13R0324-0002.pdf

PDF 63 KB Posted

Attached to
PRODUCTION AND DELIVERY OF BULK AND DRUMMED JP-10 / PF-1
Solicitation number
SP0600-13-R-0324
Issued by

About this file

Amendment 0002

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE601 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60113R0324

X

2013 JUL 12

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY AEROSPACE ENRGY-DLAE-M

BLDG 1621

1014 BILLY MITCHELL BLVD

SAN ANTONIO TX 78226

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

7/25/2013

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUED ON NEXT PAGE

1.The purpose of this amendment is to address questions from industry, remove clause E1.13.100 CONTRACTOR INSPECTION RESPONSIBILITIES in its entirety and replace it, and publish the slide presentation utilized at the Pre-Proposal Conference held on July 23, 2013.

2. The questions and answers submitted by industry are as follows:

INDUSTRY QUESTION 1: What is the acceptable/required material of the storage tanks for the JP-10? Example:

Carbon Steel

GOVERNMENT RESPONSE: The acceptable / required materials for construction can be found in Aerospace Clause E0001 E1.13.100 CONTRACTOR INSPECTION RESPONSIBILITIES. The current clause in the RFP is being replaced in its entirety in this Amendment (0002) to include the Tables originally left off of the original clause.

INDUSTRY QUESTION 2: Will the Contractor be responsible for providing the methylcyclohexane (MCH) to produce the PF-1?

GOVERNMENT RESPONSE: Yes, the MCH will be contractor provided.

INDUSTRY QUESTION 3: Can the Contractor make the total contract estimated quantity all at one time?

GOVERNMENT RESPONSE: Yes, but the contractor can only invoice and get payment for the amount of product ordered, inspected and accepted into the DFSP. The Contractor will be responsible for storing the residual amount until ordered by the Government.

INDUSTRY QUESTION 4: Is it mandatory for the product to be produced and stored at the same facility?

GOVERNMENT RESPONSE: That is not a requirement. The Government does need to have the DFSP address listed in the E0003 E33.10 MANUFACTURING AND FILLING POINTS (AEROSPACE ENERGY)(DLA ENERGY JUL 2008) clause for evaluation purposes.

INDUSTRY QUESTION 5: Can polypropylene lined tanks be utilized for JP-10 storage?

GOVERNMENT RESPONSE: The storage tanks can be made of stainless steel, aluminum or mild steel with coating meeting MIL-PRF-23236. The acceptable / required materials for construction can be found in Aerospace Clause E0001 E1.13.100 CONTRACTOR INSPECTION RESPONSIBILITIES. The current clause in the RFP is being replaced in its entirety in this Amendment (0002) to include the Tables originally left off of the original clause.

3. The clause E1.13.100 CONTRACTOR INSPECTION RESPONSIBILITIES (JP-10/PF-1)(AEROSPACE ENERGY)(DLA ENERGY JUN 2013) in the RFP - Attachment 1 (Aerospace Clauses) is hereby removed in its entirety and replaced with the attached E1.13.100 CONTRACTOR INSPECTION RESPONSIBILITIES (JP-10/PF-1)(AEROSPACE ENERGY)(DLA ENERGY JUN 2013) which now includes the Tables (I & II), which were previously omitted.

4. The slide presentation utilized at the Pre-Proposal Conference is hereby attached to this amendment.

5. The closing time and date for this solicitation remains unchanged on August 13, 2013 at 3:00 PM Central Time.

PAGE 2 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE60113R0324-0002

Attachments

List of Attachments

Description File Name E1.13.100 Clause E1 13 100 CONT INSP

RESP Approved Amend

Pre-Proposal Slides JP-10 Pre-Prop Charts Amend 0002.pdf

PAGE 3 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE60113R0324-0002

Word Bookmarks
3

File details come from the government source that posted it. Updated .