0515 PWS.pdf

PDF 47 KB Posted

Attached to
Environmental Assessment and Remediation Services Federal contract opportunity
Solicitation number
SP0600-09-R-0515
Issued by
Defense Logistics Agency Energy

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Assessment and Remediation Services, newest first.
File Type Posted
0515 Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
0515 Amendment 0001.pdf PDF
SP060009R0515 Alaska RFP.pdf PDF
0515 Wage Det 05-2018.pdf PDF
0515 OSP Package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP0600-09-R-0515

Attachment 1

SECTION C - PERFORMANCE WORK STATEMENT

ENVIRONMENTAL RESPONSE CONTRACT

FOR

DEFENSE FUEL SUPPORT POINTS (DFSPs) WHITTIER, AK AND ANCHORAGE, AK;

the INDIAN PUMP STATION, AK, and the EIELSON PIPELINE SITES

BACKGROUND: The Defense Energy Support Center (DESC) administers military fuel storage and transportation facilities known as Defense Fuel Support Points (DFSP’s) Anchorage, AK and Whittier, AK. Included in the operations was the Indian Booster Pump Station on the Whittier to Anchorage fuel pipeline. These facilities have been closed except for the pipeline from the refinery located in North Pole, AK to the bulk fuel farm at Eielson Air Force Base (AFB), AK. The facilities consist of bulk fuel storage tanks, pipelines, fuel piers, and bulk truck and rail car loading racks. Details of the principal features of these DESC administered facilities are shown in Appendix “A”. Fuel spills related to the storage and transportation operations occasionally occurred due to accidents or equipment failure. Such spills and leaks at the facility still in operation (Eielson Pipeline) require a rapid response capability to assist in the geotechnical evaluation effort of the impacts of the spill and gather initial information to further characterize and remediate the contamination from the spill. All other facilities are no longer active and cleanup actions are either ongoing or have been completed. Groundwater monitoring programs have been implemented.

SCOPE: As ordered by the Contracting Officer, the environmental service contractor shall conduct Environmental Assessments, Environmental Remediations, and Emergency Responses at the specified facilities. Based on previous experience, DESC has compiled a list of services that might be needed to respond to an environmental service requirement. Additional control, assessment, or remediation techniques recommended by the contractor may be approved for use on a specific response if the contractor can satisfactorily demonstrate to DESC that the techniques are viable for controlling fuel contamination, cost effective, available "off-the-shelf", and are acceptable to state and federal authorities.

a. ASSESSMENT: During the assessment phase of work the contractor shall evaluate the lateral and vertical extent of contaminants in the subsurface, assess the nature and extent of free product that may be present, initiate free product recovery, assess the nature and lateral extent of groundwater and soil contamination, evaluate the geologic and hydrogeologic characteristics of the subsurface, and initiate a risk assessment. Risk Assessment shall provide sufficient information to be used in a Remedial Action Plan.

Typical Activities:

• Conduct soil and groundwater sampling utilizing conventional boring or direct push technology, classification and analysis (field screening, soil/gas survey).

• Install observation and monitoring wells.

• Perform soil and groundwater analyses.

• Perform free fuel sampling and analyses including forensic testing.

• Determine soil fuel contamination and mass.

• Determine free fuel plume size and mass.

• Determine dissolved fuel plume size and mass.

• Perform pump test and analyze data.

• Estimate the hydraulic conductivity (grain size, uniformity coefficient of the sediments, and porosity measurements).

• Initiate interim free product recovery.

• Prepare summary reports of activities.

• Present findings to DESC representatives, regulatory agencies, and the public.

• Conduct risk assessment.

• Conduct treatabilty testing.

• Develop a Remedial Action Plan.

b. REMEDIATION: During the remediation phase of work the contractor shall install a fully functional, safe and reliable remediation system to cleanup the site. The contractor shall conduct concurrent engineering rather then sequential engineering. System development documents shall be produced to industry standards. System drawings shall be created with components which could be site adapted for use on future remediation projects. The contractor is encouraged to use “cut and paste” from previously used systems in order to minimize the effort and cost to develop a remediation system. Prepared system documents shall include text to advance the project into the next stage so that documents can be used “as-is” to procure the system without procurement specs.

Typical Activities:

• Develop system drawings.

• Obtain Regulatory Agency approval.

• Procure system components.

• Construct the remediation system.

• Prepare O&M manual.

• Perform start up.

• Operate and maintain the system.

TASK 1. WORK PLAN. Contractor shall develop a work plan to conduct an environmental site investigation or remediation. The purpose of the plan is to list required tasks for a specific site assessment and/or remediation. The plan shall be developed under the direct supervision of a certified hydrogeologist or geologist, with extensive verifiable experience in hydrogeology in the State in which the work is to be performed. Upon approval of the work plan by the Contracting Officer and subject to the approval of the State or local regulatory agencies, the Contractor will implement the work plan. Proposals shall be based on the assumption that 30 work hours will be required to prepare a completed work plan. Proposal shall include providing and distributing a total of five (5) copies of the Work Plan. Upon final approval of the Work Plan by regulatory agencies, the Contractor shall provide the Contracting Officer a record copy on CD-R media of the approved work plan and all correspondence associated with the development and approval of the work plan (e.g.

transmittal letters, regulatory agency correspondence, approvals, etc.).

TASK 2. SOIL/GAS SURVEY. Contractor shall conduct a soil/gas survey in the area of concern to obtain information that will be useful in locating new monitoring wells. Assume probe depths of 4 feet and 14 feet with one unit of soil gas work equal to ten (10) soil/gas points. Offeror shall explain in detail any additional assumptions made in its proposal.

TASK 3. GEOPHYSICAL SURVEY. Contractor shall conduct a geophysical survey using ground penetrating radar to locate underground tanks, buried pipelines, or other obstructions. Assume one unit of geophysical survey work is equal to 10,000 linear feet. This Task includes preparation and furnishing to the Contracting Officer two (2) CD-R media of a report explaining how the survey was conducted and detailing survey results.

TASK 4. SOIL BORINGS. Contractor shall install borings using a hollow stem auger. Take soil samples every 5 feet or whenever a soil change is detected, employing a split spoon sampler. Samples shall be screened by head space analysis using an Organic Vapor Analyzer (OVA) or equal. Drilling shall be in accordance with State Regulations. A geologist or hydrogeologist, working under the direct supervision of a registered geologist, shall be on-site throughout the drilling phase to classify soil conditions encountered, oversee boring installation, prepare boring logs, and monitor grouting of borings. Soil produced in drilling of borings shall be screened, and contaminated soil shall be placed on and covered with PVC sheeting. Non-contaminated soil shall be spread in the vicinity of the work. Disposal of contaminated soil will be authorized under Tasks 15 and/or 16. Soil handling procedures outlined under this Task are also applicable to all other Tasks where potentially contaminated soil is generated in the form of cuttings or excavation. Analytical laboratory testing of soil samples obtained will be ordered under Task 8.

TASK 5. MONITORING WELLS. Contractor shall install 2” or 4" monitoring wells, as ordered. The monitoring wells shall be installed in accordance with procedures accepted by the State in which work is performed and the USEPA.

Samples shall be collected using a clean split spoon sampler every 5 feet or whenever a soil change is detected. The headspace of all soil samples shall be analyzed for volatile organic vapors using an OVA or equal. Well construction shall be performed by personnel who are qualified in the locality in which the work is performed. A geologist or a hydrogeologist, working under the direct supervision of a registered geologist, shall be present as required in Task 4.

Closing and decommissioning of existing monitoring wells may also be ordered under this Task and this work shall be conducted in full compliance with applicable regulatory agency requirements.

TASK 6. WELL DEVELOPMENT. Wells shall be developed to restore the natural permeability of the surrounding formation adjacent to the borehole. Non contaminated water shall be disposed of on site in the vicinity of the work.

Disposal of contaminated water will be authorized under Tasks 15 and/or 16.The work shall include obtaining water sample from the well after development, but analytical testing shall be ordered under Task 8. Water handling procedures outlined under this Task shall also be applicable for all other Tasks where water is produced with the exception of Task 11.

TASK 7. DIRECT PUSH TESTING. The Contractor shall use direct push methods for screening and/or obtaining groundwater and soil samples for analytical testing. Soil samples shall be screened by head space analysis using an OVA.

Test probes shall be steam cleaned or otherwise effectively decontaminated after each use. The work includes grouting of bore holes in accordance with regulatory agency procedures. A geologist or hydrogeologist, working under the direct supervision of a registered geologist, shall be on site throughout the Geoprobe work. One unit of direct push testing consists of five (5) individual probes. Assume a maximum probe depth of fifty (50) feet.

TASK 8. SAMPLE TESTING. Soil Samples collected under Task 4, 5, and 7 and Groundwater Samples collected under Tasks 6 and 7 shall be tested utilizing the test methods listed below. The types and number of tests to be performed for all Tasks will be determined at the time the work is ordered. In addition to providing “hard copies” of all analytical results, electronic deliverables of results must also be included in the price. Proposals shall state the normal turnaround time (business days) to obtain results and surcharges for 72 hour and 24 hour expedited turnaround. Preparation costs (extractions, dissolution, filtering, etc.) for samples requiring preparation prior to analysis and disposal of excess sample media shall be included in the price.

SOILS:

SW-846 METHOD COMPOUNDS

6010 Total Lead 8015 Non-Halogenated Volatile Organics 8021 Aromatic and Halogenated Volatiles 8041 Phenols 8081 Organochlorine Pesticides & PCE's 8121 Chlorinated Hydrocarbons 8151 Chlorinated Herbicides 8260 Volatile Organics 8270 Semi-Volatile organics 8310 Polynuclear Aromatic Hydrocarbons 8440 Total Recoverable Petroleum Hydrocarbons

GROUNDWATER:

40CFR136 METHOD COMPOUNDS

601 Purgeable Halocarbons 602 Purgeable Aromatics 604 Phenols 608 Organochlorine Pesticides and PCBs 610 Polynuclear Aromatic Hydrocarbons 612 Chlorinated Hydrocarbons 624 Purgeables 625 Base/Neutrals and Acids

SOILS/GROUNDWATER:

TCLP Lead, Arsenic, Cadmium, Chromium Barium, Mercury, Selenium, Silver 9045 pH 1010/1020 Ignitability

STATE OF ALASKA

SPECIFIC TESTS

AK 101 Gasoline Range Organics (GRO) AK 102 Diesel Range Organics (DRO) AK 103 Residual Range Organics (RRO)

TASK 9. WELL SURVEY. Following completion of monitoring well installation, the wells will be surveyed for elevation and plan location with respect to existing site facilities and the State plane coordinate system. The ground surface elevation will be recorded as well as the top of casing of each well. The elevation will utilize the same datum as the existing monitoring well system or to another datum suitable for the site. A State licensed surveyor will perform the work. One unit of surveying consists of locating and plotting 10 wells.

TASK 10. RECOVERY WELLS. In the event free product is detected in any boring or monitoring well, a 6" diameter product recovery well shall be installed. The work shall include installation of the 6" diameter well and installation of a water table depression and free product recovery pump system. The proposal shall also include the cost to convert an existing 4" monitoring well to a recovery well by installing a water table depression and free product recovery pump system. Pump system shall be rated 2-10 GPM suitable for 50 ft well. The work is to include all electrical and plumbing requirements within the well up to the top of the well casing. The scope of work shall include furnishing and installing a 150-gallon tank for product recovery. Provisions for electrical power and water handling will be ordered under other appropriate Tasks depending on site specific conditions. Monthly operation and maintenance of the recovery well system shall be identified separately in the proposal and shall include all efforts required to keep the pump system operational.

TASK 11. PUMP TEST. Perform a pump test to establish optimum pumping rate and to evaluate the safe yield of the pumping well. Measure pre-test fluctuations of the groundwater levels in the production and observation wells. The pump test shall be conducted using a 4" diameter production well and two 2" diameter monitoring wells adjacent to the production well. Well installation costs will be as provided in Task 5. Contractor shall pump from the production well and observe water levels in the observation wells during the entire duration of pumping and after pumping is completed until at least 90% of the initial static water level is recovered. Pumping shall be performed for a minimum of 8 hours.

Assume discharge water can be disposed of without any special treatment. Contractor shall interpret, tabulate, and provide graphical representation of the results. Finally, Contractor shall conduct a simulation of groundwater recovery through computer modeling to determine the optimum groundwater pumping rate for remediation. The work shall include all necessary equipment and personnel to conduct the test and analyze results.

TASK 12. REPORTS. No later than 60 days after completion of any field work and/or receipt of analytical results, the Contractor shall prepare and submit one (1) draft hard copy of a report of findings to the Contracting Officer for review. Finalize the report after receipt of review comments and provide up to two (2) hard copies and two (2) CD-R media copies of the report for distribution. Reports shall include a description of site conditions and the condition of the soils, surface water, groundwater and any remediation that was accomplished. Specific enclosures would typically include the following where applicable:

a. Site location map.

b. The geologic description and classification of subsurface soils.

c. Results of any soil gas and geophysical surveys.

d. Typical geological cross sections.

e. Monitoring well boring logs.

f. Well locations and elevation survey.

g. Groundwater flow map.

h. Sampling QA/QC information.

i. Laboratory analytical results for soil and water samples.

j. Description of any remedial action that was completed.

k. Recommendations for future activities with estimated costs.

TASK 13. MISCELLANEOUS SERVICES. When authorized by the Contracting Officer, the Contractor shall provide environmental services not specified elsewhere in this contract. The Government reserves the right to accomplish this work with its' own forces or by other contracts when the Contracting Officer determines that it is in the best interest of the Government. Unit prices offered for work accomplished under TASK 13 shall be for the prime contractors and any sub-contractors allowable, allocable, and reasonable direct costs pursuant to FAR Section 31 plus any associated indirect costs allowable under the provisions of FAR Section 31.

TASK 14. OTHER DIRECT COSTS (COST REIMBURSEMENT). In the event the Government requires services, materials, or supplies to be provided under this contract the cost of which has not been provided for under any other contract line item, such services, materials, and supplies will be furnished under Task 14. This is the only Task under this contract for which the contractor will be entitled to mark-ups for overhead and profit (OH&P) to be added to the direct cost of the work since the prices offered on all other TASKS are assumed to include OH&P. Offerors are required to provide the total percentage of mark-up to be added to their direct cost for work ordered under CLIN 0014. The Government estimate of cost of services that may be ordered under TASK 14 is shown under CLIN 0014 in Clause M28.04.100.

TASK 15. BACKGROUND REVIEW. The contractor shall be responsible for understanding the existing site conditions at the DFSP’s. It is critical for the contractor to keep any existing remediation systems fully operational, and represent the Government in meetings (i.e., RAB, State). Unreasonably low review Price Per Hour and key personnel mix demonstrate that the contractor does not understand the complexity of the work.

SPECIAL NOTES:

a. Normal operating hours are from 7:00 AM to 4:00 PM Monday thru Friday except Federal holidays. The Contractor will confine his operations to these hours except under emergency conditions when there will be no restrictions on-site access. The contractor, under special circumstances, may be required to work at night along any of the off site pipelines (e.g. to minimize the adverse impact to traffic on public roads).

b. The Contractor will familiarize all of his on-site personnel with DESC safety regulations and insure compliance with them. Electrical equipment used within fuel storage and distribution areas will be suitable for operation in a Class 1 Division 1 Group D area as defined by the National Electrical Code. Internal combustion engines will be equipped with spark arrestors on exhausts. Atmosphere in the work area will be monitored with an explosimater. All work will be halted whenever readings exceed 25% of the lower explosive limit.

C. All nonusable surplus material and debris resulting from work under this contract shall be removed from the site by the Contractor. The Contractor shall be responsible for transportation and disposal of nonhazardous debris, rubbish, and nonusable material resulting from work under this contract. Nonhazardous waste must be disposed of by the Contractor off Government property except for nonhazardous soil cuttings from boring and monitoring well construction and nonhazardous groundwater from monitoring well development, which may be spread on-site adjacent to the location at which they were generated.

d. The Contractor may be tasked to properly dispose of hazardous soil cuttings and/or water generated as a result of work under this contract. Disposal shall include packaging, labeling, temporary storage, and transportation in accordance with all applicable federal, state, and local statutes and regulations. Manifests for transportation and disposal of the waste shall be prepared by the Contractor and will be signed by a Government representative. A copy of the manifest shall be provided to the Contracting Officer. Reimbursement for the disposal of hazardous waste shall be made CLIN 0014.

e. Proposals shall be based on the assumption that all work areas are accessible to rubber tire mounted equipment.

Additional compensation will be provided under CLIN 0013 or 0014 for access to those areas requiring tracked vehicle or other specialized equipment.

f. The contractor shall make use of all available resources to avoid damaging utilities to include checking "as-built" drawings, utility locating services ( Miss Utility, Underground service Alert, etc.), and electronic pipe/cable locators.

APPENDIX “A”

FACILITY DESCRIPTIONS

DFSP ANCHORAGE, AK

ADDRESS: 1217 Anchorage Port Road, Anchorage, AK 99501

The fuel terminal is located in the Port of Anchorage adjacent to commercial storage facilities. The tanks, rail car and truck transfer stands and administrative buildings have been demolished as part of the remediation process. The former tank farm occupies approximately 69 acres along the western edge of Elmendorf Air Force Base (AFB) and is bound on the south by a bluff area named Government Hill. The topography exhibits some relief with elevations varying from 20 feet above mean sea level (MSL) at the west end of the site, to 125 feet above MSL at the top of the bluff. The Alaska Department of Environmental Conservation (ADEC) approved the final cleanup action and signed the Record of Decision (ROD). A long-term groundwater monitoring program is now in place. The U.S. Army is the property owner and is in the process of transferring ownership of the property to the Port of Anchorage. The environmental monitoring and future cleanup responsibilities will also transfer.

DFSP WHITTIER, AK

ADDRESS: Whittier Terminal, Whittier, AK 99693

The terminal is located on a delta and moraine deposits along the shoreline of the Passage Canal. The site is approximately 60 miles southeast of Anchorage and is now accessible by highway vehicles as well as by water or train.

The major terminal facility is the tank farm located one mile west of Whittier. The tank farm covers about 85 acres and consists of 13 aboveground tanks. The tank farm also contains a pump station and a railcar loading rack. All terminal operations were closed in 1996. The site characterization and remedial actions were substantially completed involving steam-sparging and soil excavation efforts. A long-term monitoring program is in place but additional remedial actions could be required but not expected at this time.

INDIAN BOOSTER PUMP STATION

The Indian Booster Pump Station site is a decommissioned facility located approximately one mile north of Indian, AK and approximately 25 miles southeast of Anchorage, AK. It is located in Chugach State Park. The operation supported the movement of military specification fuels through the 61.7-mile long pipeline from Whittier to Anchorage. Several fuel releases occurred over the duration of the facility’s operation (1967-1993), the largest being a 35,700-gallon (maximum) release of JP-5/JP-8 from a pressure relief valve. Several actions were completed to characterize, contain, and remove the fuels from on-site soils and groundwater. The ADEC issued a letter on November 19, 2002 approving No Further Remedial Action Planned (NFRAP) for the site. A long term groundwater monitoring program is in place that involves an annual sampling and testing event.

NORTH POLE TO EIELSON AFB PIPELINE:

The pipeline was once the northern end of the pipeline between Haines and fort Wainwright. The only section remaining in service is a 12.25-mile section from the refinery in North Pole to the Eielson Take-Off Station at the main tank farm at Eielson AFB. The take-off station sits on about 2.5 acres at the edge of Eielson AFB. There are three sites that have been identified as having been contaminated from past pipeline releases located at Moose Creek, the take-off pad, and at Manchu Road. These sites are currently being characterized. The requirement for future remedial action is unknown.

DFSP ANCHORAGE, AK