DESCRIPTION OF ITEM SUBMITTED

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)

01 PS DLA Dig Permit 1.3 G

01 PS List of Contact Personnel 1.3.1.1 G

01 PS Initial Project Schedule 3.4.1 G

01 PS Submittal Register 1.8 G 07 C Submittal Register Updates G 11 CS Completed Submittal Register G

01 PS Accident Prevention Plan (APP) 1.7 G 06 TR Accident Reports 1.12.2 G 07 C Standard Lift Plan 1.7.3.2 G 07 C Activity Hazard Analysis (AHA) 1.8 07 C Confined Space Entry Permit 1.9.1 07 C Hot work permit 1.9.1 07 C Certificate of Compliance 1.12.4

01 PS QC Plan 1.5 G

01 PS Construction Site Plan 1.3 G 06 TR Backflow Preventer Test Reports 3.4 07 C Backflow Tester Certification 1.4.1

01 PS Dirt and Dust Control Plan 3.5.7 G

01 11 00, Summary of Work

01 14 00, Work Restrictions

01 50 00, Temporary Construction Facilities and Controls

01 57 19, Temporary Environmental Controls

01 32 01.00 10, Project Schedule

01 33 00, Submittal Procedures

01 35 26, Government Safety Requirements

01 45 00.10 20, Quality Control for Minor Construction

CONTRACTOR

ACTION

REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DATE OF

ACTION

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

CONTRACT NO:

TITLE:

CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Repair Sprinkler Pipe Near Door 122, Bldg. 2001

SUBMITTAL REGISTER

All Applicable Divisions

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E N T

T Y P E

S U B M I T T A L

D O C U M E N T

D E S C R I P T I O N

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DATE OF

ACTION

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

CONTRACT NO:

TITLE:

CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Repair Sprinkler Pipe Near Door 122, Bldg. 2001

SUBMITTAL REGISTER

All Applicable Divisions

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E N T

T Y P E

S U B M I T T A L

D O C U M E N T

D E S C R I P T I O N

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

01 PS Environmental Protection Plan 1.6 G

01 PS Biobased Products 1.7 G

11 CS As-Built Drawings 3.1 G 11 CS Record Drawings 3.3 G 11 CS Final Approved Shop Drawings 3.4 G

10 CS O&M Database 1.3 G

01 PS Existing Conditions 1.10 01 PS Demolition Plan 1.2.2 G 11 CS Receipts 3.2.4

02 SD Formwork 1.6.2.1 02 SD Reinforcing Steel 1.6.2.2 G 03 PD Formwork Materials 2.1 03 PD Cementitious Materials 2.3.1 03 PD Flowable Fill Mix Design 2.3.1.7 G 03 PD Recycled Aggregate Materials 2.3.3.3 03 PD Concrete Curing materials 2.4.1 03 PD Joint Filler 2.4.4 03 PD Joint Sealants 2.4.5 03 PD Vapor Barrier 2.4.6 03 PD Reinforcement 2.6 05 DD Concrete Mix Design 1.6.1.2 G 06 TR Concrete Mix Design 1.6.1.2 G 06 TR Fly Ash 1.6.4.1

01 78 23, Operation & Maintenance Data

01 78 00, Closeout Submittals

01 57 20.00 10, Environmental Protection

01 62 35, Recycled / Recovered / Biobased Materials.

02 41 00, Demolition and Deconstruction

03 30 00, Cast-in-Place Concrete

CONTRACTOR

ACTION

REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DATE OF

ACTION

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

CONTRACT NO:

TITLE:

CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Repair Sprinkler Pipe Near Door 122, Bldg. 2001

SUBMITTAL REGISTER

All Applicable Divisions

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E N T

T Y P E

S U B M I T T A L

D O C U M E N T

D E S C R I P T I O N

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

06 TR Aggregates 1.6.4.3 06 TR Water 2.3.2 06 TR Slump Tests 3.12.3.1 06 TR Air Content 3.12.3.4 07 C Safety Data Sheets 1.6.3.1 07 C Reinforcing Bars 2.6.1 08 MI Curing Compound 2.4.1 08 MI Joint Sealants 2.4.5

01 PS Grout Placement and Inspection Reports 1.3.1

04 S Aggregates 2.1.2

06 TR Grout Placement and Inspection Reports 1.3.1

06 TR Compressive Strength 3.3 G 07 C Aggregates 2.1.2 07 C Expansive Grout 2.1.5 G

03 PD Sealants 2.1 G 03 PD Primers 2.2 G 03 PD Bond breakers 2.3 G 03 PD Backstops 2.4 G 03 PD Field Adhesion 3.1 G 07 C Indoor Air Quality for Interior Sealants 2.1.1

07 C Indoor Air Quality for Interior Floor Joint Sealants 2.1.3

07 C Indoor Air Quality for Interior Acoustical Sealants 2.1.4

03 62 16, Metallic Non-Shrink Grouting

07 92 00, Joint Sealants

CONTRACTOR

ACTION

REMARKSSUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DATE OF

ACTION

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

CONTRACT NO:

TITLE:

CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna

JOB NAME: Repair Sprinkler Pipe Near Door 122, Bldg. 2001

SUBMITTAL REGISTER

All Applicable Divisions

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E N T

T Y P E

S U B M I T T A L

D O C U M E N T

D E S C R I P T I O N

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD

REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

03 PD Pipe 2.2 G 06 TR Test Procedures 3.4.1 G 07 C Verification of Compliant Installation 3.4.2.1 G 07 C Request for Government Final Test 3.4.2.2 G

01 PS Shoring and Sheeting Plan 1.6.1 01 PS Dewatering Work Plan 1.6.2 06 TR Borrow Site Testing 1.5 G 06 TR Fill and Backfill 3.11.2.1 06 TR Density Tests 3.11.2.2

21 13 13, Wet Pipe Sprinkler Systems, Fire Protection

31 23 00.00 20, Excavation and Fill