TE 5.1-APLS.docx

DOCX document 29 KB Posted

Attached to
Contractor-Owned/Contractor-Operated (COCO) storage and distribution capability within Kuwait
Solicitation number
SP330010R0020
Issued by

About this file

TE 5.1

View the file

Other files

File Type Posted
TE 5 2- Projected Workload revised 5-17-10.docx DOCX document
SF30.pdf PDF
Attachment 1_Word table 14 May 10.docx DOCX document
TE 3.6 Government-Furnished Training.doc DOC document
SF30.pdf PDF
Section B 14 MAY 2010 rev 1.doc DOC document
Attachment J 2 rev —
TE 1.1 Timeline for Start-Up and Phase-In Activities - 14 May 10 —
Attachment 1_Word table 04 May 10 Final.docx DOCX document
TE 3 1 GFE MHE.docx DOCX document
SF30 iwith page 2.pdf PDF
TE 4 1-Contractor-Furnished Training.doc DOC document
Master List of Q and A doc 5 MAY 2010 doc.doc DOC document
SF30.pdf PDF
Standard Form 30 pages 1 and 2 27 April 2010.pdf PDF
Attachment J.2 27 April for amend 001 J 2.docx DOCX document
Attachment 1_Word table 27 APR 10 Final.docx DOCX document
TE 3 2-GFE Misc Equip 27 April 2010.xls XLS spreadsheet
Atch J-3 Facility Progress Assessment Checklist 27 April 2010.doc DOC document
Conformed Sections B through M 27 April 2010.pdf PDF
TE 3 2 A GFE Misc under 300 value 27 April 2010.xls XLS spreadsheet
TE 3 1 GFE MHE 27 April 2010.docx DOCX document
TE 1 3 Current Snapshot DLA NSN 27 April 2010.xlsx XLSX spreadsheet
DDKS Final Q and A doc 27 APR 2010.doc DOC document
DDKS Pre-Proposal Briefing Slides 12 APR 2010 1330hrs —
Preproposal Conference Attendance List 12 APR 2010.xls XLS spreadsheet
SP330010R0020 A -M 25 MAR 2010.pdf PDF
TE 5.6 Instructions for Processing Open MROs 1 .pdf PDF
TE 4.1-Contractor-Furnished Training.doc DOC document
TE 3.6 Government-Furnished Training.doc DOC document
TE 3.3-GFE Office Equipment.xls XLS spreadsheet
TE 4.2-MHE PM Task Codes.xls XLS spreadsheet
TE 5.3-Contractor DSS Load and Maintain.doc DOC document
TE 3.4 GFE-IT.docx DOCX document
TE 1.5 Current Snaoshot AJ2.xlsx XLSX spreadsheet
TE 1.3 Current Snapshot DLA NSN.xlsx XLSX spreadsheet
TE 3.2-GFE Misc. Equip.xls XLS spreadsheet
TE 5.7 DSS Downtime.docx DOCX document
Attachment J1.doc DOC document
TE 1.6 Controlled Climate Storage.xlsx XLSX spreadsheet
TE 5.4 WPM Guidance for OCONUS Depots.docx DOCX document
TE 5 2- Projected Workload.docx DOCX document
TE 3.1 GF MHE.docx DOCX document
TE 4.3- Equipment for Phase-In.doc DOC document
TE 6.1-Gov Forms.doc DOC document
TE 3.7 Computer Room construction.doc DOC document
TE 1.2-IT Eligibility RequirementsL for DSS Access.docx DOCX document
TE 4.4- Equipment for Full Performance.doc DOC document
TE 1.4 Current Snaoshot AMC.xlsx XLSX spreadsheet
TE 1.1 Timeline for Start-Up and Phase-In Activities.ppt PPT presentation
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-10-R-0020

TECHNICAL EXHIBIT 5.1

ACCEPTABLE PERFORMANCE LEVELS (APLS)

5.2 RECEIVING

TIMELINESS

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE

Receipt Processing

– NP and Retail Receipts

Tailgate/Turn-in to Stow and post to accountable record in one (1) day or less average
≤ 1 day average each month

(DSS-MIS Data Element 10117) NP and retail receipt lines received per month (DSS-MIS Data Element 10102)

Receipt Processing-NP and Retail Receipts Stowed On Time
Tailgate/Turn-in to Stow and post to accountable record in one (1) day
>85% of receipts stowed on time against one (1) day standard

(DSS-MIS Data Element 10118) % of NP and retail receipts received per month (DSS-MIS Data Element 10102)

Receipt Processing – Wholesale Serviceable Returns
Tailgate/Turn-in to Stow and post to accountable record in three (3) days or less average
≤ 3 days average each month

(DSS-MIS Data Element 10817) Wholesale returns received per month (DSS-MIS Data Element 10802)

Receipt Processing-NP and Retail Receipts Stowed On Time
Tailgate/Turn-in to Stow and post to to accountable record in one (1) day
>85% of receipts stowed on time against one (1) day standard

(DSS-MIS Data Element 10118) % of NP and retail receipts received per month (DSS-MIS Data Element 10102)

Receipt Processing – Redistributions
Tailgate/Turn-in to Stow and post to accountable record in three (3) days or less average
≤ 3 days average each month

(DSS-MIS Data Element 11317) Redistribution lines received per month (DSS-MIS Data Element 11302)

Receipt Processing – Redistributions
Tailgate/Turn-in to Stow and post to accountable record in three (3) days
>85% of redistributions stowed on time against three (3) days standard (DSS-MIS Data Element 11318)
Redistribution lines received per month (DSS-MIS Data Element 11302)

5.4 PHYSICAL INVENTORY CONTROL STANDARDS

QUALITY

ACTIVITY
STANDARD
APL
MEASUREMENT

UNIVERSE

TPIC N Category A – Unit Price > $1,000
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
99% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Semi-annual

TPIC N Category B – Unit of Issue not equal to each or on hand balance greater than 50 and extended value less than $50,000 or NSN activity greater than 50
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a 10% Tolerance on the count variance
95% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Semi-annual

TPIC N Category C – Date of Last Inventory > 24 months and on hand balance < 50
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a 5% Tolerance on the count variance
95% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Semi-annual

TPIC N Category D – Other
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
95% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Semi-annual

Location Accuracy
Physical material in location by NSN, Shelf-Life, CC, and Unit of Issue match storage activity locator records
99.5% Accuracy
Number of location surveys completed per month; DSS Report: YE6Z

5.5 ISSUE

QUALITY

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE
Issue Material
Material shipped is the correct item, quantity, and CC and shipped to the right customer
> 99.2

Monthly ISDR Report Valid complaints per month as a % of MROs/DROs

Warehouse Fill Rate (DSS) (Denial Rate)

The right quantity, condition and item is located to fill the MRO and CC
> 99.5%

(100 minus the DSS-MIS Data Element 26330) MROs per month (Excluding Denial Management Code 3 (Shelf Life))

5.5 ISSUE

TIMELINESS *

ACTIVITY
STANDARDS
APL
MEASUREMENT UNIVERSE
MRO High Priority -Wholesale/Retail (Excluding Dedicated Trucks)
Receipt of MRO at the Distribution Center to ship in one (1) day or less average
<1 day average each month (DSS-MIS Data Element 22367
High priority lines issued per month (DSS-MIS Data Element 22365)
MRO Routine Priority - Wholesale/Retail (Excluding Dedicated Trucks)
Receipt of MRO at the Distribution Center in three (3) days or less average
<3 days average each month (DSS-MIS Data Element 22375
Routine priority lines issued month (DSS-MIS Data Element 22373)
MRO High Priorities - Wholesale/Retail (Excluding Dedicated Trucks)
Receipt of MRO at the Distribution Center to ship in one (1) day or less
> 85% of Hi Pri MROs on time against one (1) day

(DSS-MIS Data Element 22370) High priority lines issued per month (DSS-MIS Data Element 22365)

MRO Routines - Wholesale/Retail (Excluding Dedicated Trucks)
Receipt of MRO at the Distribution Center to ship in three (3) days or less
> 85% of Routine MROs on time against three (3) days

(DSS-MIS Data Element 22378) Routine lines issued per month. (DSS-MIS Data Element 22373)

RDO Routines - Wholesale/Retail
Receipt of RDO at Distribution Center to ship in three days or less average
< 3 day average each month (DSS-MIS Data Element 20775)
Routine lines issued per month (DSS-MIS Data Element 20773)
RDO Routines – Wholesale/Retail
Receipt of RDO at Distribution Center to ship in three (3) days or less
>85% of RDOs shipped on time against a three (3) day Standard (DSS-MIS Data Element 20778)
Routine lines issued per month (DSS-MIS Data Element 20773)

5.7 THEATER CONSOLIDATION SHIPPING POINT (TCSP) STANDARDS

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE

Offer to Transportation - Surface Pallets Loose Pallet positioned and ready for shipment to consignee

< 72 hours (DSS-MIS Data Element: 75030

Pallets arriving at DDKS per month (DSS-MIS Data Element 75026)

Offer to Transportation - Containers Stuffed on-site Mixed
Container positioned and ready for shipment to consignee

< 72 hours (DSS-MIS Data Element 75035)

Containers arriving at DDKS (DSS-MIS Data Element 75031)

Offer to Transportation - Through Put Containers Pure Container positioned and ready for shipment to consignee

< 24 hours (DSS-MIS Data Element 75010)

Containers arriving at DDKS per month (DSS-MIS Data Element 75006)

TE 5.1 APL