Page 2 of SF 30 rev

34 KB Posted

Attached to
Contractor-Owned/Contractor-Operated (COCO) storage and distribution capability within Kuwait
Solicitation number
SP330010R0020
Issued by

About this file

Page 2 of SF 30.

Text of this file

SP3300-10-R-0020

Amendment 0005

a. The purpose of this amendment is to incorporate the following changes into the solicitation:

DELETE
REPLACE WITH
Sections B
Entire
Sections B Conformed through Amendment 0005
Attachment J.2
Entire
Attachment J.2 Conformed through Amendment 0005
Technical Exhibit (TE) 1.1
Entire
TE 1.1 Conformed through Amendment 0005
TE 3.6
Entire
TE 3.6 Conformed through Amendment 0005

b. Additionally this amendment is also being issued to 1) explain the costs associated with the requirement to provide for 20 line hauls per day which is described in Section 5.5.1.9.5 under paragraph C of Attachment J.2; 2) increase the page limitation of the Surge, Sustainment and Disaster Recovery Plan (SSDRP) identified in Section L under the Proposal Organization Table of paragraph L-18; 3) explain the verbiage in PWS section 1.7.4.d which addresses the dates of 1 NOV 2010 TO 19 FEB 2011.

Responses to items above:

1) The costs for the 20 line hauls per day should be proposed for under both CLINs X003 and X004.

2) The page limitation for the SSDRP is hereby increased to 50 pages in lieu of 20 pages.

3) The February 19, 2011 date refers to the last day stock will be moving out of the current DDKS Facility. That will give the Contractor the remaining 9 days to process all receipts before the end of the Phase-In.

c. All revised sections are identified by the annotation “Conformed through Amendment 0005” in the header or footer of each page.

d. Narrative changes to MS Word and Adobe Acrobat documents are identified by change bars in the right hand margin across from each paragraph that has changed. *Note* Several minor changes were made to the effective dates of CLINs/SUBCLINs in Section B to coincide with the exact calendar days from 01 SEP 2010 through 28 FEB 2011. These changes only effected the base year (CLINS 0001, 0002, 0003, 0004, 0006 and 0007) of Section B under the header row titled “Supplies/Services. These changes are not identified by change bars in the right hand margin across from each change.

d. The Attachment (1) Word Table to this Amendment provides a summary of changes to assist the offeror in understanding how the solicitation has changed.

e. All other solicitation terms and conditions remain unchanged.

Other files

File Type Posted
SF30.pdf PDF
TE 5 2- Projected Workload revised 5-17-10.docx DOCX document
Attachment 1_Word table 14 May 10.docx DOCX document
TE 1.1 Timeline for Start-Up and Phase-In Activities - 14 May 10 —
TE 3.6 Government-Furnished Training.doc DOC document
SF30.pdf PDF
Section B 14 MAY 2010 rev 1.doc DOC document
Attachment J 2 rev —
SF30_rev —
TE 3 1 GFE MHE.docx DOCX document
SF30 iwith page 2.pdf PDF
TE 4 1-Contractor-Furnished Training.doc DOC document
Copy of TE 3 2-GFE Misc Equip.xls XLS spreadsheet
Master List of Q and A doc 5 MAY 2010 doc.doc DOC document
Attachment 1_Word table 04 May 10 Final.docx DOCX document
TE 3 6 Government-Furnished Training.doc DOC document
SF30.pdf PDF
Attachment J.2 27 April for amend 001 J 2.docx DOCX document
TE 3 1 GFE MHE 27 April 2010.docx DOCX document
TE 1 3 Current Snapshot DLA NSN 27 April 2010.xlsx XLSX spreadsheet
DDKS Final Q and A doc 27 APR 2010.doc DOC document
Atch J-3 Facility Progress Assessment Checklist 27 April 2010.doc DOC document
Standard Form 30 pages 1 and 2 27 April 2010.pdf PDF
TE 3 2 A GFE Misc under 300 value 27 April 2010.xls XLS spreadsheet
Conformed Sections B through M 27 April 2010.pdf PDF
TE 3 2-GFE Misc Equip 27 April 2010.xls XLS spreadsheet
Attachment 1_Word table 27 APR 10 Final.docx DOCX document
DDKS Pre-Proposal Briefing Slides 12 APR 2010 1330hrs —
Preproposal Conference Attendance List 12 APR 2010.xls XLS spreadsheet
TE 6.1-Gov Forms.doc DOC document
TE 3.7 Computer Room construction.doc DOC document
TE 1.2-IT Eligibility RequirementsL for DSS Access.docx DOCX document
SP330010R0020 A -M 25 MAR 2010.pdf PDF
TE 5.6 Instructions for Processing Open MROs 1 .pdf PDF
TE 4.4- Equipment for Full Performance.doc DOC document
TE 1.4 Current Snaoshot AMC.xlsx XLSX spreadsheet
TE 4.1-Contractor-Furnished Training.doc DOC document
TE 3.1 GF MHE.docx DOCX document
TE 1.1 Timeline for Start-Up and Phase-In Activities.ppt PPT presentation
TE 3.6 Government-Furnished Training.doc DOC document
TE 3.3-GFE Office Equipment.xls XLS spreadsheet
TE 4.2-MHE PM Task Codes.xls XLS spreadsheet
Attachment J 2.docx DOCX document
TE 3.5 GF-Data Systems.doc DOC document
TE 5.1-APLS.docx DOCX document
TE 4.3- Equipment for Phase-In.doc DOC document
TE 1.3 Current Snapshot DLA NSN.xlsx XLSX spreadsheet
TE 5.3-Contractor DSS Load and Maintain.doc DOC document
Attachment J1.doc DOC document
TE 1.5 Current Snaoshot AJ2.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .