Amendment 0004.pdf

PDF 257 KB Posted

Attached to
DDSP Elevator Maintenance Federal contract opportunity
Solicitation number
SP330025Q0290
Issued by
Defense Logistics Agency Distribution

About this file

This document is an Amendment to a Solicitation for elevator and lift maintenance services at DLA Distribution's Building 430 in New Cumberland, PA. The solicitation (SP330025Q0290) seeks a contractor to perform maintenance, inspection, and testing of six KONE elevators, a dumbwaiter, and three platform lifts, with a quote due date of 12/12/2025 and service period beginning 12/28/2025. Key details include: the elevators contain proprietary KONE components, no site survey will be conducted, no current manufacturer warranties exist, and all past maintenance logs are available in equipment machine rooms. The current incumbent contractor (CAGE 0EQ47) has a purchase order valued at $21,080.00 for the period 9/28/2025 – 12/28/2025, with the previous contract (CAGE 6AV88) valued at $71,550.00. The contractor will be required to perform comprehensive testing and maintenance in accordance with ASME A17 standards, including annual no-load and five-year full-load weight tests using a third-party licensed elevator inspector.

View the file

Other files for this federal contract opportunity

Other files attached to DDSP Elevator Maintenance, newest first.
File Type Posted
Amendment 0005.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
4. Updated SOW.pdf PDF
Amendment 0001.pdf PDF
3. DoL Wage Determination.pdf PDF
2. Equipment List.pdf PDF
1. SOW.pdf PDF
CSS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor t is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

SP3300

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE CONTINUATION PAGE(S)

DLA Distribution Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070

7. ADMINISTERED BY (If other than Item 6)

POC: Morgan Costanzo

(P) 614-693-7759 morgan.costanzo@dla.mil

9A. AMENDMENT OF SOLICITATION NUMBER

SP330025Q0290

12/5/2025

9B. DATED (SEE ITEM 11)

09/04/2025

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. X

1 2 is not X

SP330025Q0290

Amendment 0004

The following questions and answers are hereby incorporated into SP330025Q0290:

The due date for quotes remains Friday, 12/12/2025.

1. Could you please confirm whether the existing elevator equipment—particularly any units manufactured by KONE, Inc.—contain proprietary components, software, or controls? This may impact whether non-OEM contractors can perform full maintenance without restrictions.

With regards to the Bldg. 430’s six KONE Elevators. Software code and design for any elevator’s core operational logic are almost always proprietary and patent protected. With that said, yes, there are proprietary components such as the Door Operators, Traction Machines, Motors, Electronic Circuit Boards, and the Safety (leveling sensors and overspeed sensors) and Detection Devices.

2. Will a site survey or site visit be conducted that would allow vendors to evaluate the installed equipment and determine whether any proprietary limitations exist? If so, could you provide the schedule or details for that survey?

A site visit will not be conducted for this requirement.

3. Additionally, do we have any available technical information, model numbers, or documentation for the existing KONE equipment?

Yes. All Technical Information is found in the Machine Rooms of the respective equipment and can be made available upon request by the COR.

4. Finally, is there a current incumbent contractor performing these services, and if so, what was the previously awarded contract value or bid amount?

Yes, the current purchase order (SP330025P1258) is awarded to CAGE 0EQ47 at $21,080.00, period of performance 9/28/2025 – 12/28/2025.

The previous purchase order (SP330024P0558) was awarded to CAGE 6AV88 at $71,550.00, period of performance 3/29/2024 – 09/28/2025.

5. Could you please advise whether an extension may be granted? Due to the holiday period, many contractors are currently out of the office, making it difficult to obtain competitive quotes within the current timeframe. Also, considering the confirmation of proprietary components of the equipment in need of service.

An additional extension cannot be granted, as service of the new purchase order is required to begin on 12/28/2025.

6. Are any of the elevators, the dumbwaiter, or the platform lifts currently under a manufacturer warranty?

No. All warranty periods have lapsed.

7. Will DLA be providing historical maintenance logs or known deficiency reports before the PM start date?

All past logs are located with each piece of equipment in their respective Machine Rooms. Logs can also be made available from the COR upon request.

8. Are the three platform lifts currently operational or inactive?

The platform lifts are currently inactive.

9. For full-load and no-load annual tests, does DLA have preferred testing windows?

The Contractor shall inspect, test, and maintain all systems and equipment as defined in ASME A17 (IAW Sections 17.1, 17.2, and 17.7) and by the equipment manufacturer. All elevator inspections, annual no load and pressure test, and five (5) years full load weight test; annual dumbwaiter; and annual porch-lift platform testing shall be performed within three (3) months after the contract start date. The cost to perform these safety tests will be included in the price of the contract. The Contractor shall employ a third party, independent Licensed Elevator Inspector to conduct the required certification tests.

10. If site unseen, can you provide installation year of each lift?

Unknown at this time. COR will circle back with the Contract Specialist.

11. What are the model/serial numbers of the units you are requesting services for?

Please refer to Attachment 2 - Equipment List.

12. Is there an incumbent? If so, please provide the total contract value, length and number.

Please refer to response for question number 4 above.

13. Is the scope of work the same as the previous contract?

Yes.

TAB 11 - Amendment 0001
TAB 11 - Amendment 0001 verbiage
Blank Page

File details come from the government source that posted it. Updated .