Amend_0002.pdf
PDF 45 KB Posted
- Solicitation number
- SP3300-16-Q-0208
- Issued by
-
Defense Logistics Agency Distribution
About this file
Amendment 0002 provides answers to questions posed by potential offerors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_0003.pdf | ||
| AMEND_0001.pdf | ||
| Attach_3_-_Maint_Task_Codes.xlsx | XLSX spreadsheet | |
| Attach_5_-_Wage_Determination.pdf | ||
| Attach_6_Certification_of_Offeror_Accounting_System.doc | DOC document | |
| Attach_4_-_Work_Order.pdf | ||
| Attach_2_-_Equip_Invent_List-revised.xlsx | XLSX spreadsheet | |
| Attach_1_-_PWS.pdf | ||
| Attach_8_-_Supplies_Services.xlsx | XLSX spreadsheet | |
| Attach_7_-_Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 5
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
06/13/2016
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP3300 7. ADMINISTERED BY (If other than Item 6) CODE
DLA DISTRIBUTION J7
2001 MISSION DRIVE
NEW CUMBERLAND, PA 17070
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION
NO.
SP3300-16-Q-0208
9B. DATED (SEE ITEM 11)
06/02/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Preventative and Remedial Maintenance of Automated Material Handling Systems and Ancillary Equipment at DLA Distribution Pearl Harbor, HI.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT 0002
The purpose of this amendment is to answer questions regarding the solicitation. Questions and answers are provided below.
Question 1: How are these services currently being performed? Under contract? In-house?
Answer: These services are currently being provided under contract.
Question 2: Who is the Contractor?
Answer: The contractor currently performing is Bastian Solutions.
Question 3: What is the contract number?
Answer: SP3300-16-M-0881
Question 4: When does the contract expire?
Answer: The current contract ends June 30, 2016
Question 5: What is the current contract value?
Answer: $210,175.00
Question 6: Is there a page limitation for the Technical Volume?
Answer: No.
Question 7: Is a walkthrough or site visit planned for this requirement?
Answer: No. The required performance start date makes a site visit impractical.
Question 8: Will DCAA provide a list of acceptable accounting systems?
Answer: No. The offeror’s accounting system must meet the requirements of DFARS 252.242-7006.
Offeror’s are required to self-certify that their accounting system meets those criteria as defined in paragraph (c). The Clause is provided in full text below.
252.242-7006 Accounting System Administration.
As prescribed in 242.7503, use the following clause:
ACCOUNTING SYSTEM ADMINISTRATION (FEB 2012)
(a) Definitions. As used in this clause—
(1) “Acceptable accounting system” means a system that complies with the system criteria in paragraph (c) of this clause to provide reasonable assurance that—
(i) Applicable laws and regulations are complied with;
(ii) The accounting system and cost data are reliable;
http://www.acq.osd.mil/dpap/dars/dfars/html/current/242_75.htm
A MENDMENT 0002
(iii) Risk of misallocations and mischarges are minimized; and
(iv) Contract allocations and charges are consistent with billing procedures.
(2) “Accounting system” means the Contractor’s system or systems for accounting methods, procedures, and controls established to gather, record, classify, analyze, summarize, interpret, and present accurate and timely financial data for reporting in compliance with applicable laws, regulations, and management decisions, and may include subsystems for specific areas such as indirect and other direct costs, compensation, billing, labor, and general information technology.
(3) “Significant deficiency” means a shortcoming in the system that materially affects the ability of officials of the Department of Defense to rely upon information produced by the system that is needed for management purposes.
(b) General. The Contractor shall establish and maintain an acceptable accounting system.
Failure to maintain an acceptable accounting system, as defined in this clause, shall result in the withholding of payments if the contract includes the clause at 252.242-7005, Contractor Business Systems, and also may result in disapproval of the system.
(c) System criteria. The Contractor’s accounting system shall provide for—
(1) A sound internal control environment, accounting framework, and organizational structure;
(2) Proper segregation of direct costs from indirect costs;
(3) Identification and accumulation of direct costs by contract;
(4) A logical and consistent method for the accumulation and allocation of indirect costs to intermediate and final cost objectives;
(5) Accumulation of costs under general ledger control;
(6) Reconciliation of subsidiary cost ledgers and cost objectives to general ledger;
(7) Approval and documentation of adjusting entries;
(8) Management reviews or internal audits of the system to ensure compliance with the Contractor’s established policies, procedures, and accounting practices;
(9) A timekeeping system that identifies employees’ labor by intermediate or final cost objectives;
(10) A labor distribution system that charges direct and indirect labor to the appropriate cost objectives;
(11) Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account;
(12) Exclusion from costs charged to Government contracts of amounts which are not allowable in terms of Federal Acquisition Regulation (FAR) part 31, Contract Cost Principles and Procedures, and other contract provisions;
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252242.htm
(13) Identification of costs by contract line item and by units (as if each unit or line item were a separate contract), if required by the contract;
(14) Segregation of preproduction costs from production costs, as applicable;
(15) Cost accounting information, as required—
(i) By contract clauses concerning limitation of cost (FAR 52.232- 20), limitation of funds (FAR 52.232-22), or allowable cost and payment (FAR 52.216-7); and
(ii) To readily calculate indirect cost rates from the books of accounts;
(16) Billings that can be reconciled to the cost accounts for both current and cumulative amounts claimed and comply with contract terms;
(17) Adequate, reliable data for use in pricing follow-on acquisitions; and
(18) Accounting practices in accordance with standards promulgated by the Cost Accounting Standards Board, if applicable, otherwise, Generally Accepted Accounting Principles.
(d) Significant deficiencies. (1) The Contracting Officer will provide an initial determination to the Contractor, in writing, of any significant deficiencies. The initial determination will describe the deficiency in sufficient detail to allow the Contractor to understand the deficiency.
(2) The Contractor shall respond within 30 days to a written initial determination from the Contracting Officer that identifies significant deficiencies in the Contractor's accounting system. If the Contractor disagrees with the initial determination, the Contractor shall state, in writing, its rationale for disagreeing.
(3) The Contracting Officer will evaluate the Contractor's response and notify the Contractor, in writing, of the Contracting Officer’s final determination concerning—
(i) Remaining significant deficiencies;
(ii) The adequacy of any proposed or completed corrective action;
and
(iii) System disapproval, if the Contracting Officer determines that one or more significant deficiencies remain.
(e) If the Contractor receives the Contracting Officer’s final determination of significant deficiencies, the Contractor shall, within 45 days of receipt of the final determination, either correct the significant deficiencies or submit an acceptable corrective action plan showing milestones and actions to eliminate the significant deficiencies.
(f) Withholding payments. If the Contracting Officer makes a final determination to disapprove the Contractor’s accounting system, and the contract includes the clause at 252.242-7005, Contractor Business Systems, the Contracting Officer will withhold payments in accordance with that clause.
(End of clause)
(Revised December 31, 2012) http://www.acq.osd.mil/dpap/dars/dfars/html/current/252242.htm
File details come from the government source that posted it. Updated .