SP3300-26-Q-0012 Amendment 0002.pdf
PDF 299 KB Posted
- Solicitation number
- SP3300-26-Q-0012
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for DLA Distribution's solicitation SP3300-26-Q-0012. The amendment serves three primary purposes: 1) revise the Schedule of Services with corrected quantities and ceiling prices, referencing "Attachment 3 – Schedule of Services – Rev2", 2) extend the quote submission due date to 12/10/2025 at 1730 EST, and 3) provide detailed responses to six vendor questions covering submission requirements, pricing formats, maintenance labor categories, response times, subcontractor usage, and site visit expectations.
Key technical details include a requirement for corrective maintenance with a 72-hour maximum response time, allowance for certified door/dock-equipment subcontractors managed by the prime contractor, and instructions to submit pricing directly into an Excel spreadsheet. The solicitation is for maintenance services, with vendors required to quote a single labor rate for corrective maintenance tasks under Time and Materials (T&M) contract line items. The procurement is being conducted by DLA Distribution Acquisition Operations, J7, located in New Cumberland, PA, with Michael French as the point of contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Schedule of Services - Rev2.xlsx | XLSX spreadsheet | |
| SP3300-26-Q-0012 Amendment 0001.pdf | ||
| Attachment 1 - Statement of Work (SOW).pdf | ||
| CSS SP3300-26-Q-0012.pdf | ||
| Attachment 2 - Maintenance Task List.pdf | ||
| Attachment 3 - Schedule of Services.xlsx | XLSX spreadsheet | |
| Attachment 4 - Wage Determination 2015-4467 Rev 32.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
SP3300
SEE CONTINUATION PAGES.
DLA Distribution Acquisition Operations, J7 Mifflin Avenue, Bldg 5430 New Cumberland, PA 17070
POC: Michael French michael.s.french@dla.mil
SP3300-26-Q-0012
1 2
12/05/2025
11/18/2025
SP3300-26-Q-0012
Amendment 0002
The purpose of this amendment is to:
1. Revise the Schedule of Services. The quantities of units and the ceiling prices were incorrectly stated in the originally posted Schedule of Services. Please see “Attachment 3 – Schedule of Services – Rev2” for full details.
2. Extend the due date to 12/10/2025 at 1730EST.
3. Answer the following vendor questions:
a. Question: Beyond the CSS and SF 1449, are there any additional documents required for a complete quote? (Technical approach, past performance, safety plan, subcontractor letters, etc.)
Answer: Please see FAR 52.212-1 Instructions to Offerors – Commercial Items, and FAR 52.212-2 – Evaluation – Commercial Items, in the CSS for submission requirements.
b. Question: Should offerors enter labor rates directly into the XLSX file provided or include a separate pricing sheet in addition to the form?
Answer: Quoters should enter their pricing directly into the Excel spreadsheet “Attachment 3 – Schedule of Services – Rev2” and include this file with their submission.
c. Question: For corrective maintenance tasks that fall under T&M, will DLA require labor categories and fully burdened hourly rates, or is a single blended labor rate acceptable?
Answer: There will not be any separate labor categories; only one labor category under CLINs X007.
Quoters should quote a single labor rate to cover any corrective maintenance hourly labor required.
d. Question: The SOW outlines general performance expectations. Is there a required maximum response time for emergency or after-hours repairs?
Answer: Corrective Maintenance (CM) response should be within a maximum of 72 hours from notification from the Government that CM is required. No after-hours or emergency response is required.
e. Question: Can a prime contractor utilize certified door/dock-equipment subcontractors if all work is fully managed, overseen, and documented by the prime?
Answer: Yes, a prime contractor can use a certified subcontract. Management of the subcontractor is entirely the responsibility of the prime contractor. The Government will not provide direction to the subcontractor.
f. Question: Is an in-person site visit scheduled or required for accurate assessment before quote submission?
Answer: No site visit is being offered for this requirement.
This amendment makes no other changes.
| p1 |
| p2 |
File details come from the government source that posted it. Updated .