TE 4.3- Equipment for Phase-In.doc
DOC document 159 KB Posted
- Attached to
- Contractor-Owned/Contractor-Operated (COCO) storage and distribution capability within Kuwait
- Solicitation number
- SP330010R0020
- Issued by
-
Defense Logistics Agency Distribution
About this file
TE 4.3
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP3300-10-R-0020
TECHNICAL EXHIBIT 4.3
EQUIPMENT for Phase-In Period (4 months)
| Miscellaneous equipment leases/purchase due to GFE not available the first 4 months |
| Quantity |
| Camera, Digital |
| 2 |
| Containment Pallet low profile |
| As required |
| Charger, Battery MHE |
| As required |
| Dispenser, Nylon Strap, 20 CM Dia |
| As required |
| Saw, Band 200mm, 2SP |
| 1 |
| Saw, Double Bevel Miter |
| 1 |
| Scale, Counting, Digital 15 KG |
| As required |
| Scale Weighing, floor |
| As required |
| Scale Weighing, Digital Platform |
| As required |
| Spill Pallets, Drum 66 gallon |
| As required |
| Steel Ramp for Dock levelers |
| As required |
| Strapping Machine |
| As required |
| Strapping Machine. Steel (Trolley/Crimper) |
| As required |
| Stretch wrapping machine (Semi-Automatic) |
| As required |
| Tensioner Nylon Strap |
| As required |
| Nailer Machine, Cordless |
| As required |
| Over pack, 95 gallon |
| As required |
TE 4.3 –Equipment for Phase-In Period
_1330177479.xls DDKS IHGE Totals
DDKS DDKS In-House Government Estimate
PERFORMANCE PERIOD 1 - 7 mo PERFORMANCE PERIOD 2 OPTION YEAR 3 5 Months Phase-In PERFORMANCE PERIOD 1 - 12 mo NOTES
DIRECT LABOR FTE 289 397
Mgt FTE 14 15
Direct Labor Cost (Base Rate) $ 1,825,887 $ 4,712,746
Mgt (Base Rate) $ 765,216 $ 602,304
Total Direct Labor $ 2,591,103 $ 5,315,050
Overhead Including Fringe Benefits of Direct Labor. Total Fringe and Overhead 45% $ 1,165,996 $ 2,391,772
Sub Total $ - 0 $ - 0 $ 3,757,099 $ 7,706,822
General and Admin Rate of 25% $ - 0 0 939,275 $ 1,926,706
Sub Total $ - 0 0 4,696,374 $ 9,633,528
Fee @ 10% $ - 0 0 469,637 $ 963,353
Total Labor and All Fees $ - 0 0 5,166,012 $ 10,596,880
OTHER DIRECT COSTS
Materials, Supplies, Services $ 5,200,965 $ 2,006,655 $ 4,815,980
Materials Escalation @ 2.06% $ - 0 0 107,140 41,337 $ 99,209
Total Material Costs $ - 0 0 5,308,105 2,047,992 $ 4,815,980
Material Handling Rate @ 5.5% $ - 0 0 291,946 112,640 $ 264,879
Total Material & MH $ - 0 0 5,600,051 2,160,632 $ 5,080,859
MHE & Equipment Maintenance
MHE 1,126,454 $ 1,126,454
Escalation @ 2.91% $ - 0 32,780 $ 32,780
Total MHE & Escalation 1,159,234 $ 1,159,234
MHE Replacement Costs $ - 0 $ - 0 $ - 0
Contractor Provided Training, Ref T.E. 4.1 $ 178,686 $ 189,760
Travel $ 50,000 $ 100,000
Leased Equipment $ 522,597
Defense Base Act Insurance $ 50,000 $ 50,000
Lease - Office Space $34,671
Lease - Warehouse Space $11,715,228
Lease - Outdoor Space $2,579,125
IT Services $193,163
Personnel Services $1,195,127
Sub-Contracts for Equip Maint $70,516
Sub-Contracts for Trans Servs $477,267
SUB-TOTAL $17,127,454
PP 1 PP 2 PP 3 Total 12 Months
Total For Each PP $ - 0 $ - 0 $ - 0 $ 32,805,193
PHASE-IN (5 months) Total 7 Months
Warehouse Prep (includes Racks) $ 4,000,000 $ 19,136,363
Outside Storage Prep $ 1,000,000
Leased Indoor Space $ 4,808,369
Leased Office Space $ 14,446
Leased Outdoor Space $ 1,074,635
Leased Equipment $ 933,433
Phase-In Labor $ 4,415,367
Personnel Services (Accomodations, Background Checks, Transportation $ 1,195,123
Sub-Contracts - Equip Maint $ 29,382
Sub-Contracts - Trans Servs $ 198,862
IT Services $ 80,485
Material & Supplies $ 2,117,025
Phase-In Estimate - $595K Equip/$434 Labor $ 19,867,126 Transition Costs Exclusive of Movement to New Facility Total Base $ 39,003,489
I/We certify that this Independent Government Estimate (IGE) was prepared solely by cognizant Government employee(s), independent of and without the direct or indirect involvement of any existing or prospective Government Contractor. The information cont
SIGNATURE ______________________________________________________
DATE ______________________
MHE Costs
MHE REQUIREMENTS
40K NSN - Phase-In 5 months
Quantity Month/Each Total
FLATBEDS 4EA 4 $9,246.58 $443,835.60
CONTAINER HANDLER 1EA 1 $1,019.86 $48,953.40
STOCK SELECTORS 12EA 12 $1,204.11 $57,797.28
ELECTRIC PT TRK 8EA 8 $183.56 $8,810.80
10 TON F/L 1EA 1 $240.40 $11,539.02
ELECTRIC F/L 8EA 8 $503.94 $24,189.12
Total $595,125.22
2nd Year Leases
Equipment due to GFE not available and normal equipment requirements Quantity Month/Each Total 5 Month Phase-In
CB for container 2.0 tons 1 $463.01 $2,315.05
Flatbed rental 10 $9,246.58 $462,329.00
Electric pallet truck 15 $183.56 $13,767.00
Reach Truck 10 $386.30 $19,315.00
RR M14, Lift Height 6.3 M 2 $517.81 $5,178.10
RR B1, Lift Height 6.3 M 2 $517.81 $5,178.10
Elect pallet Stacker 1.6 tons 3 $331.51 $4,972.65
Material / Scissor Lift 7 $358.90 $12,561.50
Medium Level Order Picker 1 $802.74 $4,013.70
Container handler 4 $8,158.90 $163,178.00
Diesel Forklift 15 ton 2 $1,969.86 $19,698.60
Stock Selectors 15 $401.37 $30,102.75
Diesel Forklift 4K 10 $495.89 $24,794.50
Hand Pallet 25 $7.33 $916.25
Electric Fork lift - 4K 20 $503.94 $50,393.80
Caterpillar Diesel Fork lift - 6K 15 $503.94 $37,795.35
Caterpillar Diesel 10K 5 $397.90 $9,947.50
Van/Pick-up/spotter trucks 5 $366.84 $9,171.00
BT CBE 5 ton electric forklift 12 $890.92 $53,455.07
Scooters 2 $250.00 $2,500.00
Warehouse Riding Sweeper 2 $185.00 $1,850.00
168 $933,432.92
NOTE: All diesel equipment will require all terrain tires.
Above equipment requirements developed as a technical estimate due to unknown warehouse configuration.
Equipment Leases for Base and Option Period 1 Quantity Month/Each Total Base Period Total Option Period 1
CB for container 2.0 tons 1 $463.01 $3,241.07 $5,556.12
Flatbed rental 0 $9,246.58 $0.00 $0.00
Electric pallet truck 15 $183.56 $19,273.80 $33,040.80
Reach Truck 10 $386.30 $27,041.00 $46,356.00
RR M14, Lift Height 6.3 M 2 $517.81 $7,249.34 $12,427.44
RR B1, Lift Height 6.3 M 2 $517.81 $7,249.34 $12,427.44
Elect pallet Stacker 1.6 tons 3 $331.51 $6,961.71 $11,934.36
Material / Scissor Lift 7 $358.90 $17,586.10 $30,147.60
Medium Level Order Picker 1 $802.74 $5,619.18 $9,632.88
Diesel Forklift 15 ton 2 $1,969.86 $27,578.04 $47,276.64
Stock Selectors 22 $401.37 $61,810.98 $105,961.68
Diesel Forklift 4K 1 $495.89 $3,471.23 $5,950.68
Hand Pallet 25 $7.33 $1,282.75 $2,199.00
Electric Fork lift - 4K 0 $503.94 $0.00 $0.00
Caterpillar Diesel Fork lift - 6K 5 $503.94 $17,637.83 $30,236.28
Jhc Diesel Fork Lift 10 Ton 5 $1,923.17 $67,310.95 $115,390.20
2 Ton Caterpillar Diesel 5 $397.90 $13,926.50 $23,874.00
Van 2 $366.84 $5,135.76 $8,804.16
BT CBE 5 ton electric forklift 2 $890.92 $12,472.85 $21,382.03
110 $304,848.43 $522,597.31
Labor Moving 40k NSNs
LABOR CATEGORY FTE Number Base Labor Rate Hours Base Estimate for 1 month FP Base Estimate for 12 months
Management (1 Shift)
Site Manager 1 $32.88 160 $ 5,260.80 $ 63,129.60
Alt/Deputy Site Manager 1 $23.02 160 $ 3,683.20 $ 44,198.40
Security Manager 1 $18.72 160 $ 2,995.20 $ 35,942.40
Operations Manager 1 $20.09 160 $ 3,214.40 $ 38,572.80
Dispatch Manager 1 $16.94 160 $ 2,710.40 $ 32,524.80
Warehouse Manager 4 $16.00 640 $ 10,240.00 $ 122,880.00
Sr Contracts Mgt/Int'l Legal 0.5 $66.16 80 $ 5,292.80 $ 63,513.60
IT Manager 1 $26.75 160 $ 4,280.00 $ 51,360.00
Safety Manager 1 $18.72 160 $ 2,995.20 $ 35,942.40
Inventory Manager 1 $16.06 160 $ 2,569.60 $ 30,835.20
TSCP Mgr 1 $16.94 160 $ 2,710.40 $ 32,524.80
Container Yard Mgr 1 $16.94 160 $ 2,710.40 $ 32,524.80
Training & Development Manager 0.5 $19.12 80 $ 1,529.60 $ 18,355.20
Sub-Total 15 2400 $ 50,192.00 $ 602,304.00
Administration (1 Shift)
Office Administrator 1 $13.70 160 $ 2,192.00 $ 26,304.00
Property Specialist 1 $10.69 160 $ 1,710.40 $ 20,524.80
Senior Estimator 0.5 $42.72 80 $ 3,417.60 $ 41,011.20
Senior Cost Analyst 0.5 $34.25 80 $ 2,740.00 $ 32,880.00
Subcontracts Manager 1 $54.38 160 $ 8,700.80 $ 104,409.60
Logistics (3 shifts)
Mission 1st Line Supervisor (includes Container Yard) 15 $6.99 2880 $ 20,131.20 $ 241,574.40
Warehouse Team Leads (Mission & Yard) 15 $5.75 2880 $ 16,560.00 $ 198,720.00
TCSP 1st Line Supervisor 3 $6.99 576 $ 4,026.24 $ 48,314.88
TSCP Team Leads 3 $5.75 576 $ 3,312.00 $ 39,744.00
Material Team Lead 1 $5.75 192 $ 1,104.00 $ 13,248.00
Material Control Specs (Mat & Supplies Buyer) 4 $5.34 768 $ 4,101.12 $ 49,213.44
Quality Control Inspectors (Mission) 6 $3.52 1152 $ 4,055.04 $ 48,660.48
Quality Control Inspectors (TCSP) 3 $3.52 576 $ 2,027.52 $ 24,330.24
Inventory Control Team Leader 3 $21.74 576 $ 12,521.31 $ 150,255.68
Inventory Control Specialist 14 $13.05 2688 $ 35,073.59 $ 420,883.06
Distribution Process Worker (DPW) (Receiving, Storage, Packing, Shipping, Yard) inlcudes under 10K MHE operations 176 $2.30 33792 $ 77,721.60 $ 932,659.20
DPW (TSCP) includes under 10K MHE operations 34 $2.30 6528 $ 15,014.40 $ 180,172.80
Transportation Clerks 15 $2.30 2880 $ 6,624.00 $ 79,488.00
ESOC Operations 9 $3.52 1728 $ 6,082.56 $ 72,990.72
Woodworker/Carpenter 6 $2.43 1152 $ 2,799.36 $ 33,592.32
Haz Mat Handler 10 $5.28 1920 $ 10,137.60 $ 121,651.20
Heavy MHE Operator (10K and above, include RTCH, entire mission/TSCP) 27 $4.44 5184 $ 23,016.96 $ 276,203.52
Maintenance (2 shifts)
Building Supervisor 1 $5.71 192 $ 1,096.32 $ 13,155.84
MHE Supervisor 2 $9.70 384 $ 3,724.80 $ 44,697.60
Maintenance Team Lead 2 $4.36 384 $ 1,674.24 $ 20,090.88
Technician 10 $2.38 1920 $ 4,569.60 $ 54,835.20
Heavy MHE Mechanic 4 $3.47 768 $ 2,664.96 $ 31,979.52
Electrical Mechanic Technician 4 $2.84 768 $ 2,181.12 $ 26,173.44
Safety (3 Shifts)
Safety Inspectors 3 $3.45 576 $ 1,987.20 $ 23,846.40
Information Technology
Application System Support Spec 3 $21.28 576 $ 12,257.28 $ 147,087.36
Network Support 3 $22.75 576 $ 13,104.00 $ 157,248.00
EXPATS (3 shifts)
Transporation Specialists (Gov't System Access) 15 $28.00 2880 $ 80,640.00 $ 967,680.00
Quality Supervisor 1 $30.00 192 $ 5,760.00 $ 69,120.00
Customer Supt Mgr 1 $30.00 192 $ 5,760.00 $ 69,120.00
SubTotal 397.00 75,904.00 $392,728.82 $4,712,745.78
Total 412.00 78,304.00 442,920.82 5,315,049.78
Page &P of &N
File details come from the government source that posted it. Updated .