TE 5 2- Projected Workload.docx

DOCX document 30 KB Posted

Attached to
Contractor-Owned/Contractor-Operated (COCO) storage and distribution capability within Kuwait
Solicitation number
SP330010R0020
Issued by

About this file

TE5.2

View the file

Other files

File Type Posted
TE 5 2- Projected Workload revised 5-17-10.docx DOCX document
SF30.pdf PDF
Attachment 1_Word table 14 May 10.docx DOCX document
TE 3.6 Government-Furnished Training.doc DOC document
SF30.pdf PDF
Section B 14 MAY 2010 rev 1.doc DOC document
Attachment J 2 rev —
TE 1.1 Timeline for Start-Up and Phase-In Activities - 14 May 10 —
Attachment 1_Word table 04 May 10 Final.docx DOCX document
TE 3 1 GFE MHE.docx DOCX document
SF30 iwith page 2.pdf PDF
TE 4 1-Contractor-Furnished Training.doc DOC document
Master List of Q and A doc 5 MAY 2010 doc.doc DOC document
SF30.pdf PDF
Standard Form 30 pages 1 and 2 27 April 2010.pdf PDF
Attachment J.2 27 April for amend 001 J 2.docx DOCX document
Atch J-3 Facility Progress Assessment Checklist 27 April 2010.doc DOC document
Conformed Sections B through M 27 April 2010.pdf PDF
TE 3 2 A GFE Misc under 300 value 27 April 2010.xls XLS spreadsheet
Attachment 1_Word table 27 APR 10 Final.docx DOCX document
TE 3 2-GFE Misc Equip 27 April 2010.xls XLS spreadsheet
TE 3 1 GFE MHE 27 April 2010.docx DOCX document
TE 1 3 Current Snapshot DLA NSN 27 April 2010.xlsx XLSX spreadsheet
DDKS Final Q and A doc 27 APR 2010.doc DOC document
DDKS Pre-Proposal Briefing Slides 12 APR 2010 1330hrs —
Preproposal Conference Attendance List 12 APR 2010.xls XLS spreadsheet
SP330010R0020 A -M 25 MAR 2010.pdf PDF
TE 5.6 Instructions for Processing Open MROs 1 .pdf PDF
TE 4.1-Contractor-Furnished Training.doc DOC document
TE 3.6 Government-Furnished Training.doc DOC document
TE 3.3-GFE Office Equipment.xls XLS spreadsheet
TE 4.2-MHE PM Task Codes.xls XLS spreadsheet
TE 3.1 GF MHE.docx DOCX document
TE 5.1-APLS.docx DOCX document
TE 4.3- Equipment for Phase-In.doc DOC document
TE 6.1-Gov Forms.doc DOC document
TE 3.7 Computer Room construction.doc DOC document
TE 5.3-Contractor DSS Load and Maintain.doc DOC document
TE 3.4 GFE-IT.docx DOCX document
TE 1.5 Current Snaoshot AJ2.xlsx XLSX spreadsheet
TE 1.3 Current Snapshot DLA NSN.xlsx XLSX spreadsheet
TE 3.2-GFE Misc. Equip.xls XLS spreadsheet
TE 5.7 DSS Downtime.docx DOCX document
Attachment J1.doc DOC document
TE 1.6 Controlled Climate Storage.xlsx XLSX spreadsheet
TE 5.4 WPM Guidance for OCONUS Depots.docx DOCX document
TE 1.2-IT Eligibility RequirementsL for DSS Access.docx DOCX document
TE 4.4- Equipment for Full Performance.doc DOC document
TE 1.4 Current Snaoshot AMC.xlsx XLSX spreadsheet
TE 1.1 Timeline for Start-Up and Phase-In Activities.ppt PPT presentation
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-10-R-0020

TECHNICAL EXHIBIT 5.2

PROJECTED WORKLOAD

Phase In
PP01
PP02
PP03
PP04
Total Receipts
65,000
150,866
135,779
122,201
109,981
Total Issues
110,000
539,673
485,706
437,136
393,422
Total
175,000
690,539
621,485
559,337
503,403
Phase In
PP01
PP02
PP03
PP04
Weight Band 1
50,570
114,151
102,736
92,462
83,217
Weight Band 2
6,175
13,966
12,569
11,312
10,181
Weight Band 3
6,305
16,767
15,091
13,582
12,223
Weight Band 4
1,950
5,974
5,376
4,839
4,355
SPC RDOs
0
8
7
6
5
Total Receipts
65,000
150,866
135,779
122,201
109,981
Phase In
PP01
PP02
PP03
PP04

Issues On Base

Weight Band 1
0
0
0
0
0
Weight Band 2
0
0
0
0
0
Weight Band 3
0
0
0
0
0
Weight Band 4
0
0
0
0
0
On Base Issues Total
0
0
0
0
0

Issues Off Base

Weight Band 1
60,345
293,351
264,017
237,616
213,854
Weight Band 2
18,202
88,482
79,634
71,670
64,503
Weight Band 3
27,328
132,846
119,561
107,605
96,845
Weight Band 4
4,125
20,055
18,049
16,245
14,620
Total Issues Off Base
110,000
534,734
481,261
433,136
389,822

Transshipments OFF Base

Weight Band 1
0
428
385
347
312
Weight Band 2
0
383
345
310
279
Weight Band 3
0
1,201
1,080
972
875
Weight Band 4
0
317
286
257
231
Total Trans Off Base
0
2,329
2,096
1,886
1,697

DROs

Weight Band 1
0
955
860
774
696
Weight Band 2
0
509
458
412
371
Weight Band 3
0
880
792
713
642
Weight Band 4
0
266
239
215
194
TOTAL DROs
0
2,610
2,349
2,114
1,903
Phase In
PP01
PP02
PP03
PP04

PPP&M

Small

1,100
1,100
1,100
1,100

Medium

500
500
500
500

Large

200
200
200
200

Extra Large

200
200
200
200

Total PPP&M

2,000
2,000
2,000
2,000
Phase In
PP01
PP02
PP03
PP04
Total TCSP X-Dock Pure Pallets
0
4,510
3,608
2,706
1,894
Total Pure 463L TCSP Pallets X-Dock
0
0
0
0
0
Total 463L TCSP Pallet X-Dock Mat.
0
110
88
66
46
Total Loose TCSP X -Dock Material
0
100,768
80,615
60,461
42,323
Total SEAVAN TCSP X-Dock Material
0
4,620
3,696
2,772
1,941
Total TCSP
0
110,009
88,007
66,005
46,204

TE 5.2

File details come from the government source that posted it. Updated .