Amendment 0001 SP330022Q5031.pdf

PDF 279 KB Posted

Attached to
Racking Install from VA East COCO Site & Rack Installation at DDSP, DDOO, DDRV, DDWG, & DDJF
Solicitation number
SP3300-22-Q-5031
Issued by

About this file

This is a request for quote for pallet rack installation services at multiple Defense Logistics Agency distribution centers. The selected contractor will be required to provide installation of pallet racks for six buildings at five DLA distribution centers located in various states. The contractor must be a small business and registered in SAM. The period of performance is 240 days from award. The requirement is subject to Service Contract Act wage determinations provided for each location. Insurance minimums are specified. The solicitation was issued on July 27, 2022 with questions due by August 11, 2022 and anticipated award before the end of the fiscal year. The contractor must mark the contract number on all paperwork and shipments. Partial payments of up to 70% are authorized for materials and installation milestones. The final payment will be the total price less partial payments made.

View the file

Other files

File Type Posted
Amendment 0005 SP330022Q5031.pdf PDF
A0005_Tire Racks.zip ZIP file
Amendment 0004 SP330022Q5031.pdf PDF
A0004_Attachment 1 - Statement of Work (SOW).pdf PDF
A0004_Attachment 3 - Schedule.xlsx XLSX spreadsheet
Amendment 0003 SP330022Q5031.pdf PDF
Amendment 0002 SP330022Q5031.pdf PDF
A0002_Cross Supports Photos.zip ZIP file
A0001_Attachments (Question 1).zip ZIP file
A0001_Attachment 1 - Statement of Work (SOW).pdf PDF
A0001_Attachment 3 - Schedule.xlsx XLSX spreadsheet
Attachment 8 - DDWG Tire Rack and Divider Specs.pdf PDF
A0001_Photos (Question 2).zip ZIP file
Attachment 2g - Drawing (DDJF 796 FLOOR PLAN Bays 1 and 3).xlsx XLSX spreadsheet
Attachment 7e - Wage Determination DDJF.pdf PDF
Attachment 3 - Schedule.xlsx XLSX spreadsheet
Attachment 5 - New Rack Requirements by Site Final.xlsx XLSX spreadsheet
Attachment 6 - VA COCO Upright Adjustment Notes.jpg JPG image
Attachment 2d - Drawing (DDWG Bldg. 351 Pallet Rack Storage System).pdf PDF
Attachment 2b - Drawing (DDOO 416 and 812 Rack Requirements R2).xlsx XLSX spreadsheet
Attachment 7b - Wage Determination DDOO.pdf PDF
Attachment 7a - Wage Determination DDSP.pdf PDF
Attachment 7d - Wage Determination DDWG.pdf PDF
Attachment 2e - Drawing (DDWG Bldg. 368 Rack Layout Bays A-B-C).pdf PDF
Attachment 2a - Drawing (DDSP ME105 Pallet Rack Layout).pdf PDF
Attachment 2c - Drawing (DDOO Bldg. 812 Pallet Rack Layout).pdf PDF
Attachment 1 - Statement of Work (SOW).pdf PDF
Attachment 7c - Wage Determination DDRV.pdf PDF
Attachment 2f - Drawing (DDRV Bldg. 11 Pallet Rack Layout).pdf PDF
Attachment 4 - Kit Requirements by Site.xlsx XLSX spreadsheet
RFQ SP330022Q5031.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3300-22-Q-5031

AMENDMENT 0001

Amendment 0001 is hereby incorporated into Solicitation SP3300-22-Q-5031 and shall become part of any purchase order issued.

The purpose of this amendment is to provide:

1. Revised Attachment 1 – Statement of Work (SOW)

2. Revised Attachment 3 – Schedule

3. Attachment 8 – DDWG Tire Rack and Divider Specs

4. Zip file – A0001_Attachments (Question #1)

5. Zip file – A0001_Photos (Question #2)

6. Answers to contractor questions

Questions/Answers

Question #1: Who was the manufacturer of the racking to be modified, we will need the specifications of the current material including style, steel gauge, color, and footplate.

Answer #1: Stow Ovar Mfg., SA. The beams and uprights are steel, and they are 16 gauge. The uprights are galvanized. Also, reference the zip file – A0001_Attachments (Question #1).

Question #2: Can we get any additional pictures of this material? Specifically close-up photos of the vertical uprights for the pallet racking, as well as the base plates.

Answer #2: Photos are provided as a part of this amendment. Reference the zip file – A0001_Photos (Question #2).

Question #3: Can the upright be modified by us before they ship to the new locations?

Answer #3: No, all the adjustments for height will need to be made at the various locations.

Question #4: CLIN 0004 DDWG states that all uprights for bldg. 351 will be cut to 16’, but CLIN 0005 states that uprights for bldg. 351 will be cut to 18’. What is the correct height?

Answer #4: CLIN 0004 is Building 351 at DDWG, CLIN 0005 is Building 368 at DDWG. Bldg.

351 will be 18 ft. and Bldg. 368 will be 16 ft. Refer to the revised Attachment 1 – Statement of Work (SOW) and Attachment 3 – Schedule.

Question #5: Attachments 4 and 5 do not seem to match the drawings as far as quantities. Should we go by the spreadsheet, or the drawings?

Answer #5: Go by the drawings. The spreadsheet includes some extra.

Question #6: On the spreadsheet there are, “Bumped by Percentage,” columns, would these be the correct total? This is especially critical for DDWG since there are 2 buildings and the upright heights are different.

Answer #6: Bumped by percentage are the amount that will be sent to each site.

Question #7: On attachment “B” new requirements, there are 100 tire racks for DDWG, building

351. Are there specifications for these?

Answer #7: Reference new Attachment 8 - DDWG Tire Rack and Divider Specs.

Question #8: Are the uprights currently on site at the VA all 21’ height, so all uprights in scope will need to be cut down to 20’ or less?

Answer #8: The majority are 20’ high at the VA warehouse. The first upright in some rows are 21’ high. The 21’ uprights can be used as the first upright in a row when available, but this is not critical.

Question #9: Unloading. Is this part of the contract to be completed by us?

Answer #9: All new parts that are to be supplied in the contract should be unloaded by the vendor.

Question #10: Where will the material to be cut off and reassembled be unloaded and stored?

Inside? Outside?

Answer #10: Cut parts that are to be used for the installation should be stored inside. Locations for storage will be provided by the Site POC during the installation process. The site POC will also provide locations for excess parts after cutting that will either be recycled or waste.

Question #11: What is the proximity/distance to the reinstallation space?

Answer #11: Access will be provided at each location listed in the solicitation to perform the work necessary.

Question #12: Will the workspace be clear and free of traffic and product?

Answer #12: Yes, the workspace will be clear of traffic and product. It shall be the vendor’s responsibility to coordinate requirements with the site POC in advance of the time the space is needed.

Question #13: Will there be a dock location, or a drive-in door dedicated to a scrap and a trash dumpster? How many dock and drive in doors will be available and dedicated to the project?

Answer #13: Docks will be made available when required. To have a door location dedicated cannot be guaranteed, but the Site POC will work with the vendor to insure maximum installation efficiency.

Question #14: Will the hardware from the original disassembly be sorted and separated by type and size for each location?

Answer #14: Figure hardware from the disassembly will need to be replaced and have this cost included in your quote.

Question #15: What are the ceiling heights in the working areas for each location?

Answer #15: Figure at least 1’ of clearance above the height of the uprights for each location.

Question #16: Are LP forklifts and manlifts acceptable? Or electric?

Answer #16: Forklifts can be LP or electric except in HAZMAT Storage Areas. Recommend the manlifts be electric.

Question #17: Several of the reinstall descriptions ask for 3x5 t Guiderail, but no beams on the floor level. That won’t work.

Answer #17: Rail guide installations shall always have bottom beams to clear the rail guide.

Question #18: The addresses of the new buildings will determine the seismic anchoring pattern required for that area.

Answer #18: That is correct. The pattern used at all sites is all holes filled for the end caps.

Alternating front and back from that point.

All other terms and conditions remain unchanged.

END OF AMENDMENT 0001

Amend 0001 SP330016B0016 for FBO
SP3300-15-R-5004 0003 page 1

Amend 0001 Page 2

IDCode:
Page: 1
Pages: 4
Text4: AMENDMENT/MODIFICATION NO.
AmendNo: 0001
ReqNo:
ProjNo:
IssCode: SP3300
IssuedBy: DLA Distribution

Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070

AdmCode:
AdminBy: POC: Benjamin Bailey

717-770-5390 (P) Benjamin.Bailey@DLA.MIL

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: SP3300-22-Q-5031
AmendDate: 07/27/22
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: SEE CONTINUATION PAGE(S)
SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
Text1: 10 August 2022
Text2:
Text3:

File details come from the government source that posted it. Updated .