About this file

Amendment 0002 - SP330016Q0195

View the file

Other files

File Type Posted
Amendment_4_Attachment_2_Equip_List_revised.xls XLS spreadsheet
Amendment_4-Attachment_1_-_PWS-16Q0195.docx DOCX document
Amendment_4_SP330016Q0195.pdf PDF
Amendment_3_SP330016Q0195.pdf PDF
Amendment_1_SP330016Q0195.pdf PDF
Attachment_8_Certification_of_Offeror_Accounting_System_16Q0195.doc DOC document
Attachment_5-TE_1.1__Contractor_Personnel_Security_.docx DOCX document
Attachment_7_Schedule_of_Supplies-16Q0195.xlsx XLSX spreadsheet
Attachment_2_-_Equipment_List.xls XLS spreadsheet
Attachment_9-Past_Performance_Questionnaire_16Q0195.docx DOCX document
RFQ_SP330016Q0195.docx DOCX document
Attachment_4_DoL_Wage_16Q0195.pdf PDF
Attachment_1_-_PWS-16Q0195-FBO.docx DOCX document
Attachment_3_-Maint_Task_List.docx DOCX document
Attachment_6-_TE_1.2_CAC_Procedures.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3300-16-Q-0195

Amendment 0002

The following questions have been submitted from industry regarding solicitation SP3300-16-Q-0195. Each question has been redacted to ensure anonymity. The Government response is provided in the far right-hand column for each question.

Question Government Response

1. What does this cover?

Firm-Fixed-Price Contractor Manpower Reporting 1 YR $0.00 $0.00

The Contractor shall report all Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Logistics Agency via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address:

http://www.ecrmra.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year (refer to Attachment 1 – Performance Work Statement, Page 14)

2.

In reviewing attachment for “Maintenance Task List #003” there is a list of buildings designating where task is to be performed.

Will this be addressed as to all other “Maintenance Task Lists”?

No; however, here are the buildings for the following equipment:

Buildings for ESS – 109,110,163,164,171,175,176,191,2023 and 2028

Buildings for cameras – 110, 171,175 ,191 and

Buildings for key boxes- 110,175 and 191

Buildings for Aiphones- 110 and 191

Building for Duress- 110

SP3300-16-Q-0195

Amendment 0002

Question Government Response

3.

On Attachment 2

RTV / SMP panels 3B comm Control Panel Lenel RTV/ SMP Panels for Lenel circuit boards and batteries. Area 4.

Qtrly

Is this in bldg 110 and if so what floor?

Yes, this is Building 110 area 4 and it is on the first floor

4. Concerning the testing of the BMSs, will we be allowed to close the doors to check on the magnet located on the door?

Yes, opening and closing doors are fine

5. Will payment be by WAWF? Yes

6. As this is a SCA project is there a wage determination for a helper? Same as Attachment 4, DoL Wage Determination

7. Is it the intention of the RFQ for a full time technician to be on-site, or is this only for part time support?

The intent is for a Contractor to provide preventive maintenance (PM) and remedial maintenance (RM) services based on the equipment list provided as Attachment 2 to the solicitation.

8. If full time support is required, is there an existing technician currently maintaining the systems?

No

9. PWS materials and equipment paragraph 7.8.5 states “The Contractor shall maintain sufficient off-the-shelf materials and equipment on hand to support service call work requirements. Lack of availability of materials or equipment shall not relieve the Contractor from the requirement to complete service call work within the time limits specified above.” Is there currently a sufficient spare parts inventory on site to cover this requirement?

No

10. Notice to Offerors paragraph 6 states “The Wage Grade equivalent to this position is as follows: Electrical Installation and Maintenance Electrician = $19.32 per hour (WG-2805-8)”. It appears the work description and rate should be for an Electronics Technician Maintenance III, which is $25.41 per hour, and not an electrician. Which rate is correct?

The data is provided for informational purposes only and is not a Wage Determination.

File details come from the government source that posted it. Updated .