriate Category 1 or 2 CLINs unless otherwise specified. See PWS 7.0 titled, “Demilitarization (DEMIL) / Mutilation (MUT) / De-manufacturing (DEMAN),” for further requirements.

All circuit cards and microprocessors removed from the DEMAN process shall be returned to the U.S.

Government.

ii. Demilitarization (DEMIL) / Mutilation (MUT) CLINs X044_B:

CLINs identified by “B” in the sixth position require DEMIL / MUT. This CLIN shall be ordered by the “pound”. The unit of issue of “pound” will represent a per pound rate. The contractor must be able to perform DEMIL / MUT of property during normal operating hours at U.S. Government collection sites designated by the Contracting Officer.

Exception to this is the demilitarization of fired cartridges that require DEMIL by smelting (offsite).

See the definitions of Demilitarization and Mutilation in Attachment 2.

The contractor shall ensure a DEMIL / MUT Certificate is completed and signed by an approved certifier and verifier after the property is totally destroyed. The contractor shall provide written certification that DEMIL / MUT of the property has been accomplished in accordance with DoD regulations. Disposal of residual material (hazardous waste and / or solid waste) not listed under Category 1 or 2 CLINs is the responsibility of the U.S. Government. Employees performing the DEMIL / MUT are required to be in possession of all required permits and licenses (for example: torch cutting permit, shredder operator license, crane operator license, forklift operator license) and must comply with all national, international and prefectural laws. DEMIL work is intended at DLA Disposition Services sites as designated by Contracting Officer, Once DEMIL / MUT work is performed and certified, the contractor shall segregate scrap items into scrap containers and removal will be requested under the appropriate Category 1 or 2 CLINS. See PWS 7.0 titled, “Demilitarization (DEMIL) / Mutilation (MUT) / De-manufacturing (DEMAN),” for further requirements.

All circuit cards and microprocessors removed from the DEMIL/MUT process shall be returned to the U.S. Government.

1.5 Contractor Responsibilities:

A. The contractor is responsible for performing all services necessary in connection with management of scrap collection sites, transportation, removal, recycling and disposal of scrap materials. Required contractor services include all staff, equipment, management of scrap collection sites, documentation, provision and maintenance of containers, and coordination with the Contracting Officer Representative (COR) on the placement of material into containers. All scrap property shall be maintained in containers and will not be left stored on the ground or outside of containers overnight except for “oversized items,” such as vehicles, boilers, expended cartridges and cases. For material stored on the ground or outside of containers, the contractor shall maintain that material in a neat and clean condition to prevent collection of rainwater and/or snow. The contractor shall provide a sufficient number of containers to efficiently remove full containers while ensuring enough containers are available to prevent new generations of property from being stored on the ground or outside of containers overnight.

B. When CLINs X043_D or X044_B are ordered, the contractor is responsible for the DEMIL / MUT / DEMAN of special handling property as designated by the COR. All CLINs identified by a “B” in the sixth position of the CLIN require DEMIL / MUT. CLINs identified with a “D” in the sixth position require DEMAN. See PWS 7 for additional requirements.

1.5.1 CLIN 0001, 1001 and 2001 Management of Scrap Collection Site(s):

A. Includes all staff, equipment, coordination, waste management and documentation necessary to perform the services described below. The U.S. Government plans to issue task orders for management services during the entire period that the contract is in effect subject to adequate funds availability. However, prospective offerors are reminded that this is an Indefinite Delivery, Indefinite Quantity (IDIQ) type contract and the quantity of management services specified in the Schedules are estimates only and are not purchased by this contract on the date of award. In accordance with FAR 52.216-22, entitled “Indefinite Quantity (Oct 1995), the contractor’s performance shall be made only as authorized by task orders issued in accordance with the Ordering clause.

B. Containers must be covered except when placing or removing scrap material to prevent collection of rainwater and / or snow. CLINS requiring DEMIL, MUT and/or DEMAN must be secured at all times. The Contractor is responsible for removing and replacing full containers within 3 working days.

C. Contractor is responsible for performing all services necessary in connection with establishing and maintaining a scrap material collection site at locations and operating hours specified in Attachment 4, with the exception of those services provided by the U.S. Government. Contractor shall maintain a neat, clean collection site and shall operate the collection site in accordance with all host nation laws and DoD requirements specified herein. The contractor shall maintain the containers so that material does not overflow, overhang the containers, or otherwise create unsafe conditions.

D. These project services will be ordered in addition to the usual disposal/processing services for CLINs 0002 to 0050, 1002 to 1050 and 2002 to 2050. In addition to receiving the management of scrap collection site fee, the contractor shall be paid the weight-based (“per pound”) disposal fee for any materials it processes and return a “percent of index” fee to the U.S. Government (where applicable).

E. Segregation is the process of identifying the material for its basic material content. The basic material content is established by the DLA Disposition Services personnel which includes packing material, .i.e. shrink wrap, paper etc. on scrap content. This determination is based on the predominant composition by weight of an item in the best interest of the U.S. Government. Questionable items will be determined in conjunction with the CO, COR and contractor.

F. The contractor personnel may further break down an item into its individual basic material contents and sort for better scrap grouping in appropriate Category 1 or 2 CLINs. Further segregation by the contractor must not negatively influence storage and generator scrap receipt operations, and does not include packaging material from scrap. This process is accomplished by the onsite contractor personnel at no additional cost to the U.S. Government. Scrap material being further segregated shall be stored in containers. Further segregation shall be completed within 2 weeks of receipt, or placed in the original CLIN identified by DLA Disposition Services personnel.

G. The contractor must staff and equip each location so that it can demilitarize, mutilate or de-manufacture material from DoD generating activities and DLA Disposition Services Sites in coordination with the COR during each site’s operating hours. The contractor must be able to perform DEMIL / MUT / DEMAN of property Monday through Friday at all DLA Disposition Services Sites when CLINs requiring DEMIL / MUT / DEMAN are identified on a task order. The U.S. Government may order these services on a monthly basis as long as this contract is in effect. Contractor shall be responsible to staff and equip each site with the appropriate amount of personnel to provide the required services. During the DEMIL / MUT / DEMAN process, the contractor shall collect, in U.S. Government-provided containers, any residual hazardous material or hazardous waste generated from these processes that are not listed under Category 1 or 2 CLINs. Once collected, the containers shall be turned over to the U.S. Government for disposal.

1.5.1.1 MISAWA X001MA AND IWAKUNI X001WA CLINs (Full Service, Tuesday through Thursday):

At DLA Disposition Services Misawa and Iwakuni, the contractor is responsible for physically receiving scrap material from DoD generating activities in Japan, offloading generating activity conveyances, segregating, sorting, and moving property it deems necessary to manage the scrap materials, and for placing the materials into contractor-provided containers.

Contractor must staff each location so that it can maintain the yard, receive turn-ins of material from DoD generators, and perform special services (DEMIL/MUT/DEMAN) at DLA Disposition Services Misawa and Iwakuni Tuesday through Thursday during each sites operating hours.

1.5.1.2. SAGAMI CLINs X001SB (Limited Service, Monday through Friday):

At DLA Disposition Services Sagami, the U.S. Government is responsible for physically receiving scrap material from DoD generating activities in Japan, offloading generating activity conveyances, segregating, sorting, and moving property it deems necessary to manage the scrap materials, and for placing the materials into contractor-provided containers. The contractor may place materials into contractor-provided containers with prior approval from the COR. The contractor is responsible for container management to ensure U.S. Government personnel can place the scrap material in the proper container and location.

Contractor must staff the location so that it can maintain the yard and perform special services (DEMIL/MUT/DEMAN) at DLA Disposition Services Sagami Monday through Friday during operating hours.

1.5.1.3. OKINAWA CLINs X001KC (Full Service, Monday through Friday):

At DLA Disposition Services Okinawa, the contractor is responsible for physically receiving scrap material from DoD generating activities in Japan, offloading generating activity conveyances, segregating, sorting, and moving property it deems necessary to manage the scrap materials, and for placing the materials into contractor-provided containers.

Contractor must staff the location so that it can maintain the yard, receive turn-ins of material from DoD generators, and perform special services (DEMIL/MUT/DEMAN) at DLA Disposition Services Okinawa Monday through Friday during operating hours.

1.6 Licenses and/or Permits:

The contractor shall, without additional expense to the U.S. Government, be responsible for obtaining all necessary licenses and/or permits to conduct these services in accordance with all national, international and prefectural laws, ordinances and regulations that govern collection, transportation, processing, recycling, and disposal of scrap and DEMAN materials. The contractor shall maintain all licenses and/or permits during the entire life of the contract. All renewals and/or changes to licenses and/or permits shall be provided to the Contracting Officer within 5 calendar days of any renewal and/or change.

1.7 Special Requirements:

The Contractor, at their own expense, is required to attend special training, seminar, instruction, class, etc. provided by the U.S. Government, to perform the work or gain access to the installation. Some examples include but are not limited to: Pass and ID requirements, anti-terrorism/force protection training, Environmental Management System policies training, forklift training, DEMIL training and safety training.

1.8 Reports:

Contractor shall prepare and submit all reports mandated by the Japanese Government such as notifications, annual reports, Annual Waste Balance Sheet, required quantity forecasts, proof of recovery or recycling, scrap material logs, and five-year plans. The contractor must meet reporting requirements established by Japanese National and Prefectural law, International ordinances and regulations that govern collection, transportation, processing, recycling, and disposal of scrap, and other materials generated from the scrap and DEMAN processes. Contractor shall submit reports in accordance with PWS 8.0 titled, “Required Reports” and as stated below:

1.8.1 Required information:

Task Order, Actual Amount Removed, CLIN, Material Content, Weight, Sold, Recycled, Land-filled, Incinerated, Other Disposition – [When used, provide specific details]

Below is the desired format of the report:

SAMPLE REPORT - ONLY

Final Disposition of Material

Contract Number:

Task Order Number:

SAMPLE REPORT ONLY

Pickup Date:

CLIN

Metal Type

Quantity and Unit of Issue

Disposition of Material, e.g., Recycled, incinerated, land-filled

0014XX Aluminum 300 lbs Recycled 0009XX Brass 100 lbs Recycled

Bronze Copper Ferrous, mixed

Ferrous, light

Total Weight

SAMPLE

REPORT

- ONLY

The commodities listed in the report sample above are only examples. The contractor shall list all commodities that are actually sold, recycled or disposed. The report will reflect the final dispositions of all commodities on each task order. The report shall be submitted upon completion of each task order. The COR shall certify the report for acceptance of services provided under the task order.

1.9 Contractor Identification:

All contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with U.S. Government personnel. In addition, all contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

2.0 MANAGEMENT OF COLLECTION POINTS

This effort will start with the first working day of the basic contract period and will entail the establishment of the collection points, placement of contractor’s containers while performing in accordance with this contract.

2.1 Removal of Current Inventories: The contractor shall provide containers and remove current inventory of scrap materials and incoming generations once container is full. If not full, within 30 days of issuance of the first task order for this work. Upon completion of current inventory, the contractor is responsible to perform all other work in accordance with the performance periods identified within the contract and as specified in PWS 27.0 titled, “Deliveries and Performance.” A sample inventory January 2018 for each site is listed in Attachment 5 titled, “DLA Disposition Services Inventory Snapshot.” Additional Workload History for Fiscal Year (FY) 2017 and FY 2018 are provided in Attachment 6 titled, “Workload History” for each DLA Disposition Services site. Because the current inventory is only a snapshot in time January 2018, an updated inventory list will be provided upon request within ten (10) calendar days of the contract award date. The updated inventory list may not accurately represent future inventory quantities.

2.2 Design/Organize/Set up: The contractor shall establish efficient scrap collection points at each DLA Disposition Services site as listed and described in Attachment 4 and at forward collection sites as required. Collection points shall be designed to utilize current allocated space, establish optimal efficiencies in collecting, transporting, recycling and disposing of the scrap material in an environmentally compliant manner without triggering the requirement for the U.S. Government to obtain any new permits.

The contractor will be given a 30-day commencement period after contract award to complete design and set up.

(i) The U.S. Government does not intend to construct permanent fixtures. The collection point should be tailored to the scrap material received and containers shall be sufficient for each type of scrap generated. The objective is to have adequate containers in place to begin performance of the contract effective 30 days after contract award. All additional containers must be in place by the close of business on the last day of the first work week of the contract performance period. All containers must be identified by an attached visible magnetic placard with the minimum overall dimensions 40 cm x 60 cm with 4 cm lettering and at a minimum the following information in English and host nation language: CLIN for applicable site (example _005WA, _013WA, etc...) and the Basic CLIN description. Additional information may be added as specified by the COR.

(ii) At each DLA Disposition Services site, the scrap yard space utilized will be based on the past history of generations and may be reduced to reflect current requirements. While maintaining compliance, the DLA Disposition Service Scrap COR decides how many and what type of containers will be used at each collection point in order to meet the contract requirements.

2.3 Forward Collection Sites (FCSs):

Commencing 30 days after award, the contractor may be tasked to begin collection of materials at the following Forward Collection Sites: Kawakami, Sasebo, Kure, Hiro Ammo Depot, Akasaki, Akazuki, Maehata, Sakibe, Yokose, Draughon Range, Torii Station, Naha Port, White Beach, and Tengan Anchorage.

These sites have specific CLINs in the Schedule of Prices that identify which CLINs to anticipate. See PWS

1.4 titled for additional information on site identification. If allowed by the FCS, contractor personnel may further break down an item at the site into its individual basic material contents and sort for better scrap grouping in appropriate Category 1 or 2 CLINs. This process is accomplished by the contractor personnel at no additional cost to the U.S. Government. Other forward collection sites may be designated after award of the contract and will be identified by the Contracting Officer. Additional forward collection sites and scrap materials not already identified may be added via modification and will include individual CLINs based on location and the types of materials / commodities anticipated. The contractor is required to load their conveyance at forward collection sites. See PWS 27.2 titled, “Place of Performance” for additional information on places of performance.

Note: For Sasebo and Tengan Anchorage FCS, heavy lift equipment may be needed to further break down an item to its basic material content and transport. The contractor shall take this into consideration when preparing their proposal and include any additional costs in their proposed unit prices.

3.0 CONTAINER MANAGEMENT

3.1 Drop off, Pickup, and Loading:

The contractor shall drop off containers, pickup, and load at the designated sites during the hours specified in Attachment 4 and in accordance with PWS 27.5 titled, “Container Placement.” Contractor will ensure Japanese and installation safety requirements are met. Date and time for loading at the sites will be coordinated with the COR. Removal / exchange of containers will be determined by the DLA Disposition Service Scrap COR. Containers must be covered at all times to prevent collection of rainwater and / or snow, except when placing or removing scrap material.

3.2 Weighing:

Each conveyance shall be weighed by the contractor utilizing U.S. Government scales at DLA Disposition Sites Iwakuni, Misawa, Okinawa and Sagami, before and after scrap material is loaded onto the contractor’s conveyance. An authorized U.S. Government representative will witness the weighing on U.S.

Government scales. Weight tickets will be provided to the COR for the tare weight and loaded weight. The loaded and tare weight of each shipment shall be recorded on the shipping document. The weight, agreed to by the contractor and the U.S. Government representative at the time of removal, shall be the basis for invoice payment calculations.

At forward collection sites or locations other than established DLA Disposition Services sites, unless the U.S. Government indicates a U.S. Government scale is available and shall be used, the contractor shall have a portable scale that can weigh scrap material. The portable scale must be certified by the U.S.

Government of Japan (GOJ) as to proper weighing ability and must be approved by the Contracting Officer.

The driver of the truck carrying the portable scales must keep the annual calibration certificate readily available for COR inspection. An authorized U.S. Government representative will witness the weighing on U.S. Government or other certified scales. Pallets, boxes, strapping, etc., which are not integral parts of the packaging and are not being removed by the contractor will not be included in the weight. Containers and pallets that are to be destroyed along with the scrap materials that they contain shall be included in the net weight.

3.3 Removal:

The contractor in conjunction with the COR determines when and how often containers shall be removed for disposal and will be completed within 72 hours after notification from the COR.

3.4 Transportation:

The contractor shall provide all transportation services related to pick up, loading, marking, and any means used to secure the cargo on contractor-furnished conveyances. All transportation shall be in accordance with Japanese, international and host nation / prefecture solid waste transportation regulations. The U.S.

Government shall purchase and prepare all manifests for scrap movement to the contractor for completion. In cases where scrap and DEMAN material are being transported from Okinawa to Mainland Japan, the regulations governed by the International Maritime of Dangerous Goods (IMDG) Code and other applicable regulations shall be utilized for shipment. While performing under this contract, the contractor is required to provide his drivers with the appropriate emergency action instructions and any other documentation as required by host nation and international transportation regulations, whichever may apply.

3.5 Spill Responsibilities:

The contractor shall be responsible for all spills and leaks caused by the contractor’s performance of work. All materials used to control and clean up the spill will be supplied and maintained by the contractor at each DLA Disposition Services site and forward collection site where demilitarization or mutilation is performed. The contractor is not required to remediate pre-existing site contamination. Clean up involves spills and leaks from contractor operations in performance of this contract only. The contractor agrees to immediately clean up such spills or leaks as soon as the spill occurs. Cleanup will be in compliance with site spill plan provided by the COR and all applicable local, national, and international laws and regulations. The contractor shall dispose of all residue and debris generated from the spill at no additional cost to the U.S. Government and in compliance with local and national laws governing solid and hazardous waste disposal.

3.5.1 Spill Reporting Requirements:

The contractor is responsible for reporting any spills in accordance with host nation or local law or regulation. Contractor is responsible for reporting to the COR and CO all spills of special (or hazardous) wastes, regardless of quantity. Spills shall be reported by telephone to the COR immediately following the incident conveying to the COR, the item spilled, quantity spilled and the exact date, time, and location of the spill. In addition to the telephonic report, the Contractor shall provide a written report to the CO no later than two (2) calendar days after the telephonic report. When reporting a spill the following information shall be furnished:

(i) Item spilled;

(ii) Quantity spilled;

(iii) Exact date, time, and location of spill;

(iv) Initial actions taken and time actions were taken;

(v) Anticipated cleanup and disposal procedures; and

(vi) Persons contacted or present at the time of the spill

3.5.2 Spill Report:

Upon completion of the spill cleanup and disposal of the spill residue, the contractor shall submit a summary report of the spill to the COR and CO. The report shall include cleanup and disposal procedures taken, outside assistance required (if any), personal injury involved, and the names and telephone numbers of all national, regional or local officials contacted.

4.0 RECYCLING AND DISPOSAL

4.1 Recycling: When economically feasible, the contractor shall recycle scrap material to the greatest extent possible. Scrap material shall be segregated, identified with magnetic signs and accounted for in accordance with the CLIN descriptions in the Schedule of Prices. The contractor shall report the volume and percentage of scrap material recycled for each scrap CLIN. For reporting purposes under this contract, incineration shall not be included as recycling.

4.2 Disposal:

The contractor shall be responsible for the proper disposal of all non-salable scrap materials. Disposal shall be in accordance with all U.S. / Japan environmental laws and regulations.

5.0 COMPLIANCE WITH LAWS

5.1 Compliance Terms and Conditions:

The contractor shall be knowledgeable of and comply with all applicable portions of the most current Japan Environmental Governing Standards (JEGS), the Home Appliance Recycling Law (U.S. Government of Japan), Article 3 of “Waste Management and Public Cleansing Law (U.S. Government of Japan)” and all Japan national, prefectural and local environmental laws and regulations governing the requirements of this contract. The contractor shall identify and obtain all licenses and pay all fees and other charges required with no reimbursement from the U.S. Government.

6.0 CUSTOMS

6.1 Customs Duty Tax and Clearances:

Because the U.S. Government generates the scrap material, customs duty or tax may be required on all items. The U.S. Government will ensure timely notification to local customs offices. The contractor is responsible for coordinating and fulfilling any customs clearance requirement with the appropriate office for removals at no additional cost to the U.S. Government. An approved copy of the customs clearance must be provided to the COR prior to removal of property from U.S. Government collection sites.

7.0 DEMILITARIZATION (DEMIL) / MUTILATION (MUT) / DE-MANUFACTURING

(DEMAN)

7.1 CLINs 0043 _ B, 1043_B, 2043_B and 0044_D, 1044_D, 2044_D:

(a) The contractor is responsible to operate the demilitarization performance area and to perform required DEMIL / MUT / DEMAN. See the definitions of the three processes in Attachment 2.

(b) Employees performing the DEMIL are required to be in possession of all required permits (i.e. torch cutting permits, shredder operator license, etc.) and must comply with all U.S. and Japan regulations applicable.

Employees performing DEMIL, MUT or DEMAN must complete all required training and be qualified DEMIL certifiers per U.S. Government requirements; see PWS 1.5, 16.6 and 19.2. Certification will be completed immediately after the DEMIL / MUT / DEMAN is complete. Performance is not complete until the certificates are signed and dated.

(c) If it is determined DEMIL / MUT / DEMAN must be accomplished off site, a site specific plan will be prepared by the contractor within five (5) calendar days after issuance of the task order, and provided to the COR and DEMIL Coordinator for approval prior to commencing work. DEMIL must be accomplished within 100 km radius of the appropriate DLA Disposition Services collection site. Exception to this is the DEMIL of fired cartridges (DEMIL by smelting). The contractor may request for a new negotiated CLIN for Demil or Deman work requested outside of the 100 km radius.

(d) The COR at each U.S. Government collection site will provide the method and degree of DEMIL / MUT for DEMIL / MUT required items, to the contractor prior to performance. The method and degree for DEMAN required items are to mutilate all components and sub-components to preclude restoration or repair to a usable condition.

(e) Some DEMIL / MUT / DEMAN required items may contain hazardous components. The contractor is responsible for the collection, in U.S. Government-provided containers, all hazardous materials and wastes that are not listed under Category 1 or 2 CLINs and generated by the DEMIL, MUT or DEMAN process. Hazardous property disposal shall be conducted by the U.S. Government.

(f) Both onsite (U.S. Government collection sites) and offsite performance requires 100% surveillance by U.S. Government and / or approved contractor representatives (Certifier and Verifier).

(g) Once DEMIL / MUT / DEMAN work is performed and certified, residue generated from the DEMIL / MUT / DEMAN process will be segregated by the contractor into appropriate Category 1 or 2 CLINs. Circuit cards/boards and computer processors shall be returned to the U.S. Government.

7.2 Off Site Demilitarization/Mutilation/De-manufacturing Plans:

The contractor is required to begin and complete DEMIL / MUT / DEMAN on specified items removed from the U.S. Government collection site on the date of removal and during the U.S. Government collection site’s operating hours. Processing will begin immediately after arrival at the contractor’s facility and the breaking of the sealed container witnessed by the COR. Property identified by the U.S.

Government as DEMIL /MUT / DEMAN required shall be stored and processed separately from non- DEMIL / non-Mutilation / non-DEMAN required property. The property shall be stored in a manner that allows and facilitates U.S. Government inspection. The contractor shall adhere to the plan provided and accepted by the CO that describes how and where DEMIL / MUT / DEMAN of specific items will be performed and completed. Contractor personnel performing DEMIL / MUT / DEMAN certification will be required to attend U.S. Government-sponsored training.

No additional monetary compensation will be given to the contractor for attending the training. The contractor shall ensure one (1) U.S. Government verifier (must be a U.S. citizen) is present and shall provide one (1) contractor certifier who is technically trained and qualified, to witness 100% demilitarization, mutilation and / or de-manufacturing. Note: The contractor should only schedule an amount of property they reasonably believe can be destroyed within one work day. If the contractor cannot complete the task within the date and time specified, all remaining property (property not yet demilitarized/mutilated or de-manufactured) must be returned by the contractor to a U.S. Government installation to be properly secured.

7.2.1 Weighing of DEMIL / MUT / DEMAN required items:

In addition to the requirements described in PWS 3.2 titled “Weighing,” the weight of each shipment shall be recorded on the shipping document as witnessed by the COR. The gross and the tare weight of each shipment shall be recorded on DLA Form 1367; see Attachment 7 titled, “DLA Form 1367, Shipment Receipt / Delivery Pass.” Upon re-weighing of DEMIL / MUT / DEMAN scrap at the contractor’s facility, any discrepancy of weight shall be reported immediately to the CO followed with a detailed written report provided within 24 hours of the discovery.

7.3 Transportation of DEMIL / MUT / DEMAN Required Property:

The contractor's conveyance will be locked and sealed to ensure security of property requiring DEMIL / MUT / DEMAN. The U.S. Government will provide numbered seals. The COR will seal the conveyance.

Contractor and COR shall witness the sealing of the conveyance at the U.S. Government facility. The COR will view the breaking of the seals prior to unloading at the contractor’s facilities. Any discrepancies will be reported to the COR immediately. The contractor will provide a written report of explanation to the CO within 24 hours of discovery. Regardless of any other provision of this contract, the U.S. Government reserves the right not to accept and pay the contractor for transportation related services that do not conform to the specific physical security requirements stated herein.

8.0 REQUIRED REPORTS

8.1 Accounting:

From removal to disposal, the contractor is responsible for maintaining an accurate, updated record of U.S. Government scrap / recyclable materials. The contractor shall maintain complete and accurate records to substantiate the weight of scrap / recyclable materials received and disposed of, the amount owed by the U.S.

Government for management and processing fees, and off-sets to the U.S. Government for positive value items (Category 1 and appropriate positive value Category 2 items), and the actual payments made by the U.S. Government for negative value Category 2 items. The contractor shall retain copies of all shipping records; records verifying contractor's weight calculations; and dates of disposal / recycling. Copies shall be retained for a length of time mandated by host nation regulations, but in no event shall any records pertaining to this contract be destroyed prior to the time this contract is closed and settled. The contractor shall provide the U.S. Government access to such records and any other records that are maintained under this contract for the purpose of audit. All records shall be provided to the U.S.

Government within three (3) calendar days of request from the CO or COR.

8.2 Collection Reports:

8.2.1 Monthly Report:

The contractor shall provide a monthly report to the COR specifying disposition of scrap / recyclable materials removed by material content / commodity. This report will reflect each task order issued and the actual amount of scrap / recyclable materials removed per CLIN. It will indicate, by material content, the weight of scrap / recyclable material recycled as well as any other disposition, such as landfill or incineration.

8.2.2 Semi-Annual Report:

The contractor shall prepare and provide to the COR a summary of the monthly information every 6 months. The required information is for the completion of the annual report (Annual Waste Balance Sheet) for each scrap material producer. Information must be submitted by the 15th of July (for performance period January 1 to June 30) and by the 15th of January (for performance period July 1 to December 31) each year for all CLINs used under this contract. The semi-annual report shall specify disposition of scrap / recyclable materials removed by material content / commodity. This report will reflect all task orders issued for the report period and the actual amount of scrap / recyclable materials removed per CLIN. It will indicate, by material content, the weight of scrap / recyclable material recycled as well as any other disposition, such as landfill or incineration.

8.3 Manifesting:

For transport of industrial waste designated for disposal under this contract, the Contractor at all sites shall provide and prepare a Japanese Industrial Waste Manifest. The Contractor shall provide the prepared Japanese Industrial Waste Manifest to the Generator, DLA COR for signature. The completed manifest, with all appropriate signatures shall be submitted with the invoice. No invoice shall be paid without a completed Japanese Industrial Waste Manifest signed by the appropriate disposal / recycling facility. In addition to the regulated distribution of the Japanese Industrial Waste Manifest, a copy of the completed document must be forwarded to the COR no more than ten (10) days after it is signed by the disposal facility.

8.3.1 Manifest Tracking Log:

The contractor shall complete a Manifest Tracking Log; see Attachment 8 titled, “Manifest Tracking Log” for each task order requiring disposal of industrial waste, annotating all industrial waste removed that are included on the invoice. The manifest tracking log must be completed in the English language. It is essential that the contractor describe the method of disposal; i.e., recycling, incineration for energy recovery, and provide the actual facility where the waste was destroyed. An authorized contractor official shall sign the form.

8.3.2 HM/HW Report:

For DEMAN of electronic scrap, sanitization of vehicles and vehicle parts / components and waste generated by DEMIL / MUT, a semi-annual report will be provided to the CO and COR by the 15th of July (for performance period January 1 to June 30) and by the 15th of January (for performance period July 1 to December 31) each year…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.