Attachment 5 - DDJC Water Testing COSR.pdf

PDF 2 MB Posted

Attached to
Water Testing - San Joaquin Federal contract opportunity
Solicitation number
SP330022Q5002
Issued by
Defense Logistics Agency Distribution

About this file

This document is a contract oversight surveillance report for water testing laboratory services provided to the Defense Logistics Agency Distribution facility in San Joaquin, California. The report covers the contract performance period and includes evaluation of the service provider's adherence to environmental, safety, and occupational health requirements through direct observation and customer complaint validation. Details provided indicate the service provider's performance was conforming with no outstanding issues, though no further performance ratings or contractor identification are included in this template report.

View the file

Other files for this federal contract opportunity

Other files attached to Water Testing - San Joaquin, newest first.
File Type Posted
SF30 Amendment 0001.pdf PDF
Attachment 7 - Lab Field Test List-SW_corrections.pdf PDF
Attachment 7 - Water Sampling Tests.pdf PDF
Attachment 4 - Lab ELAP Quals List.pdf PDF
Attachment 6 - DDJC Water Testing APL Report.pdf PDF
Tab C-1 Combined Synopsis.pdf PDF
Attachment 2 - Wage Determination.pdf PDF
Attachment 1 SOW - Water Smpg Tstg Anlys Svcs - DDJC.pdf PDF
Attachment 3 - Schedule of Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Contract Oversight Surveillance Report

1. Contract # / Service

2. Contract Location

3. Contract Performance Period

4. Evaluation Period

5. Contract Service Provider

6. Method(s) of Surveillance (check all that apply for this surveillance period) Requirement Surveillance Comments

Surveillance Methods Described -

- Direct Observation is the visual examination of processes and procedures by an evaluator who is physically present and watching individuals actually performing the work to determine whether the processes conform to the requirements.

- Random Sampling is correctly performed by selecting a statistically significant number of samples from a lot where all members of the lot have the same chance of being selected. Random Sampling is used to reduce the time and effort of validating conformance to requirements when a definable lot of significant size exists.

- 100% Inspection method evaluates all outputs of a particular requirement. Every item in a lot is evaluated for all or some of the characteristics in the specification. (Recommend if Lot Size is 25 or less)

- Validated Customer Complaints are customer complaints that prove to be valid upon subsequent investigation. They can be used as a trigger for conducting surveillances, and are included as a part of the surveillance report. When a valid complaint is received and included in a surveillance activity, strongly consider scheduling targeted follow up surveillance to ensure the problem has been corrected. These can prompt corrective actions, preventative action plans, and performance improvement plans.

7. Overall Surveillance Evaluation

8. Additional Comments / Notes to the Contracting Officer (Either positive or negative)

9. COR/TPOC Certification - I certify that the supplies or services provided by the Service Provider under the terms and conditions of this contract, have been received and accepted unless otherwise noted on this surveillance report.

Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments Requirement Surveillance Comments 10.0.2.20120224.1.869952.867557

TextField1: COMPLETE LABORATORY SAMPLING, TESTING, AND ANALYSIS SERVICES
TextField4: DLA Distribution San Joaquin CA (DDJC)
TextField2:
DateField1:
DateField2:
TextField3:
DirectObservation: 0
RandomSampling: 0
Inspection: 0
Complaint: 0
Other: 0
Other_Field:
Requirement: 1. Groundwater Sampling and Analysis Plan (GSAP)

Is the SP developing and submitting a detailed written description of standard operating procedures (SOP) to be used as a guidance document used as reference by technicians responsible for conducting groundwater monitoring and sampling activities? (Annually)

Requirement: 2. Is the the SP providing Weekly Samples Collection: Domestic Sewage Treatment Plant, Influent Monitoring (DSTPIM) IAW the SOW and SOP?
Requirement: 3. Is the the SP providing Samples Collection: Domestic Sewage Treatment Plant, Effluent Monitoring (DSTPEM) IAW the SOW and SOP?
Requirement: 4. Is the the SP providing Bi-Weekly Samples Collection: Elevated Tank Monitoring (ETM) IAW the SOW and SOP?
Requirement: 5. Is the the SP providing Bi-Weekly Samples Collection: Potable Water Supply Monitoring - Bacteria (PWSMB) IAW the SOW and SOP?
Requirement: 6. Is the the SP providing Monthly Samples Collection: Potable Water Supply Monitoring - Bacteria (PWSMB) IAW the SOW and SOP?
Requirement: 7. Is the the SP providing Quarterly Samples Collection: Potable Water Supply Monitoring (PWSM) IAW the SOW and SOP?
Requirement: 8. Is the the SP providing Quarterly Samples Collection: Ground Water Monitoring (GWM) IAW the SOW and SOP?
Requirement: 9. Is the the SP providing Annual Samples Collection: Potable Water Supply Monitoring - Volatile Organic Compounds (VOCs) (PWSM-VOCs) IAW the SOW and SOP?
Requirement: 10. Is the the SP providing Annual Samples Collection: Potable Water Supply Monitoring - Disinfection By-Products (PWSM-DBP) IAW the SOW and SOP?
Requirement: 11. Is the the SP providing On-Call Samples Collection: System Resampling Program - Wells (SRPW) IAW the SOW and SOP?
Requirement: 12. Is the the SP providing On-Call Samples Collection: System Resampling Program - Distribution System (SRPDS) IAW the SOW and SOP?
Requirement: 13. Is the the SP providing On-Call Samples Collection: Disinfection Verification Program (DVP) IAW the SOW and SOP?
Requirement: 14. Is the the SP providing On-Call Samples Collection: Sludge Monitoring Program (SMP) IAW the SOW and SOP?
Requirement: 15. Is the the SP providing On-Call Samples Collection: Storm Water Monitoring Program (SWMP) IAW the SOW and SOP?
Requirement: 16. Did the SP establish and maintaining a complete Quality Control Plan to ensure the requirements of the contract are provided as specified?
Requirement: 17. Did the SP establish and is adhering to their Environmental, Safety, and Occupational Health Plan?
SurveillanceComments:
Conforming:
Nonconforming:
Outstanding: 0
VeryGood: 0
TextField5:
SignatureField1:
SignatureField2:

File details come from the government source that posted it. Updated .