0518 Attachment 3.pdf

PDF 266 KB Posted

Attached to
SP0600-09-R-0518 Houston, TX
Solicitation number
SP0600-09-R-0518
Issued by

About this file

Attachment 3 - Appendix B

View the file

Other files

File Type Posted
10C5025_P17_LBC_J_and_A _Actual_Redactions.pdf PDF
0001 0518.pdf PDF
SP0600-09-R-0518 RFP.pdf PDF
0518 Attachment 4.pdf PDF
0518 Attachment 5.pdf PDF
0518 Attachment 2.pdf PDF
0518 Attachment 6.pdf PDF
0518 Attachment 1 OSP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B (l)MINIMUM SAMPLING AND TESTING REClUIREMENTS

LOCATION WHEN SAMPLED TYPE OF SAMPLE TYPE OF TEST (See Table II for test series definitions) I. Bulk Storage Tanks After Fuel Receipt (All

Modes) All-Level I-quart Sample C Testing Plus FSII Content

After Fuel Receipt (All Modes)

All-Level or Single Tank Composite 2-gallon Snmple

Send 10 U.S. Governmenl Lab for B-1 Plus JFfOT Analysis

Dormanl (No Receipt) for 180 Da..

All-Level or Single Tank Comuosite 2-.01l0n Samule

Send to U.S. Government Lab for B-2 Analysis

2. Receivino Lines Prior to Each ReceiDt Line, Downstrcom of Filter C testin.

3. Walerborne Vessel

Discharge Prior to Discharge Each Cargo Tank--Gauge for Waw (2) and Pullan All-Level Sample

Perform Visual on Tank All- Level Samples for Color, Water and Solids

Prior to Discharge Create Two One-Gallon Composite Samples from Cargo Tank All-Level Samples

On One Gallon Perform C Tesling (3), Relain the Second Gallon for 60 Days

During Discharge, One Half Hour After Start and Each HQlfHour Unlit Completion (Downstream of Filter)

Line Sample Composite and Relain for 60 Days

During Discharge; Five Minutes After Shore Line Displacement, at Midpoinl, & One Hour Prior to Compl elion !Downstream of Filler)

Line Sample Particulate Tesling

4. Tank CarrrrucklIMC Dischurge

Prior to Discharge Bonom Sample From Each Compartment

Visual for Water and Sedimenl(4)

Prior to Discharge Composiled All-Level Sumples From All ComoaTlments

Perform C Te'ting (3)

5. Tank Carrrruck/lMC Daily on Firsl Use and After Line, Downstream of Filter C testing plus FSn Conlent Loudin. Rack Chanae of Source Tank

6. Tank Carsffruck!IMC After Fillin. Ali-Level C leslin.

NOTES FOR TABLE I:

(1) ADDITIONAL TESTING MAY BE REQUIRED AT THE GOVERNMENT'S OPTION. LIMITS FOR TESTS ARE IN ACCORDANCE WITH MIL-DTL-25524E. REPORT SAMPLE FAILURES IMMEDIATELY TO DESC

FOR GUIDANCE.

(2) WATER SHOULD BE NIL.

(3) COMPARE FLASHPOINT AND API GRAVITY RESULTS TO THE GBL THAT ACCOMPANIED THE

SHIPMENT TO CONFIRM THAT RESULTS FALL WITHIN THE REPRODUCffiILlTY LIMITS

Attachment 3

SP0600-09-R-0518

Houston, TX

ESTABLISHED BY THE TEST METHOD. IF REPRODUCABILITY LIMITS ARE NOT MET CONTACT

DESC FOR GUIDANCE PRIOR TO OFFLOADING.

(4) IF VISUAL FAILS, WATER AND SEDIMENT SHALL BE DRAWN/SUMPED OFF AND CONTAINER

RESAMPLED.

Attachment 3

SP0600-09-R-0518

Houston, TX

File details come from the government source that posted it. Updated .