This document is an amendment to a solicitation for distribution and warehousing services at DLA Distribution Cherry Point in North Carolina. Amendment 0002 incorporates revised documents including attachments J.1, J.2, J.16, J.19, J.26, J.28, J.38, and J.41 as well as CDRLs A006, A009, A010, and A028. Additional questions from industry are answered and the current contract phase-out requirements are provided as an attachment. Offerors must acknowledge receipt of the amendment by the specified date and time in order to be considered for award of the contract for distribution and warehousing services to be administered by Defense Logistics Agency Distribution.

SP3300-19-R-5003 Amendment 0002

View the file

Other files

File Type Posted
SP3300-19-R-5003_Amendment_0003.pdf PDF
RFP_SP3300-19-R-5003_Sections_B_-_M_6.19.19.docx DOCX document
RFP_SP3300-19-R-5003_Sections_B_-_M_6.19.19_(Tracked_Changes).docx DOCX document
Amendment_3_Q&As.xlsx XLSX spreadsheet
Attachment_J.26_TE_5.0_APLs__Amend_2.doc DOC document
Attachment_J.2_Amend_2.docx DOCX document
A006_-_Quality_Control_Plan.pdf PDF
RFP_SP3300-19-R-5003_Sections_B_-_M_6.14.19.docx DOCX document
Attachment_J.38,_Proposed_Productive_Hours.xlsx XLSX spreadsheet
A028_-_Floor_to_Book_Report_(Portfolio).pdf PDF
Attachment_J.41,_Limitation_on_Subcontracting_Report.xls XLS spreadsheet
Amendment_2_Q&As.xlsx XLSX spreadsheet
A010_-_Monthly_Cost_Report_for_FPIF_CLIN_X001.pdf PDF
Attachment_J.38,_Proposed_Productive_Hours_(Tracked_Changes).xlsx XLSX spreadsheet
Attachment_J.26,_TE_5.0_APLs__Amend_2_(Tracked_Changes).doc DOC document
Current_Contract_Phase-Out_Requirement.docx DOCX document
Attachment_J.28_TE_5.2_Projected_Workload_(JCD)_201900517.xlsx XLSX spreadsheet
Attachment_J.16,_TE_3.2_Government_Training_(5-17-19).docx DOCX document
RFP_SP3300-19-R-5003_Sections_B_-_M_6.14.19_(Tracked_Changes).docx DOCX document
A009_-_Management_Plan_(MCCP).pdf PDF
Attachment_J.1_Amend_2_(Tracked_Changes).docx DOCX document
Attachment_J.2_Amend_2_(Tracked_Changes).docx DOCX document
Attachment_J.19,_TE_3.5_GE_Misc_Equipment.xlsx XLSX spreadsheet
Attachment_J.1_Amend_2.docx DOCX document
Attachment_J.28_TE_5.2_Projected_Workload_(JCD)_20190517_(Tracked_Changes).xlsx XLSX spreadsheet
Attachment_J.16,_TE_3.2_Government_Training_(5-17-19)_(Tracked_Changes).docx DOCX document
SP3300-19-R-5003_Amendment_0001.pdf PDF
SP3300-19-R-5003_Pre-Proposal_Conference_Roster.pdf PDF
DDCN_PPC_Slides_(5-1-19)_FINAL.pptx PPTX presentation
Attachment_J.5,_DD254.pdf PDF
Attachment_J.6,_CLIN_X006_Labor_Rate_Table.xlsx XLSX spreadsheet
Attachment_J.40,_Draft_DDCN_Dist_Ops_Training_Schedule.xlsx XLSX spreadsheet
Attachment_J.11,_CDRLs.zip ZIP file
RFP_SP3300-19-R-5003.pdf PDF
Attachment_J.42,_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.39,_Training_Plan.xlsx XLSX spreadsheet
Notice_Regarding_Resticted_Access.docx DOCX document
Attachment_J.9,_Contractor_Equipment_List.xlsx XLSX spreadsheet
Attachment_J.2,_DDCN_Site_Specific_Requirements.docx DOCX document
Attachment_J.12_-_J.37,_Technical_Exhibit_(TE).zip ZIP file
Attachment_J.41,_Limitation_on_Subcontracting_Report.xls XLS spreadsheet
Attachment_J.3,_Collective_Bargaining_Agreement_Through_8.31.21.pdf PDF
Attachment_J.38,_Proposed_Productive_Hours.xlsx XLSX spreadsheet
Attachment_J.1,_PWS.docx DOCX document
Attachment_J.4,_Wage_Determination_12.26.18.pdf PDF
DDCN_Preproposal_Conference_Instructions.docx DOCX document
DDCN_Preproposal_Conference_Instructions.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

DLA Distribution Acquistion Operations (J7) 430 Mifflin Ave., Suite 3102A New Cumberland, PA 17070-5008 POC: Jason Taylor, 717-770-7740, Jason.1.Taylor@dla.mil

SP3300-19-R-5003

Amendment 0002

1. Amendment 0002 is hereby incorporated into Request for Proposal SP3300-19-R-5003 and shall become a part of any resultant contract.

2. Offerors are advised to review all revised documents closely as changes were also incorporated that were not a result of questions received from industry

3. Questions from Industry and Government Responses have been provided with this amendment.

The questions provided are exactly as received. The Government made no changes to the questions.

4. The current contract phase-out requirement is being provided as an attachment to the Questions from Industry in response to question 39.

5. A revised section B through M of the Request for Proposal has been provided. A revised section B through M with tracked changes has also been provided for informational purposes.

6. The following attachments have been revised: J.1, J.2, J.16, J.19, J.26, J.28, J.38, and J.41. The revised versions of these documents have been provided with this amendment.

7. The following CDRLs have been revised: A006, A009, A010, and A028. The revised versions of these documents have been provided with this amendment.

8. The following files have been uploaded to www.fbo.gov on a restricted basis.

a. 65 DLA_Distribution ISS SOP – June 17 2016

End of Amendment 0002

SF-30 SP3300-19-R-5003 Amendment 0002
Amendment Page 2
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0002
Code[0]: SP3300
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]:

See continuation page.

FacilityCode[0]:
Code[2]:
IssuedBy[0]:
NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: SP3300-19-R-5003
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 06/14/2019
Dated9B[0]: 04/18/2019
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .