12-R-0504 - Amend 0005.pdf
PDF 92 KB Posted
- Attached to
- Operation and Maintenance of Government Owned Air Force Bulk Fuel Facility (GOCO), Kadena AB, Japan
- Solicitation number
- SP0600-12-R-0504
- Issued by
-
Defense Logistics Agency Energy
About this file
Amendment 0005
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
09/17/2012
4. REQUISITION/PURCHASE REQ. NO.
SP0600-13-0327
5. PROJECT NO. (If applicable)
KADENA AB, JAPAN
6. ISSUED BY CODE SP0600 7. ADMINISTERED BY (If other than Item 6) CODE
DEFENSE LOGISTICS AGENCY – ENERGY
8725 JOHN J. KINGMAN RD, SUITE 2959
FT. BELVOIR, VA 22060-6222
BUYER/SYMBOL - Garth A. Hibbert/DLA Energy - BYA
PHONE: (703) 767-6750 FAX: (703) 767-9338
SEE ITEM 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION
NO.
SP0600-12-R-0504
X 9B. DATED (SEE ITEM 11)
05/29/2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PATRICIA A. LITTLEJOHN
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
Amendment 0005
SF 30 - BLOCK 14 CONTINUATION PAGE
The purpose of this Amendment is to:
1. Amend ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS, Paragraph 4 (page 3) to modify resume requirement as follows:
4. Technical/Management Data:
Resume Requirements - Offerors shall submit resumes for the Corporate Fuels Executive, The Terminal Superintendent and/or the Assistant Terminal Superintendent (as applicable). Resumes must clearly demonstrate that the nominee meets the qualifications stated in the Performance Work Statement (PWS). For additional instructions, see FAR Addendum 52.212-1.
ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS, Paragraph 4, Resume Requirements (page 3) is hereby removed in its entirety.
2. Amend Addendum to FAR 52.212-1 (page 147) to modify resume requirement as follows:
(2) TECHNICAL/MANAGEMENT DATA --
A) Resumes for the Corporate Fuels Executive, the Terminal Superintendent, and the Assistant Terminal Superintendent (as applicable). This requirement is not waived for incumbent Contractor employees. Résumés must clearly demonstrate that the nominee meets the qualifications stated in the Performance Work Statement (PWS). If these proposed employees do not meet the minimum qualifications identified in the PWS, the offer may be rejected as unacceptable
Addendum to FAR 52.212-1, Paragraph 2(A) (page 147) is hereby removed in its entirety.
3. Amend Addendum to FAR 52.212-2, FACTOR 1, Sub-Factor (f) (page 154) to modify resume requirement as follows:
FROM: Subfactor (f): Training - Technical, managerial, and operational details to ensure contractor personnel have requisite skills and associated training to accomplish all government requirements. The proposal must provide procedures to be implemented to ensure all contractor personnel are qualified and certified to accomplish all required tasks. The proposal must identify required courses and frequencies for maintaining personnel competence and method of documentation and certification. The proposal must also address the requirements for providing training to AF personnel. The key personnel resumes must reflect the required experience and training.
TO: Subfactor (f): Training - Technical, managerial, and operational details to ensure contractor personnel have requisite skills and associated training to accomplish all government requirements. The proposal must provide procedures to be implemented to ensure all contractor personnel are qualified and certified to accomplish all required tasks. The proposal must identify required courses and frequencies for maintaining personnel competence and method of documentation and certification. The proposal must also address the requirements for providing training to AF personnel. The proposal must demonstrate an understanding of the required experience and training of key personnel.
4. Amend Performance Work Statement, Appendix E to modify resume submission requirement as follows:
APPENDIX E
PERSONNEL
Key Personnel
Corporate Fuels Officer: To ensure continuity between the terminal and the Contractor’s home office, the Contractor shall employ during the life of this contract an executive who can make decisions concerning this contract; who has a complete understanding of the terms and conditions of this contract;
and who preferably has experience in the operation and maintenance of bulk petroleum storage terminals.
Terminal Superintendent (TS): To ensure on-site management of PWS requirements, the
Contractor shall employ a TS at each AF base under this contract for the life of this contract.
(1) The TS shall have significant, specialized commercial or military experience in fuel terminal operations and maintenance performing and supervising tasks equivalent to an AF Fuels Management seven-skill level (2F071) or nine-skill level (2F091) personnel. This experience shall include receiving, storing, issuing, and shipping petroleum products via tank truck, pipeline, rail, or tanker/barge as appropriate to the Air Force installation’s mode of receipt capability and maintenance and repair of bulk petroleum storage terminals, systems, and equipment.
(2) The TS shall have significant, relevant, and preferably recent supervisory experience.
Although general supervisory experience may be included, specialized supervisory experience in fuel terminal operations with emphasis in terminal maintenance, operations and environmental compliance must be predominant.
(3) This cannot be a collateral duty job. If the TS is absent for short periods (minor illness, vacation), an alternate must be designated and available to perform the TS duties. For extended absence (hospitalization, temporary duty), the Contractor shall notify the Contracting Officer and provide a qualified temporary or permanent replacement at no additional cost.
(4) After award, a resume meeting the above requirements must be submitted within 30-days for review and acceptance by DLA Energy. A replacement candidate’s resumes must also be submitted for review prior to assuming the duties as TS.
Assistant Terminal Superintendent (ATS): To assist the TS with on-site management of PWS requirements, the Contractor may employ an ATS.
(1) The ATS shall have commercial or military experience in fuel terminal operations and maintenance performing and supervising tasks equivalent to an AF Fuels Management seven-skill level (2F071) personnel. This experience shall include receiving, storing, issuing, and shipping petroleum products via modes as appropriate to the Air Force installation’s capability and maintenance and repair of bulk petroleum storage terminals, systems, and equipment.
(2) This may be a collateral duty job.
(3) After award, a resume meeting the above requirements must be submitted within 30-days for review and acceptance by DLA Energy. If an ATS is subsequently designated or a replacement candidate for an initially employed ATS is nominated, resumes must be submitted for review prior to assuming the duties as ATS.
Additional Personnel
Fuel Distribution Systems Mechanic (FDSM) (as defined in the Service Contract Act, Directory of Operations category 23340):
(1) Shall have commercial or military experience in maintaining fuel bulk storage and distribution systems and equipment performing tasks equivalent to an AF Water and Fuel System Maintenance five-skill level (3E452) personnel.
(2) A minimum of one FDSM will be employed at each AF base where the Contractor is responsible for PM under this contract according to Appendix D.
(3) After award, a resume meeting the above requirements must be submitted within 30-days for review and acceptance by DLA Energy. Replacement candidate’s resumes must also be submitted for review prior to assuming the duties as FDSM.
Fuel Distribution System Operator (FDSO) (as defined in the Service Contract Act, Directory of Operations category 21010):
(1) Shall have a commercial or military experience in operating fuel bulk storage and distribution systems and equipment performing tasks equivalent to an AF Fuels Management five-skill level (2F051) personnel.
(2) Lead Operators shall have experience equivalent to an AF Fuels Management seven-skill level (2F071) personnel.
General
Personnel qualifications and staffing are important sub-factors in evaluating the Contractor’s proposal and subsequent capability to successfully provide the services specified in the PWS.
The Contractor shall ensure personnel assigned to all tasks have the requisite knowledge and skills to meet minimum performance standards and comply with all applicable Federal, State and local laws and regulations.
The Contractor shall ensure personnel assigned are able to speak, read and comprehend English (be literate) to the extent of reading and understanding printed regulations, detailed written orders and operating procedures, training instructions and materials and be able to compose reports which convey complete information. For overseas locations, the Contractor shall ensure sufficient personnel are able to speak, read, and comprehend the host nation language if required to effectively conduct operations or maintenance.
Unique aspects of fuels operations and maintenance, such as the two person policy for safety, confined space entry requirements, visitor control, escort duties, capability to conduct simultaneous operations, and variability in task times and duration, necessitate maintaining a certain level of staffing to ensure success.
Failure to staff accordingly may not result in an immediately noticeable lapse in performance requirements, but will likely lead to intermittent lapses, threatened lapses or potential long range impacts.
Also, the risk of failure of critical military missions can be mitigated by ensuring proposed, evaluated, and approved key personnel, FDSMs, and FDSOs are assigned and available during the specified hours of operation. Therefore, the Contractor agrees to provide the proposed amount of full-time equivalent (FTE) staffing and specifically assign personnel who meet or exceed the requirements of this Performance Work Statement. No reduction or addition of FTEs shall be made without approval from the Contracting Officer. After awared, no substitution of key personnel or FDSMs shall be made without approval from the Contracting Officer.
The Contractor agrees that after the Government’s acceptance of nominated key personnel, no key personnel or FDSM substitutions will be permitted unless such substitutions are necessitated by an individual’s sudden illness, death or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information required below.
If personnel for whatever reason become unavailable for work under this contract for a continuous period exceeding 30 work days or are expected to devote substantially less effort toward the work than indicated in the proposal, the Contractor shall propose a substitution of such personnel in accordance with the below requirements.
All proposed substitutions shall be submitted, in writing, to the Contracting Officer at least 15 days prior to the proposed substitution. Each request shall provide detailed explanation of the circumstances necessitating the proposed substitution, a complete resume for the proposed substitute and any other information required by the Contracting Officer to approve or disapprove the proposed substitution. All proposed substitutes (no matter when they are proposed during the performance period) shall have qualifications that are equal to or higher than the qualifications of the person being replaced.
In the event a requirement to increase the specified level of effort for a designated labor category, but not change to the overall level of effort of the contract occurs, the Contractor shall submit to the Contracting Officer a written request for approval to add personnel to the designated labor category. The information required is the same as that required above. The additional personnel shall have qualifications greater than or equal to at least one (1) of the individuals proposed for the designated labor category.
The Contracting Officer shall evaluate requests for substitutions and addition of personnel and promptly notify the Contractor, in writing, whether the request is approved or disapproved.
If the Contracting Officer determines that suitable and timely replacement of personnel who have been reassigned, terminated or are unable to perform under the contract is not reasonably forthcoming or that the resultant reduction or productive effort would impair the successful completion of the contract, the contract may be terminated by the Contracting Officer for default or for the convenience of the Government, as appropriate. Alternatively, at the Contracting Officer’s discretion, if the Contracting Officer finds the Contractor to be at fault for the condition, he may equitably adjust (downward) the contract price or fixed fee to compensate the Government for any delay, loss or damage as a result of the Contractor’s action.
5. Please acknowledge receipt of this Amendment by completing SF30 Items 8 and 15, and returning one (1) copy to the Contracting Office.
All other terms and conditions of this solicitation remain unchanged.
File details come from the government source that posted it. Updated .