Attachment 27 TE 5.0 APLs.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Warehousing and Distribution Services at DLA Distribution San Diego, CA
Solicitation number
SP330025R5002
Issued by

About this file

The file is a Technical Exhibit 5.0 Acceptable Performance Levels (APLs) spreadsheet for a warehousing and distribution services contract with the Defense Logistics Agency (DLA) Distribution San Diego. The document details specific performance standards across multiple receiving and inventory management activities, including timeliness and quality metrics for different types of inventory movements such as new procurements, customer returns, military service redistributions, stock transfers, and maintenance turn-ins.

Key performance metrics include receiving and putaway timeframes ranging from 24 business hours to 5 calendar days depending on the inventory type, with priority levels assigned to each activity. Quality standards are also specified, such as maintaining less than 0.25% invalid shipping documents (iSDR) and less than 1% return shipping documents (RSDR). The performance levels will be tracked using warehouse monitoring tools and Qlik applications, with measurements applied to monthly transaction volumes across various inventory handling processes.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 5.0

TECHNICAL EXHIBIT 5.0

ACCEPTABLE PERFORMANCE LEVELS (APLs)

NOTE: For APL calculations based on business hours the time accrued doing the work between the hours of 0000-2359 Mon thru Fri is included in the calculation. For example, if the tailgate date and time was Thursday at 1400 and the induct was Friday at 1400 then the business hour time is 24:00. If, however, the induct was the following Monday at 1400, then the business hour time would be 48:00 (because 0000 thru 2359 Sat and Sun) were excluded. Holidays are also excluded from the business hours calculation.

Note: For APL calculations based upon business days, the APL measurement excludes weekends and federal holidays.

Receiving

RECEIVING
TIMELINESS
ACTIVITYSTANDARDAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
New Procurement - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less< 24 average business hours, excludes weekends and holidaysPRI 2New Procurement lines goods receipted per month (Tracked in Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes
New Procurement - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 3 calendar days or less≤ 3 average calendar daysPRI 2New Procurement lines putaway per month (Tracked in Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes
Customer Returns - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less≤ 24 average business hours, excludes weekends and holidaysPRI 3Customer Return lines goods receipted per month (Tracked in Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes
Customer Returns - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 8 calendar days or less< 8 average calendar daysPRI 3Customer Return lines putaway per month (Tracked in Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes
MILSVC Redistributions - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less≤ 24 average business hours, excludes weekends and holidaysPRI 3Redistribution Order (RDO) lines goods receipted per month (Tracked in Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes
MILSVC Redistributions - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 5 calendar days or less≤ 5 average calendar daysPRI 3Redistribution Order (RDO) lines putaway per month (Tracked in Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes
Stock Transfer Order (STO) - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less≤ 24 average business hours, excludes weekends and holidaysPRI 3Stock Transfer Order (STO) lines goods receipted per month (Tracked in Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes
Stock Transfer Orders (STO) - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 5 calendar days or less≤ 5 average calendar daysPRI 3Stock Transfer Order (STO) lines putaway per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
Maintenance Turn-Ins - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less≤ 24 average business hours, excludes weekends and holidaysPRI 3Maintenance Turn-in lines goods receipted per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)No
Maintenance Turn-Ins - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 3 calendar days or less≤ 3 average calendar daysPRI 3Maintenance Turn-in lines putaway per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)No
Re-warehousing StowRe-warehousing pick complete to stow in 3 business days or less< 3 average business days; weekends and holidays excluded.PRI 3Re-warehousing stows completed per month (Tracked in Distribution Dashboard, Qlik application, and/or other J3 provisioned tool.)Yes
Putaway Processing, Aged Work in Process (WIP)Putaways should be completed to standard for each workload categoryNo open putaway older than 30 calendar daysPRI 3Total open putaways as of month end, inclusive of all workload categories and re-warehousing. (Tracked via EWM Warehouse Monitor , Qlik application, and/or other HQ provisioned tool.)Yes

Issue

ISSUE
QUALITY
ACTIVITYSTANDARDAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
iSDR RateMaterial shipped is the correct item, quantity, and CC and shipped to the right customer< .25% of all validated ISDRs performed monthlyPRI 3Valid complaints FY to date per month as a % of total issuesYes
RSDR RateLess than or equal to 1% of total STOs with a valid RSDR< 1% monthlyPRI 3Number of Validated RSDRs divided by number of total STOs monthly. (Tracked in Qlik application, and/or other HQ provisioned tool.)Yes
High Priority MROs, Warehouse Performance Wholesale, excluding Scheduled TrucksMRO Create to Staged in 1 business day or less (Excludes FMS)<1 average business day monthlyPRI 1High priority lines issued per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.) for process types 2010, 2013, 2015, 201L, and 201R.Yes
Routine Priority MROs, Warehouse Performance Wholesale, excluding Scheduled TrucksMRO Create to Staged in 3 business days or less (Excludes FMS)≤ 3 average business days monthlyPRI 3Routine priority lines issued per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
Routine Priority STOs, Wholesale, excluding Scheduled TrucksMRO Create to Staged in 5 business days or less≤ 5 average business days monthlyPRI 3Routine priority STO lines issued per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
Routine Priority MILSVC RDOs, Wholesale, excluding ScheduledTrucksMRO Create to Staged in 3 business days or less (Excludes FMS)< 3 average business days monthlyPRI 3Routine priority MILSVC RDO lines issued per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
DROs, excluding HAZMAT and Radioactive Material (RAM)DRO Create to Staged in 21 calendar days or less< 21 average business days monthlyPRI 3DRO lines issued per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
FMS High Priority MROsMRO Create to Staged in 3 business days or less≤ 3 average business days monthlyPRI 2FMS High Priority MRO lines (as defined by DLA Distribution, currently RDD ‘777’, RDD ‘E_’, RDD ‘N_’, Project Code ‘9G_’, and CASREP (11th position of document number is ‘G’ or ‘W’)) received per month. (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
FMS Routine Priority MROsMRO Create to Staged in 10 business days or less≤ 10 average business days monthlyPRI 3FMS Routine Priority MRO lines, i.e. FMS lines not categorized as High Priority, received per month. (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
Monthly MRO Processing, Aged Bank (awaiting wave release) and Work in Process (WIP)Shipments should be completed to standard for each workload category (Excluding FMS)100% of total CONUS MROs in Bank and in WIP (combined) < 30 calendar days.PRI 3Total MROs awaiting wave release and WIP measured at end of each month of performance. (Tracked via EWM Warehouse Monitor, Qlik application, and/or other HQ provisioned tool)Yes
Monthly MRO Processing, Aged Bank FMS (awaiting wave release) and Work in Process (WIP)Shipments should be completed to standard for each workload category100% of total OCONUS MROs in Bank and in WIP (combined) < 60 calendar days aged.PRI 3Total MROs awaiting wave release and WIP measured at end of each month of performance. (Tracked via EWM Warehouse Monitor, Qlik application, and/or other HQ provisioned tool) Excludes RAD MROs.Yes
*NOTES:

1. The APL clock starts when the MRO/DRO transactions free flow from DAASC into WMS.

COSIS

COSIS
QUALITY and TIMELINESS
ACTIVITYSTANDARDAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
Oldest COSIS ActionAny COSIS action aged for greater than 90 days< 90 Days measured the last day of each monthPRI 2Zero COSIS actions aged greater than 90 days.Data is pulled and measured monthly against all open and completed COSIS actions for the month. (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool and WMS ZCOSISDASH.)Yes
COSIS Aged RateNo more than 5% of all actions aged beyond COSIS timeframes< 5% aged COSIS actions monthlyPRI 2No more that 5% of all COSIS actions per month shall be aged beyond COSIS timeframes identified in PWS section 5.3.3. (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool and WMS ZCOSISDASH.)Yes

Physical Inventory

PHYSICAL INVENTORY CONTROL STANDARDS

INVENTORY APLs APPLY TO WHOLESALE AND RETAIL PROCESSING INCLUDED IN THE CONTRACTOR'S PERFORMANCE REQUIREMENTS

QUALITY and TIMELINESS
ACTIVITYSTANDARDAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
Wholesale Denial RateThe right quantity, condition code, and item is located to fill the MRO≤ 0.40% monthlyPRI 2Total Denials with Management Codes 1, 2, 4, or 5 divided by the sum of total MROs Shipped and Full Denials with Management Codes 1, 2, 4, or 5 for process types 2010, 2013, 2015, 201L, and 201R. (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool).Yes
Cumulative Monthly Completion of the annual inventory plan.Physical inventory Counts completed IAW approved Government monthly inventory plan> 95% of scheduled plan completed monthlyPRI 2Locations scheduled during the month. All Inventory Counts completed cumulative against the Inventory plan (Oct – Aug).Yes
Annual Radiological InventoryPhysical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance100% accuracyPRI 1All items counted at time of annually scheduled inventory. Inventory data can be attained via the Storage Bin Report Segregation CODE A.Yes
Annual Classified & Sensitive InventoriesPhysical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance100% accuracyPRI 2All items counted at time of annually scheduled inventory for Controlled, Classified and Sensitive items (October – August). Measured annually and monitored monthly. Inventory data can be attained via Stock overview report on Classified CIIC codes A, B, C, D, E, F, G, H, K, L, S, T, W, 9, Sensitive 1, 2, 3, 4, 5, 6, 8, O, Q, R, $, 1, Pilferable J, M, N, P, V, X, Y, Z 1,I, and Uncontrolled “U” or blank 1and verified against the Storage Bin Report. Data is baselined at the beginning of each FY.Yes
Annual Cyclic Inventory at the EACHES Level Fiscal Year AccuracyPhysical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance>99% accuracy annually by September 30 of each Fiscal Year at the Eaches levelsPRI 1EACHES Accuracy: 100 x [1 - quantity adjusted/book quantity]. The quantity adjusted is the total quantity of EACHES adjusted from the D8A and D9A 947I transactions. The book quantity is the total quantity recorded in the Accountable Property System of Record (APSR) that relates to the D8A/D9A transactions (including D8As of 0). This accuracy rate is measured annually and monitored monthly against annual plan execution. If accuracy falls below 99% accuracy for the Fiscal Year, See PWS Section C-5.4 Physical Inventory. See section F for metric incentive.Yes
Annual Dollar Value AccuracyPhysical inventory dollar value matches accountable records> 99.8% dollar value accuracy annually by September 30th of each fiscal yearPRI 1Dollar Value Accuracy: 100 x [1 – dollar value adjusted/dollar value of book quantity]. EACHES are multiplied by the UPRICE to calculate the total dollar value at the EACHES level. This accuracy rate is measured annually and monitored monthly against annual plan execution.Yes
Difference Analyzer Workload TimelinesAll DA workload monthly100% completion < 15 calendar days to post completed DA packagePRI 2Difference Analyzer workload monthly. Measurement is from time of DA Create to DA complete. Measured monthly.Yes
Floor to Book Accuracy# of lines that match balance on file vs. total # of lines inventoried FYTD>98% accuracyPRI 1Percent Accuracy of Monthly QAE F2B Compliance Samples performed in the QMTYes
Retail Denial RateThe right quantity, condition code, and item is located to fill the MRO≤ 0.40% monthlyPRI 2Total Denials with Management Codes 1, 2, 4, or 5 divided by the sum of total MROs Shipped and Full Denials with Management Codes 1, 2, 4, or 5 for process types 201D and 2014. (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool).Yes

Packaging

PACKAGING
TIMELINESS
ACTIVITYSTANDARDSAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
Packaging/PPP&M ActionsAccomplish all packaging actions within 30 calendar days of an item being confirmed in PPP&M≥ 90% in 30 calendar days (while meeting all other contract terms and conditions)PRI 2PPP&M work orders closed per month (Tracked via EWM Warehouse Monitor (ZPPPMDASH), in Qlik application, and/or other HQ provisioned tool.)Yes
Packaging/PPP&M ActionsAccomplish all packaging actions within 60 calendar days of an item confirmed in PPP&M100% in 60 calendar days (while meeting all other contract terms and conditions)PRI 2PPP&M work orders closed per month (Tracked via EWM Warehouse Monitor (ZPPPMDASH), in Qlik application, and/or other HQ provisioned tool.)Yes

Retail Receiving

RECEIVING (RETAIL)
TIMELINESS
ACTIVITYSTANDARDAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
New Procurement - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less> 90% on-time against 24 business hours standard .PRI 2New Procurement lines goods receipted per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
New Procurement - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 3 calendar days or less> 90% on-time against 3 calendar days standardPRI 2New Procurement lines putaway per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
Customer Returns - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less> 90% on-time against 24 business hours standardPRI 3Customer Return lines goods receipted per month (Tracked in Qlik Warehouse Monitor application, and/or other HQ provisioned tool.)Yes
Customer Returns - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 5 calendar days or less> 90% on-time against 5 calendar days standardPRI 3Customer Return lines putaway per month (Tracked in Warehouse Monitor), Qlik application, and/or other HQ provisioned tool.)Yes
Stock Transfer Order (STO) - TU Create/ASN Unload to Goods Receipt (Induction)TU Create/ASN Unload to Goods Receipt in 24 business hours or less> 90% on-time against 24 business hours standardPRI 3Stock Transfer Order (STO) lines goods receipted per month (Tracked in Warehouse Moniotor, Qlik application, and/or other HQ provisioned tool.)Yes
Stock Transfer Orders (STO) - TU Create/ASN Unload to Putaway (Stow)TU Create/ASN Unload to Putaway in 3 calendar days or less> 90% on-time against 3 calendar days standardPRI 3Stock Transfer Order (STO) lines putaway per month (Tracked in Warehouse Monitor, Qlik application, and/or other HQ provisioned tool.)Yes
NOTE: APLs in this section do apply to retail receipt of Hazardous and/or Classified

Retail Issue

ISSUE (RETAIL)
TIMELINESS *
ACTIVITYSTANDARDAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
High Priority MROsMRO Create to Staged in 1 business day or less< 1 average business day monthlyPRI 1High priority lines issued per month for process types 201D and 2014 (Tracked in Qlik application, and/or other HQ provisioned tool).Yes
Delivery Response Time (FRC Only)3 days from MRO Create to PGI90% On-Time against a 3-business day standard.PRI 3Tracked in Distribution Dashboard, QLIK application, and/or other HQ provisioned tool. Measured monthlyYes
Replenishment to Shop Service Center (ALC Only)Receipt of Replenishment to delivery to the SSC in 70 hours< 70 average hours monthlyPRI 3Tracked in Distribution Dashboard, Qlik application, and/or other NI provisioned toolNo
DRT Low Pri/NonXYZ & Unserviceable (ALC Only)Receipt of MRO at DLA to delivery to the customer in 1 business day≥ 95% of MROs delivered to the customer within 1 business day. Measured monthlyPRI 3Tracked in Distribution Dashboard, Qlik application, and/or other NI provisioned toolNo
DRT Low Pri/NonXYZ & Unserviceable (ALC Only)Receipt of MRO at DLA to delivery to the customer in 2 business days≥ 95% of MROs delivered to the customer within 2 business days. Measured monthlyPRI 3Tracked in Distribution Dashboard, Qlik application, and/or other NI provisioned toolNo
Delivery Time (Local)PGI to Proof Of Delivery (POD)< 1 avg business day monthlyPRI 3Tracked in Distribution Dashboard, Qlik application, and/or other NI provisioned toolYes

MPC

MPC RECEIVING
TIMELINESS
ACTIVITYSTANDARDSAPLIMPACTMEASUREMENT UNIVERSEAPPLICABILITY
MPC In checkAvg Hrs/Min from TU Create Date/Time to In check to staging location assignment in less than or equal to 96 average hours.≤ 4 average business days monthlyPRI 3MPC lines received divided by the number of MPC transactions (Tracked in Distribution Dashboard, Qlik application, and/or other NI provisioned tool)Yes
Djibouti MPC In-CheckEight (8) hours or less average85% timeliness monthlyPRI 3MPC lines received divided by the number of MPC transactions (Tracked in Distribution Dashboard, Qlik application, and/or other NI provisioned tool)No
Djibouti MPC DeliveryTU assign to material delivery Within 60 minutes of scheduled delivery time85% timeliness monthlyPRI 1Locally tracked, measured, and provided by COR.No