Atch J-3 Facility Progress Assessment Checklist 27 April 2010.doc
DOC document 294 KB Posted
- Attached to
- Contractor-Owned/Contractor-Operated (COCO) storage and distribution capability within Kuwait
- Solicitation number
- SP330010R0020
- Issued by
-
Defense Logistics Agency Distribution
About this file
Newly added attachment J.3
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J.3
FACILITY PROGRESS ASSESSMENT CHECKLIST
SITE
LOCATION
DATE
GENERAL INFORMATION
Proposed number of buildings: 1 2 3 4 5 6 7 8 9 10 Other:
Number of bays per building: 1 2 3 4 5 6 7 8 9 10 Other:
Stacking height in each building: 15’ 20’ 25’ 30’ 35’ 40’ Other:
Buildings with multiple floors: Yes No If yes, how many floors:
Space per building: Gross SF Net SF
Number of exterior doors: Inbound: Outbound:
Exterior Doors: Width Height
Exterior Doors Open: Inward Outward Slide Rolling
Operational Elevators: Yes No Load Limits:
Exterior Docks/Ramps: Yes No Capable of handling MHE: Yes No
SPECIFIC BUILDING
Building Number:
Number of bays:
Size (L x W x H):
Gross SF:
Gross Cubic Feet:
Construction Completion:
100% 75% 50% 25% % Other
Current Condition:
Poor Fair Good Excellent New
Damaged:
Yes No % Damaged
Building use: Bulk Rack Bin Multiple
Material Stored: Classified Hazardous Ammo Other None Special
LOADING DOCKS
Docks: Available Built-In Portable On-Grade Ramped None
75% 59%
Current Condition:
Poor Fair Good
Yes No % Damaged
STRUCTURAL ELEMENTS
BUILDING PROFILE
Construction type: Stick Prefab Cast-In-Place Tilt-Up Panels
Construction material: Wood Steel Block Concrete Brick
Exterior Walls:
75% 59%
Fair Good
Interior Walls
75% 59%
Fair Good
Interior Fire Walls between bays:
Rated
75% 59%
Fair Good
Floors:
Concrete Dirt Gravel Asphalt Sand
75% 59%
Fair Good
Roof: Built-Up Standing Metal Seam Single-Ply Modified Bitumen
75% 59%
Fair Good
Skylights: Yes No Damaged? Yes No % Damaged
Vents: Gravity Mechanical None Damaged? Yes No % Damaged
Doors:
Exterior:
Personnel
Metal Wood Window
Cargo - Overhead/Slide/Roll Manual - Automatic Operated
75% 59%
Fair Good
Interior: Fire Doors
Roll-up Slide
Fusible Links for Automatic Operation
75% 59%
Fair Good
Security Day Gates:
None Roll Slide Accordion
75% 59%
Fair Good
Windows: Fixed Operable Security Screens Blast Proof None
75% 59%
Fair Good
OFFICE SPACE
Space available: Yes No HVAC Electric Water None
75% 50%
Fair Good
SF (L x W)
EXTERIOR OPEN STORAGE
Area:
Yes No Available Expandable None
Surface Type: Reinforced Concrete Black Top Crushed Stone Other
Construction Completed:
75% 50%
Fair Good
Damaged:
Shed Storage:
Available
Construction Completed:
75% 50%
Fair Good
Damaged:
INFRASTRUCTURE ELEMENTS
MECHANICAL
Heating/Ventilating/Air Conditioning (HVAC): Operable? Yes No
75% 50%
Current Condition:
Good
Humidity Control Yes No Operable? Yes No
75% 50%
Current Condition:
Good
Fire Sprinkler System: Wet Dry None Operable? Yes No
75% 50%
Current Condition:
Good
Portable Fire Extinguishers: Yes No Operable? Yes No
75% 50%
Current Condition:
Good
Damaged?
Domestic Water Available: Yes No Operable? Yes No
75% 50%
Current Condition:
Good
ELECTRICAL
Electrical Power Available: Yes No Commercial Generators on site
Power: US (120/208, 3 phase, 4 wire, 60 cycle) Yes No Other
Overhead or Underground Service Operable? Yes No
75% 50%
Current Condition:
Good
Fire Alarms:
No Operable?
Pull Stations:
No Operable?
Smoke Detectors: Yes
Operable?
75% 59%
Fair Good
Damaged:
Lights (Interior): HPS Metal Halide Mercury Fluorescent Incandescent
75% 59%
Fair Good
Operable:
Yes No
Damaged:
Lights (Exterior): HPS Metal Halide Mercury Fluorescent Incandescent
75% 59%
Fair Good
Street Lights: Security Lights Compound Lights
75% 59%
Fair Good
Service Panel Rating Amps Expandable Yes No
75% 50%
Current Condition:
Good
Emergency Lights: Yes No
75% 59%
Fair Good
Back-Up Generators: In Place Available Local None
Construction Completion:
75% 59%
Fair Good
SPECIALIZED BUILDING ASSETS
CONFORMING STORAGE
Storage requirements for storage of hazardous materials?
Special MHE, lighting, and electrical requirements to code?
SPECIALTY CONFORMING STORAGE
If required, is available for:
Controlled Temperature
Chill
Freeze
Vault
Controlled Humidity
Pilferable and/or Classified
Construction Completion:
75% 59%
Fair Good
Size: Length Width Height SF: (L x W) Cube: (L x W x H)
Damaged:
SECURITY CAGES
Cages:
Available Expandable None
75% 59%
Fair Good
SF (LxWxH)
Damaged:
SCALES
Scales: Available Built-In Portable None Close Proximity
75% 59%
Fair Good
SITE UTILITIES
Water: Commercial On-Site Water Buffalos Expandable Yes No
Construction Completion:
75% 59%
Fair Good
Electric: Commercial On-Site Generation Expandable Yes No
Construction Completion:
75% 59%
Fair Good
Sewer: Commercial Porta-Potties On-Site Plant Expandable Yes No
Construction Completion:
75% 59%
Fair Good
Operable:
Gas: Commercial Bottled Tanks Expandable Yes No
Construction Completion:
75% 59%
Fair Good
Heat: Central Individual Building None Expandable Yes No
Type:
Oil Gas Coal Electric Heat Pump
Construction Completion:
75% 59%
Fair Good
EQUIPMENT ITEMS
STORAGE AIDS
Type: Racks Bins Cantilever AS/RS Carousels In-Rack Sprinklers
Storage aids:
In use now?
Available: On site In country In theater
Construction Completion:
75% 59%
Fair Good
Required to support mission: Yes No
Type: Bin Rack Carousels Automatic Storage/Retrieval Systems (AS/RS)
Cantilever racks Nestainers Other
Sizes:
Quantities:
Manufacturers:
MATERIAL HANDLING EQUIPMENT (MHE)
Fork Lifts:
Yes No Type: Size:
Transporter Trucks: Yes No Type:
Flat Bed Trailers: Yes No
Cranes: Yes No Type: Floor Overhead Capacity:
Conveyors: Yes No
Hand Lifts: Yes No Capacity:
Floor Jacks: Yes No Capacity:
Stock Selectors: Yes No Capacity:
MATERIAL HANDLING EQUIPMENT
Type/Size: Forklifts Floor/Ovhd Cranes Conveyors
Transporter Trucks Straddle Trucks Floor Jacks
Operable: Yes No Damaged: Yes No % Damaged
Owner:
US Government Contractor
ADDITIONAL COMMENTS/CONCERNS/QUESTIONS
Are security lights, IDS, fence, fence sensors, etc, available and adequate?
75% 59%
Fair Good
Are there any environmental issues? Yes No If so, what?
Is there on-base engineering support? Yes No Military Contractor Host
What type: Maintenance/Repair Engineering Contracting
Are building footprints, site plans, planographs available?
Yes No Which?
If additional SF was needed, would K-Span, etc. type facilities be acceptable?
Force Protection/Antiterrorism requirements met?
Building stand-off distances met?
MISCELLANEOUS
Location: City Town Country Industrial Area Farm Area Isolated
Compound Perimeter: Yes No Partial %
Type:
Fence Block Brick Concrete Wood Razor Wire: Yes No
Construction Completion:
75% 59%
Fair Good
Security Lighting:
Operable Yes No
75% 59%
Current Condition:
Fair Good
Security Towers: Yes No Location: Number Manned Yes No
75% 59%
Fair Good
Perimeter Gates: Yes No Manned: Yes No Securable Reinforced
Type: Fence Rolling Fence Solid Metal Wood
75% 59%
Fair Good
Compound Roads: Yes No Main Highway Accessible: Yes No Distance:
Surface: Concrete Asphalt Stone Gravel Dirt Sand
75% 59%
Fair Good
Local Area Roads: Paved: Yes No Highway City Roads Rural Roads
Surface: Concrete Asphalt Stone Gravel Dirt Sand
Construction Completion:
75% 59%
Fair Good
Surrounding Area: Expansion Availability: Yes No How Much:
Surface: Paved Dirt Grass Stone Sand
Condition: Poor Fair Good Excellent
Security Factor of Area: No Risk Low Risk Medium Risk High Risk
Security Available:
Yes No US Coalition National
POINTS OF CONTACTS
POC’s Facilities Equipment Environment IT Contractor
Name:
Address:
Phone #:
Email:
PAGE