0518 Attachment 3.pdf
PDF 266 KB Posted
- Attached to
- SP0600-09-R-0518 Houston, TX
- Solicitation number
- SP0600-09-R-0518
- Issued by
-
Defense Logistics Agency Energy
About this file
Attachment 3 - Appendix B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10C5025_P17_LBC_J_and_A _Actual_Redactions.pdf | ||
| 0001 0518.pdf | ||
| SP0600-09-R-0518 RFP.pdf | ||
| 0518 Attachment 4.pdf | ||
| 0518 Attachment 5.pdf | ||
| 0518 Attachment 2.pdf | ||
| 0518 Attachment 6.pdf | ||
| 0518 Attachment 1 OSP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B (l)MINIMUM SAMPLING AND TESTING REClUIREMENTS
LOCATION WHEN SAMPLED TYPE OF SAMPLE TYPE OF TEST (See Table II for test series definitions) I. Bulk Storage Tanks After Fuel Receipt (All
Modes) All-Level I-quart Sample C Testing Plus FSII Content
After Fuel Receipt (All Modes)
All-Level or Single Tank Composite 2-gallon Snmple
Send 10 U.S. Governmenl Lab for B-1 Plus JFfOT Analysis
Dormanl (No Receipt) for 180 Da..
All-Level or Single Tank Comuosite 2-.01l0n Samule
Send to U.S. Government Lab for B-2 Analysis
2. Receivino Lines Prior to Each ReceiDt Line, Downstrcom of Filter C testin.
3. Walerborne Vessel
Discharge Prior to Discharge Each Cargo Tank--Gauge for Waw (2) and Pullan All-Level Sample
Perform Visual on Tank All- Level Samples for Color, Water and Solids
Prior to Discharge Create Two One-Gallon Composite Samples from Cargo Tank All-Level Samples
On One Gallon Perform C Tesling (3), Relain the Second Gallon for 60 Days
During Discharge, One Half Hour After Start and Each HQlfHour Unlit Completion (Downstream of Filter)
Line Sample Composite and Relain for 60 Days
During Discharge; Five Minutes After Shore Line Displacement, at Midpoinl, & One Hour Prior to Compl elion !Downstream of Filler)
Line Sample Particulate Tesling
4. Tank CarrrrucklIMC Dischurge
Prior to Discharge Bonom Sample From Each Compartment
Visual for Water and Sedimenl(4)
Prior to Discharge Composiled All-Level Sumples From All ComoaTlments
Perform C Te'ting (3)
5. Tank Carrrruck/lMC Daily on Firsl Use and After Line, Downstream of Filter C testing plus FSn Conlent Loudin. Rack Chanae of Source Tank
6. Tank Carsffruck!IMC After Fillin. Ali-Level C leslin.
NOTES FOR TABLE I:
(1) ADDITIONAL TESTING MAY BE REQUIRED AT THE GOVERNMENT'S OPTION. LIMITS FOR TESTS ARE IN ACCORDANCE WITH MIL-DTL-25524E. REPORT SAMPLE FAILURES IMMEDIATELY TO DESC
FOR GUIDANCE.
(2) WATER SHOULD BE NIL.
(3) COMPARE FLASHPOINT AND API GRAVITY RESULTS TO THE GBL THAT ACCOMPANIED THE
SHIPMENT TO CONFIRM THAT RESULTS FALL WITHIN THE REPRODUCffiILlTY LIMITS
Attachment 3
SP0600-09-R-0518
Houston, TX
ESTABLISHED BY THE TEST METHOD. IF REPRODUCABILITY LIMITS ARE NOT MET CONTACT
DESC FOR GUIDANCE PRIOR TO OFFLOADING.
(4) IF VISUAL FAILS, WATER AND SEDIMENT SHALL BE DRAWN/SUMPED OFF AND CONTAINER
RESAMPLED.
Attachment 3
SP0600-09-R-0518
Houston, TX
File details come from the government source that posted it. Updated .