Attachment 7 - Lab Field Test List-SW_corrections.pdf
PDF 161 KB Posted
- Attached to
- Water Testing - San Joaquin Federal contract opportunity
- Solicitation number
- SP330022Q5002
- Issued by
- Defense Logistics Agency Distribution
About this file
This document outlines laboratory field sampling, testing, and analysis requirements for a federal contract opportunity to provide water testing services in San Joaquin, California. Key details include:
-
The contractor will be required to conduct on-call water supply well resampling, distribution system resampling, disinfection verification, sludge monitoring, and storm water monitoring. Specific sampling locations and test constituents are identified for each program area. Sample collection and handling procedures are also outlined.
-
Testing will include microbiological analyses such as total coliform and E. coli as well as heavy metals, nutrients, and other constituents. Analytical methods including EPA SM methods and USEPA test methods are specified.
-
The contractor must notify the Contracting Officer's Representative within 24 hours of positive coliform detection for further resampling requirements. Labeling, documentation, and reporting of all sample results are required.
-
The opportunity is issued by the Defense Logistics Agency Distribution under solicitation number SP330022Q5002 for on-call water testing services in the San Joaquin area. The statement of work and technical requirements are detailed in the attached laboratory field sampling and analysis schedule document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 0001.pdf | ||
| Attachment 6 - DDJC Water Testing APL Report.pdf | ||
| Attachment 7 - Water Sampling Tests.pdf | ||
| Attachment 5 - DDJC Water Testing COSR.pdf | ||
| Attachment 4 - Lab ELAP Quals List.pdf | ||
| Tab C-1 Combined Synopsis.pdf | ||
| Attachment 3 - Schedule of Services.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| Attachment 1 SOW - Water Smpg Tstg Anlys Svcs - DDJC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Laboratory Field Sampling, Testing, and Analysis Schedule Water Sampling, Testing and Analysis - DDJC
No. Constituents Method Units Sample Type Sample Collection Location 1 Total/Fecal Coliform SM 9221A,B MPN/100ml Grab Govt Water well with positive result
No. Constituents Method Units Sample Type Sample Collection Location 1 Total/Fecal Coliform SM 9221A,B MPN/100ml Grab Govt Re-sampling depends on location of positive result, see current "Bacterial Sample Site Plan"
No. Constituents Method Units Sample Type Sample Collection Location 1 Total Coliform Organisms SM 9223 P/A Grab Govt Various, determined by the COR
No. Constituents Method Units Sample Type Sample Collection Location 1 Acid/Base-Neutral Organics EPA 8270C mg/L Grab Contractor Sludge bin located by the WW plant 2 Antimony (Sb) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 3 Arsenic (As) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 4 Barium (Ba) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 5 Beryllium (Be) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 6 Cadmium (Cd) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 7 Cobalt (Co) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 8 Copper (Cu) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 9 Lead (Pb) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
10 Moisture Content EPA 160.3 percent Grab Contractor Sludge bin located by the WW plant 11 Molybdenum (Mo) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 12 Nickel (Ni) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 13 Silver (Ag) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 14 Thallium (Tl) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 15 Chromium (Total Cr) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 16 Vanadium (V) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant 17 Zinc (Zn) EPA 6010B mg/L Grab Contractor Sludge bin located by the WW plant
No. Constituents Method Units Sample Type Sample Collection Location 1 Aluminum (Al) (pH 6.5-9) EPA6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
2 Antimony (Sb) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
3 Arsenic (As) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
Sampling, Testing, and Analysis (STA) Schedule: ON-CALL
WATER SUPPLY WELL RESAMPLING PROGRAM
DISTRIBUTION SYSTEM RESAMPLING PROGRAM
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.12.2 Samples Collection – System Resampling Program: Distribution System. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor shall notify COR within 24 hours of a potable water sample being detected as total coliform positive, and collect a repeat sample set within the same 24 hours. 6. A repeat sample set consists of three (3) samples: one from the same location as positive sample, one collected within 5 service connections upstream from positive sample, and one collected within 5 service connections downstream. 7. The COR shall designate sampling locations. 8. Contractor shall notify COR within 24 hours when one or more samples in repeat sample set is coliform positive, and take an additional set of repeat samples within the same 24 hours. 9. Repeat process until no coliform is detected in two (2) consecutive sample sets. 10. Sampling process shall be compliant IAW Title 22, Chapter 15, Article 3 of California Code of Regulations.
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.12.1 Samples Collection – System Resampling Program: Wells. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor shall notify COR within 24 hours of a total coliform positive, potable water sample. 6. Contractor will be notified by the COR of any resampling requirement. 7. Resamples must be taken within 24 hours of notification. 8. Well resampling shall consist of five samples taken at the following intervals: immediate, 30 seconds, 1 minute, 5 minutes, between 15 and 30 minutes. 9. Contractor shall notify COR within 24 hours when one or more samples in repeat sample set is coliform positive, and take an additional set of repeat samples within the same 24 hours. 10. Repeat process until no coliform is detected in two (2) consecutive sample sets. 11. Sampling process shall be compliant IAW Title 22, Chapter 15, Article 3 of California Code of
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.13 Samples Collection – Disinfection Verification Program 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor will be notified by the COR of any sampling requirement. 6. Samples must be picked-up within 4 business hours during regular business hours Monday - Friday (no holidays) following notification. 7. The Environmental Protection Office shall be notified of the test results via email as soon as results are available.
DISINFECTION VERIFICATION PROGRAM
SLUDGE MONITORING
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.13 Samples Collection - Sludge Monitoring Program. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. The Contractor shall collect and analyze sludge samples as determined and requested by the COR.
STORM WATER MONITORING
DLA DISTRIBUTION SAN JOAQUIN CA
Laboratory Field Sampling, Testing, and Analysis Schedule Water Sampling, Testing and Analysis - DDJC
4 Barium (Ba) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
5 Beryllium (Be) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
6 Cadmium (Cd) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
7 Chemical Oxygen Demand (COD) EPA 410.4 mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
8 Cobalt (Co) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
9 Copper (Cu) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
10 Dieldrin: DDT, DDD, DDE EPA 608 ug/L Grab Govt Storm water collection system inlet / discharge pumping station.
11 Iron (Fe) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
12 Lead (Pb) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
13 Molybdenum (Mo) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
14 Nickel (Ni) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
15 Oil and Grease EPA 1664 mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
16 pH SM4500H+B number Grab Govt Storm water collection system inlet / discharge pumping station.
17 Purgeable Halocarbons and Aromatics
EPA 624 ug/L Grab Govt Storm water collection system inlet / discharge pumping station.
18 Silver (Ag) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
19 Specific Conductance EPA 120.1 or
SM5310
umhos/cm Grab Govt Storm water collection system inlet / discharge pumping station.
20 Thallium (Tl) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
21 Chromium (Total Cr) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
22 Carbon (Total Organic C) SM 5310 mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
23 TRPH EPA 1664 mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
24 TEPH EPA 8010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
25 Total Suspended Solids SM 2540D mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
26 Vanadium (V) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
27 Zinc (Zn) EPA 6010B mg/L Grab Govt Storm water collection system inlet / discharge pumping station.
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.14 Samples Collection - Storm Water Monitoring Program. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor shall provide labeled sample containers. 6. Label shall indicate sampling location and constituents. 7. Contractor will be notified by the COR of any sampling requirement. 8. Samples must be picked-up within 4 business hours during regular business hours Monday - Friday (no holidays) following notification. 9. A sampling station shall be established at the storm water collection system inlet. 10. Samples shall be collected at the beginning of the first significant storm (greater than 1/2 inch precipitation) of the rainy season. 11. Subsequent sampling will be taken from the storm water discharge pumping station as determined and requested by the COR.
Tests_On-Call
File details come from the government source that posted it. Updated .