Amendment_0002_-_SP060016R0423.pdf

PDF 32 KB Posted

Attached to
Energy Savings Performance Contract (ESPC) at Joint Base San Antonio, TX
Solicitation number
SP060016R0423
Issued by

About this file

Amendment 0002 - Responses to Request for Information from industry

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

K PAGE 1 OF 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 xx Aug 16 N/A

6.

ISSUED BY CODE

DLA ENERGY-FEABB

SP0600

7. ADMINISTERED BY (If other than Item 6) CODE

SP0600

8725 JOHN J. KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

BUYER/SYMBOL: JACOB H. VIGIL/DLA ENERGY-FEABB

PHONE: (703) 767-8554; FAX (703) 767-2382

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

X 9a. AMENDMENT OF SOLICITATION NO.

Notice of Opportunity/ SP0600-16-R-0423

9b. DATED (SEE ITEM 11) 25 Jul 2016

10a. MODIFICATION OF CONTRACT/ORDER NO

DUNS: CAGE:

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[x]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers] is extended, [ x ] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor [] is not, [ ] is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Response to a Request for Information from industry.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SP0600-16-R-0423

Amendment 0002

The subject amendment addresses a Request for Information (RFI) received from industry as follows:

FIRST: The following RFIs have been received from industry and are addressed as follows:

RFI 1: Does the Government or outside contractors provide the Operations and Maintenance (O&M) at each of the three bases (Lackland AFB, Fort Sam Houston, Randolph AFB). If it is a combination, please provide an approximate percentage of each.

RFI 1 RESPONSE: All O&M is performed by AF on all buildings, central plants,etc. Privatized Utility infrastructure repairs are performed by contractor/s on Ft Sam Houston (FSH), Kelly Annex utility infrastructure and Randolph Sewer. All AF buildings currently under ESPC task orders were removed from the list of buildings.

RFI 2: What is the annual spend for water treatment and sewer at each of the three bases (Lackland AFB, Fort Sam Houston, Randolph AFB)?

RFI 2 RESPONSE:

FY15:

Lackland, Kelly Annex - No sewage water treatment on base. Paid to San Antonio Water Systems (SAWS) Waste Water Annual Usage & Cost: 543.2 MGAL at $1,911,062

FY15:

Randolph - Sewage water treatment on base.

Waste Water Annual Usage & Cost: 120.9 MGAL at $370,326

FY15:

FSH - No sewage water treatment on base. Paid to SAWS.

Waste Water Annual Usage & Cost: 424.9 MGAL at $1,521,417

FY15

Camp Bullis - Sewage water treatment on base.

Waste Water Annual Usage & Cost: 26.47 MGAL at $91,376

RFI 3: What is the approximate on-site generation capability at each of the three bases (Lackland AFB, Fort Sam Houston, Randolph AFB)?

RFI 3 RESPONSE:

Lackland: One solar preheat system at Skylark pool generating 155 KW.

Randolph: None FSH/Camp Bullis: Two small Photovoltaic systems generating 180KW and 25KW.

SP0600-16-R-0423

Amendment 0002

RFI 4: What type of buildings are considered critical loads?

RFI 4 RESPONSE: JBSA buildings occupied by the following organizations are consider critical: Medical facilities, Command Centers, Head Quarters facility, Air Traffic Control Centers & Navigation systems, Air fielding lighting, Law enforcement, Fire Department, Communication data centers, high security areas, water wells, lift stations, etc.

RFI 5: Are any of the buildings identified in attachment 1 (“Energy Consumption and Costs – FY15”) leased or rented from other owning federal or municipal organizations? If they are, will there be any restrictions or limitations as to what energy infrastructure modifications and/or improvements can be done to these facilities/buildings?

RFI 5 RESPONSE: There are no reimbursable tenant buildings on the list of buildings in attachment 1.

RFI 6: Are there Utility Privatization contracts being executed or planned for the 6 installations that comprise JBSA?

RFI 6 RESPONSE: FSH, Kelly Annex Utilities and Randolph sewer are privatized. Air Force goal is to privatize utilities infrastructure, but Air Force will maintain ownership of buildings and equipment within the buildings.

RFI 7: The Notice of Opportunity states that JBSA is generally interested in 18 of the 20 technology categories in Attachment J-3 of the DOE IDIQ and specifically interested in seven ECMs. If an offeror chooses to focus the ECM-specific sections within the fifteen-page ESCO Approach section on the seven ECMs of specific interest to JBSA, would the government deem it a weakness that the proposal does not address site-specific solutions for the eleven other technology categories deemed of general rather than specific interest to JBSA?

RFI 7 RESPONSE: As stated in the Notice of Opportunity, the ESCO’s response should include sufficient information to identify and describe the possible energy conservation measures that it would propose for this project. The ESCO should include possible Energy Conservation Measures (ECM) considering the information presented in Attachment 1 by addressing both site-specific solutions and those of interest to JBSA.

SECOND: All other terms and conditions remain as previously stated.