Attachment 1_Word table 04 May 10 Final.docx

DOCX document 31 KB Posted

Attached to
Contractor-Owned/Contractor-Operated (COCO) storage and distribution capability within Kuwait
Solicitation number
SP330010R0020
Issued by

About this file

Word Table

View the file

Other files

File Type Posted
TE 5 2- Projected Workload revised 5-17-10.docx DOCX document
SF30.pdf PDF
Attachment 1_Word table 14 May 10.docx DOCX document
TE 1.1 Timeline for Start-Up and Phase-In Activities - 14 May 10 —
Page 2 of SF 30 rev —
TE 3.6 Government-Furnished Training.doc DOC document
SF30.pdf PDF
Section B 14 MAY 2010 rev 1.doc DOC document
Attachment J 2 rev —
SF30_rev —
TE 4 1-Contractor-Furnished Training.doc DOC document
Master List of Q and A doc 5 MAY 2010 doc.doc DOC document
Copy of TE 3 2-GFE Misc Equip.xls XLS spreadsheet
TE 3 6 Government-Furnished Training.doc DOC document
TE 3 1 GFE MHE.docx DOCX document
SF30 iwith page 2.pdf PDF
SF30.pdf PDF
Standard Form 30 pages 1 and 2 27 April 2010.pdf PDF
Attachment J.2 27 April for amend 001 J 2.docx DOCX document
TE 3 1 GFE MHE 27 April 2010.docx DOCX document
TE 1 3 Current Snapshot DLA NSN 27 April 2010.xlsx XLSX spreadsheet
DDKS Final Q and A doc 27 APR 2010.doc DOC document
Atch J-3 Facility Progress Assessment Checklist 27 April 2010.doc DOC document
Conformed Sections B through M 27 April 2010.pdf PDF
TE 3 2 A GFE Misc under 300 value 27 April 2010.xls XLS spreadsheet
Attachment 1_Word table 27 APR 10 Final.docx DOCX document
TE 3 2-GFE Misc Equip 27 April 2010.xls XLS spreadsheet
Preproposal Conference Attendance List 12 APR 2010.xls XLS spreadsheet
DDKS Pre-Proposal Briefing Slides 12 APR 2010 1330hrs —
SP330010R0020 A -M 25 MAR 2010.pdf PDF
TE 5.6 Instructions for Processing Open MROs 1 .pdf PDF
TE 4.1-Contractor-Furnished Training.doc DOC document
TE 3.6 Government-Furnished Training.doc DOC document
TE 3.3-GFE Office Equipment.xls XLS spreadsheet
TE 4.2-MHE PM Task Codes.xls XLS spreadsheet
TE 1.2-IT Eligibility RequirementsL for DSS Access.docx DOCX document
TE 4.4- Equipment for Full Performance.doc DOC document
TE 1.4 Current Snaoshot AMC.xlsx XLSX spreadsheet
TE 1.1 Timeline for Start-Up and Phase-In Activities.ppt PPT presentation
Attachment J 2.docx DOCX document
TE 3.5 GF-Data Systems.doc DOC document
TE 3.1 GF MHE.docx DOCX document
TE 5.1-APLS.docx DOCX document
TE 4.3- Equipment for Phase-In.doc DOC document
TE 6.1-Gov Forms.doc DOC document
TE 3.7 Computer Room construction.doc DOC document
TE 5.3-Contractor DSS Load and Maintain.doc DOC document
TE 3.4 GFE-IT.docx DOCX document
TE 1.5 Current Snaoshot AJ2.xlsx XLSX spreadsheet
TE 1.3 Current Snapshot DLA NSN.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-10-R-0020

Attachment (1) to Amendment 0003

1.1.1
1.1.2
DDKS LANGUAGE
SECTION
PARA/ITEM
Attachment J.2
Section C 7 Technical Exhibits

TE 3.1 has been updated and replaced with a complete new TE 3.1

Forklift 6K elec
G108n5931e
Oliv
2007
$29298
Forklift 6K elec
G108n059587e
Hyster
2007
$29298
Forklift 6K
G108n059587e
Hyster
2007
$29298
Forklift 6K
L177v03978g
Hyster
2009
$24647

Attachment J.2

Section C 7 Technical Exhibits

TE 3.2 has been updated and replaced with a complete new TE 3.2

DISINTEGRATOR SEM MODEL 23 HDS
WHEQ
PWC01378AC
03F05496
MODEL 23 HDS
SECURITY ENG MACH CO INC.
EA
1
50327.29

Attachment

J.2 Section C 7

Technical Exhibits

TE 3.6 has been updated and replaced with a complete new TE 3.6

DSS applications
OffOn-site New Cumberland, PA
45 days (for all functional elements)
Four (4)per functional element
End of phase-in period
One-time

Attachment J.2

Section C 7 Technical Exhibits

TE 4.1 has been updated and replaced with a complete new TE 4.1

Warehouse Management System
Prior to the end of phase-in
As necessary