TE 1.1 Timeline for Start-Up and Phase-In Activities.ppt

PPT presentation 1 MB Posted

Attached to
Contractor-Owned/Contractor-Operated (COCO) storage and distribution capability within Kuwait
Solicitation number
SP330010R0020
Issued by

About this file

TE 1.1

View the file

Other files

File Type Posted
TE 5 2- Projected Workload revised 5-17-10.docx DOCX document
SF30.pdf PDF
Attachment 1_Word table 14 May 10.docx DOCX document
TE 3.6 Government-Furnished Training.doc DOC document
SF30.pdf PDF
Section B 14 MAY 2010 rev 1.doc DOC document
Attachment J 2 rev —
TE 1.1 Timeline for Start-Up and Phase-In Activities - 14 May 10 —
Attachment 1_Word table 04 May 10 Final.docx DOCX document
TE 3 1 GFE MHE.docx DOCX document
SF30 iwith page 2.pdf PDF
TE 4 1-Contractor-Furnished Training.doc DOC document
Master List of Q and A doc 5 MAY 2010 doc.doc DOC document
SF30.pdf PDF
Standard Form 30 pages 1 and 2 27 April 2010.pdf PDF
Attachment J.2 27 April for amend 001 J 2.docx DOCX document
Attachment 1_Word table 27 APR 10 Final.docx DOCX document
TE 3 2-GFE Misc Equip 27 April 2010.xls XLS spreadsheet
Atch J-3 Facility Progress Assessment Checklist 27 April 2010.doc DOC document
Conformed Sections B through M 27 April 2010.pdf PDF
TE 3 2 A GFE Misc under 300 value 27 April 2010.xls XLS spreadsheet
TE 3 1 GFE MHE 27 April 2010.docx DOCX document
TE 1 3 Current Snapshot DLA NSN 27 April 2010.xlsx XLSX spreadsheet
DDKS Final Q and A doc 27 APR 2010.doc DOC document
DDKS Pre-Proposal Briefing Slides 12 APR 2010 1330hrs —
Preproposal Conference Attendance List 12 APR 2010.xls XLS spreadsheet
SP330010R0020 A -M 25 MAR 2010.pdf PDF
TE 5.6 Instructions for Processing Open MROs 1 .pdf PDF
TE 4.1-Contractor-Furnished Training.doc DOC document
TE 3.6 Government-Furnished Training.doc DOC document
TE 3.3-GFE Office Equipment.xls XLS spreadsheet
TE 4.2-MHE PM Task Codes.xls XLS spreadsheet
TE 5.3-Contractor DSS Load and Maintain.doc DOC document
TE 3.4 GFE-IT.docx DOCX document
TE 1.5 Current Snaoshot AJ2.xlsx XLSX spreadsheet
TE 1.3 Current Snapshot DLA NSN.xlsx XLSX spreadsheet
TE 3.2-GFE Misc. Equip.xls XLS spreadsheet
TE 5.7 DSS Downtime.docx DOCX document
Attachment J1.doc DOC document
TE 1.6 Controlled Climate Storage.xlsx XLSX spreadsheet
TE 5.4 WPM Guidance for OCONUS Depots.docx DOCX document
TE 5 2- Projected Workload.docx DOCX document
TE 3.1 GF MHE.docx DOCX document
TE 5.1-APLS.docx DOCX document
TE 4.3- Equipment for Phase-In.doc DOC document
TE 6.1-Gov Forms.doc DOC document
TE 3.7 Computer Room construction.doc DOC document
TE 1.2-IT Eligibility RequirementsL for DSS Access.docx DOCX document
TE 4.4- Equipment for Full Performance.doc DOC document
TE 1.4 Current Snaoshot AMC.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WARFIGHTER FOCUSED, GLOBALLY RESPONSIVE SUPPLY CHAIN LEADERSHIP

WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

Prepare Site

JUN

JUL

AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

DDKS-2 Phase-In Start-Up (60 days) (1 Sep - 31 Oct) IOC - Phase-In (120 days) (01 Nov - 28 Feb 11)

DDKS-2 FOC

FOC (01 Mar 11) Govt

IT

Infrastructure (21 days) Pre-Award Site Survey 1 week DSS Training Two 5-week Courses J6N Cadre Tng (5 weeks) TCN Tng (5 weeks) Train the Trainer Vendor Install Storage Aids (21 days) 2 weeks

- Indoor

- Outdoor

- MHE

- Tng Rms

- CGA Area 2 weeks

Provide Non-DSS Labor support to Govt Support Workforce Request ETN Circuit Train the Workforce

- DSS Region

- Planograph

- Receive and Install HW (21 days) Establish TCSP Move into CGA Offices

Transition with Govt Support Workforce TE 1.1 Timeline for Start-Up and Phase-In Activities Redeploy SATCOM (ETN Circuit in place) Conduct Joint GFP Inventory Conduct Contractor Provided Training (e.g. HAZMAT) Obtain Govt Furn Tng (EMACS, Distro Ops, etc.)

Stock Transfer, Receipt and Issue Govt Support Workforce (IT Level II – 30 personnel) (TDY 3.5 months: 21 Oct 10 – 01 Feb 11) Deploy Workforce Deploy SATCOM

DSS FT/ET

(30 days)

Facilities Assessment
Force Protection Assessment
Physical Security Assessment
Environmental Assessment

Redeploy Workforce

Provide Full Labor Support (inc. DSS) Transfer GFP as available DDKS-2 Start-Up

Contract Award (31 Aug 10)

FOC

File details come from the government source that posted it. Updated .