ALTUS AFB, OK
ALTUS AFB, OK
Facility / Tank # Capacity (gallons) Tank Type (AST or UST) Total JP-8 Annual Throughput
Total # of Fillstands
Total # of Filter Separators
ATG (Y
or N)
Primary Receipt Mode & How Many Receipt
Headers
Alternate Receipt Mode & How Many Receipt Headers
Available
# of Product Recovery Systems
379 1,076,553 AST 17,185,977 1 3 Y TT-4 Pipeline 1 381 1,076,553 AST 18,371,075 1 3 Y TT-4 Pipeline 1
TOTAL 2,153,106
Facility / Tank # Capacity (gallons) Tank Type (AST or UST) Total Diesel Annual Throughput
Total # of Fillstands
Total # of Filter Separators
ATG
(Y or N)
Primary Receipt Mode & How Many Receipt
Headers
Alternate Receipt Mode & How Many Receipt Headers
Available
# of Product Recovery Systems
378 20,096 AST 28,811 1 N/A Y TT-1 1
TOTAL 20,096
LIST ALL OTHER BUILDINGS TO BE TURNED OVER TO CONTRACTOR OR DEDICATED SPACE IN OTHER FACILITIES TO BE SHARED FOR OFFICE SPACE, BATHROOMS, WORKSHOP, TOOL STORAGE, ETC. (NOTE:
SUFFICIENT FACILITIES WITH POTABLE RUNNING WATER FOR BATHROOMS, HAND WASHING, AND DRINKING MUST BE PROVIDED).
Does WFSM have capability to perform PM IAW UFC 3-460-03 and repairs in Bulk Storage if requested? Yes/No (Note: Only for those locations where AF WFSM does not currently perform these tasks) No
Yes
Can hydrants support weekend mission without re-supply from storage (both flightline and truck fills)? Yes, No, N/A
Does the base have an operational hydrant system? Yes or No (if yes how many) Does hydrants have truck fillstand capability? Yes , No, N/A
Can hydrants support after day shift (1700-0700) requirements (both flightline and truck fills) without re-supply? Yes, No, N/A Yes Yes
Is the hydrant pumphouse located outside of the Bulk Storage compound? Yes, No, N/A
If Bulk Storage is not 24/7, how is after-hours support provided? (i.e. RTB and fills at hydrants, standby, etc.)
Do tank trucks require escort to and from bulk storage?
How many trucks can be offloaded simultaneously?
How many refuelers can be filled simultaneously?
How often do you normally receive?
How many trucks or how long on the pipeline/barge is the normal receipt (answer for primary mode)?
What are the requirements for Bulk Storage support during aircraft surges/exercises? (i.e. 12 hr shifts, no change, etc.)
Approximately how many exercises, Reserve weekends, or other workload increases do you expect in a year?
Can AF Fuel Operations support after day shift (1700-0700) requirements without re-supply from storage (consider seasonal operations, use of C-300s, and service station)? Yes/No Cant receive TT and fill C-300 at same time, no need to.
Yes During inclement weather may have to fill C-300
Limitations. (i.e. can't transfer and receive at same time; can't receive and fill same time; etc)
1 Tool/storage bldg
DS2
IF OTHER FUEL PRODUCTS (DS2, MUR, FGM, ETC) ARE STORED IN BULK STORAGE AND TO BE OPERATED BY THIS CONTRACTOR, DUPLICATE/FILL IN INFORMATION BELOW FOR EACH PRODUCT:
LIST ALL GOVERNMENT FURNISHED EQUIPMENT (CA/CRL ITEMS SUCH AS COMPUTERS, RADIOS, CELL PHONES, BOWSERS, ETC) THAT WILL BE TURNED OVER TO THE CONTRACTOR.
3 Dell Computers 1-400 gallon bowser yes, 2 fill and 2 offload simultaneously
BULK JET FUEL: JP-8 Jet A
Can AF Fuel Operations support weekend missions without re-supply from storage (consider seasonal operations, use of C-300s, and service station)? Yes/No
Monday - Friday TT from 0600-1800 yes, 2 type three hydrant facilities Yes, 2 Fillstands at one and 1 fillstand at the other
Additional information: List specific support requirements unique to this location
What are your required Bulk Storage hours?
PROVIDE ANY ADDITIONAL COMMENTS, BASE SPECIFIC INFORMATION, OR UNIQUE SUPPORT REQUIREMENTS AND EXPAND ON SYSTEM LIMITATIONS BELOW: [Note: Support organizations (Security, Comm., Fire, Safety, Environmental, other CE, etc) peripheral services to Bulk Storage should be no different than than that provided to LRS prior to this initiative]
0600-2300 After hours is as needed basis, rtb's, fillstands are done at 1 of 2 type three hydrant facilities
No change type three facilities handle fills and rtb's
TT require escort from gate to bulk storage no escort required for exit 4 at a time 2 at a time
Can you receive/offload and fill simultaneously?
yes, 4 TT offload and transfer to hydrant simultaneously none
Is there a base grounds maintenance contract which mows Bulk Storage area? Yes/No Does the base provide entomology service (spraying) in Bulk Storage? Yes/No
Yes Yes
Can you receive/offload and transfer simultaneously?
1 office bldg, Altus