Attachment 3 - Schedule of Services - Rev2.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
DDAG - Dock Leveler and Industrial Door Maintenance - SP3300-26-Q-0012
Solicitation number
SP3300-26-Q-0012
Issued by

About this file

This document is a Schedule of Services Excel spreadsheet for a dock leveler and industrial door maintenance contract for DLA Distribution Albany, Georgia. The solicitation (SP3300-26-Q-0012) is a 100% small business set-aside under NAICS code 811310, with a $12.5M size standard, establishing a hybrid firm-fixed-price and time-and-materials purchase order.

The contract covers a base year (March 2026-2027) and four option years (through March 2031), with quarterly preventive maintenance services for various equipment including hydraulic dock levelers, mechanical edge dock levelers, rolling steel doors, Dok-Lok trailer restraints, and flex doors. The pricing structure includes zero-dollar unit prices for preventive maintenance inspections (4 inspections per year per equipment type) and a time-and-materials component with estimated labor hours and a ceiling price for replacement parts. The total ceiling price for the base period and all option years is $22,000, with replacement parts costs ranging from $3,500 in the base year to $5,000 in later option years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BaseYear CLIN PSC-Material # DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Base Year Period - March 2026 - March 2027
Firm-Fixed-Price
Quarterly Preventive Maintenance (PM) Services in accordance with section 1.0 in the Statement of Work
0001J039-V00010201Hydraulic Dock Levelers24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)
0002J039-V00010201Mechanical Edge of Dock Leveler4EA$0.00
(4 inspections each per year of 6 mechanical edges)
0003J039-V00010201Rolling Steel Door4EA$0.00
(Quantity 1 each @ 4 inspections each-per year)
0004J039-V00010201Dok-Lok Trailer Restraints24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)
0005J039-V00010201Flex Doors24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)

Total Firm-Fixed-Price $0.00

Time & MaterialsCEILING PRICE
0006J039-V00010201Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance in accordance with paragraph 2.0 in the Statement of Work. The number of hours shown are estimates only. Contractor will be paid for the actual number of hours worked.20HRS$0.00
CEILING PRICE
00073990-N00005116Replacement parts associated with the performance of corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance. Contractor will be reimbursed for the actual cost of replacement parts only with no additional handling charges - reference paragraph 4.0 in the Statement of Work.$3,500.00

Total Time & Materials $3,500.00

Total Ceiling Price - Base Year Period$3,500.00
Total Ceiling Price - Option Year 1 Period$3,500.00
Total Ceiling Price - Option Year 2 Period$5,000.00
Total Ceiling Price - Option Year 3 Period$5,000.00
Total Ceiling Price - Option Year 4 Period$5,000.00
Total Ceiling Price - Base + 4 Option Year Periods$22,000.00
Controlled by: Enter Vendor's name
Controlled by: Enter Vendor's name
CUI Category: PROCURE
Distribution/Dissemination Control: FEDCON ONLY
POC: Enter Vendor's POC name, email

&"Arial,Bold"CUI

&"Arial,Bold"CUI

OY1

CLIN PSC-Material # DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Option Year 1 Period - March 2027 - March 2028
Firm-Fixed-Price
Quarterly Preventive Maintenance (PM) Services in accordance with section 1.0 in the Statement of Work
0001J039-V00010201Hydraulic Dock Levelers24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)
0002J039-V00010201Mechanical Edge of Dock Leveler4EA$0.00
(4 inspections each per year of 6 mechanical edges)
0003J039-V00010201Rolling Steel Door4EA$0.00
(Quantity 1 each @ 4 inspections each-per year)
0004J039-V00010201Dok-Lok Trailer Restraints24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)
0005J039-V00010201Flex Doors24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)

Total Firm-Fixed-Price $0.00

Time & MaterialsCEILING PRICE
0006J039-V00010201Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance in accordance with paragraph 2.0 in the Statement of Work. The number of hours shown are estimates only. Contractor will be paid for the actual number of hours worked.20HRS$0.00
CEILING PRICE
00073990-N00005116Replacement parts associated with the performance of corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance. Contractor will be reimbursed for the actual cost of replacement parts only with no additional handling charges - reference paragraph 4.0 in the Statement of Work.$3,500.00

Total Time & Materials $3,500.00

Total Option Year 1 $3,500.00

POC: Enter Vendor's POC name, email

&"Arial,Bold"CUI

&"Arial,Bold"CUI

OY2

CLIN PSC-Material # DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Option Year 2 Period - March 2028 - March 2029
Firm-Fixed-Price
Quarterly Preventive Maintenance (PM) Services in accordance with section 1.0 in the Statement of Work
0001J039-V00010201Hydraulic Dock Levelers88EA$0.00
(Quantity 22 each @ 4 inspections each-per year)
0002J039-V00010201Mechanical Edge of Dock Leveler4EA$0.00
(4 inspections each per year of 6 mechanical edges)
0003J039-V00010201Rolling Steel Door4EA$0.00
(Quantity 1 each @ 4 inspections each-per year)
0004J039-V00010201Dok-Lok Trailer Restraints24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)
0005J039-V00010201Flex Doors24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)

Total Firm-Fixed-Price $0.00

Time & MaterialsCEILING PRICE
0006J039-V00010201Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance in accordance with paragraph 2.0 in the Statement of Work. The number of hours shown are estimates only. Contractor will be paid for the actual number of hours worked.60HRS$0.00
CEILING PRICE
00073990-N00005116Replacement parts associated with the performance of corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance. Contractor will be reimbursed for the actual cost of replacement parts only with no additional handling charges - reference paragraph 4.0 in the Statement of Work.$5,000.00

Total Time & Materials $5,000.00

Total Option Year 2 $5,000.00

POC: Enter Vendor's POC name, email

&"Arial,Bold"CUI

&"Arial,Bold"CUI

OY3

CLIN PSC-Material # DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Option Year 3 Period - March 2029 - March 2030
Firm-Fixed-Price
Quarterly Preventive Maintenance (PM) Services in accordance with section 1.0 in the Statement of Work
0001J039-V00010201Hydraulic Dock Levelers88EA$0.00
(Quantity 22 each @ 4 inspections each-per year)
0002J039-V00010201Mechanical Edge of Dock Leveler4EA$0.00
(4 inspections each per year of 6 mechanical edges)
0003J039-V00010201Rolling Steel Door4EA$0.00
(Quantity 1 each @ 4 inspections each-per year)
0004J039-V00010201Dok-Lok Trailer Restraints24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)
0005J039-V00010201Flex Doors24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)

Total Firm-Fixed-Price $0.00

Time & MaterialsCEILING PRICE
0006J039-V00010201Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance in accordance with paragraph 2.0 in the Statement of Work. The number of hours shown are estimates only. Contractor will be paid for the actual number of hours worked.60HRS$0.00
CEILING PRICE
00073990-N00005116Replacement parts associated with the performance of corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance. Contractor will be reimbursed for the actual cost of replacement parts only with no additional handling charges - reference paragraph 4.0 in the Statement of Work.$5,000.00

Total Time & Materials $5,000.00

Total Option Year 3 $5,000.00

POC: Enter Vendor's POC name, email

&"Arial,Bold"CUI

&"Arial,Bold"CUI

OY4

CLIN PSC-Material # DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Option Year 4 Period - March 2030 - March 2031
Firm-Fixed-Price
Quarterly Preventive Maintenance (PM) Services in accordance with section 1.0 in the Statement of Work
0001J039-V00010201Hydraulic Dock Levelers88EA$0.00
(Quantity 22 each @ 4 inspections each-per year)
0002J039-V00010201Mechanical Edge of Dock Leveler4EA$0.00
(4 inspections each per year of 6 mechanical edges)
0003J039-V00010201Rolling Steel Door4EA$0.00
(Quantity 1 each @ 4 inspections each-per year)
0004J039-V00010201Dok-Lok Trailer Restraints24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)
0005J039-V00010201Flex Doors24EA$0.00
(Quantity 6 each @ 4 inspections each-per year)

Total Firm-Fixed-Price $0.00

Time & MaterialsCEILING PRICE
0006J039-V00010201Hourly labor rate to perform equipment repairs in conjunction with corrective maintenance in accordance with paragraph 2.0 in the Statement of Work. The number of hours shown are estimates only. Contractor will be paid for the actual number of hours worked.60HRS$0.00
CEILING PRICE
00073990-N00005116Replacement parts associated with the performance of corrective maintenance. This is an estimated amount for replacement parts required for corrective maintenance. Contractor will be reimbursed for the actual cost of replacement parts only with no additional handling charges - reference paragraph 4.0 in the Statement of Work.$5,000.00

Total Time & Materials $5,000.00

Total Option Year 4 $5,000.00

POC: Enter Vendor's POC name, email

&"Arial,Bold"CUI

&"Arial,Bold"CUI

File details come from the government source that posted it. Updated .