Text version

OMB Approval 2700-0042

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0006 16 JUN 2009 SP0600-09-1213

6. ISSUED BY CODE SP0600 7. ADMINISTERED BY (If other than Item 6) CODE SP0600

DEFENSE ENERGY SUPPORT CENTER (DESC-MK)

BLDG 1621

1014 BILLY MITCHELL BLVD.

SAN ANTONIO, TX 78226-1859

BUYER: BARBARA M. PETERSON/210-925-2543

SEE BLOCK 6

8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) () 9A. AMENDMENT OF SOLICITATION NO.

SP0600-09-R-0316

X 9B. DATED (SEE ITEM 11)

2009 MAY 05

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH

IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return __ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CONTINUED ON PAGE 2 OF 4

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

BARBARA M. PETERSON

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY _____________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Computer Generated Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT 0006 Page 2 of 4

SP0600-09-R-0316

CONTINUED FROM PAGE 1, BLOCK 14

A. The purpose of this amendment is to address additional questions from industry.

B. The following answers to additional questions submitted by industry are provided as follows:

INDUSTRY QUESTION 1: What are the contractor and sub-contractor requirements (e.g. drug testing, background testing, and certifications)?

GOVERNMENT RESPONSE: All of the Requirements for contractor and sub-contractors to gain access to Tobyhanna Army Depot are as shown below plus all provisions and clauses stated in the solicitation regarding performance of work on a Government installation. The following instructions are the same instructions that were provided in Amendments 0001 and 0002 for the Site Survey:

1. NON-RESIDENT/NON-IMMIGRANT ALIENS

a. All non-resident/non-immigrant aliens must have approval prior to being permitted access to Tobyhanna Army Depot (TYAD). Such approval must be obtained by requesting access through the following: apply at the alien-resident’s embassy; proceed to the U.S. Embassy; proceed to the Department of the Army; proceed to Army Materiel Command; proceed to U.S. Communications-Electronics Command; proceed to TYAD.

b. All non-resident/non-immigrant aliens granted access to TYAD are required to be escorted by Government personnel. One Government escort can accommodate a maximum of two non-resident/non-immigrant aliens.

c. Due to limited availability of Government personnel, contractors shall not be permitted to employ non-resident/non-immigrant aliens as part of the contractor’s on-site workforce. Limited exceptions to this restriction may be considered on a case-by-case basis. Such exceptions shall only be considered where a specialized skill or trade is not otherwise available, and even under such circumstances would only be considered for very limited duration, e.g., a few hours/days. However, even if limited exception is considered, access may still be denied. Contractors whose personnel are either denied entry to TYAD or permitted limited entry to TYAD due to the security requirements pertaining to non-resident aliens/non-immigrants are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or other contractual remedies as appropriate.

d. Due to limited availability of Government personnel, visitors requiring escort may not be permitted access, or access may be limited to a certain time and duration.

2. FOR THE PURPOSE OF FORMAL ESCORTED SITE VISITS

Resident aliens (immigrants) in possession of a valid Form I-551, Alien Registration Receipt Card (“Green Card”), are not required to obtain approval as set forth in paragraph 1.a. above (but see paragraph 5. below). Such individuals must have proper identification in addition to a valid form I-551 in their physical possession at all times while at TYAD.

Individuals lacking proper identification and valid form I-555 will be denied access to TYAD.

3. SECURITY SEARCHES, IN-PROCESSING, AND SECURITY SCREENING

All persons seeking entrance to TYAD must submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All visitors and contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD Security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied.

Any Contractors who will be working on site, company representatives who will be visiting periodically, and any companies or contractors requesting or requiring TYAD badges for other business reasons must submit a completed TYAD form 648-C to their contract or depot point of contact. The completed form must be submitted at least five (5) workdays in advance of on-site performance for each employee intended for onsite performance or five (5) workdays in advance of visits or other business at the depot. Any contractor employee(s) already on site, who have not been screened, will be subject to security screening. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment

AMENDMENT 0006 Page 3 of 4 background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on site who fail screening will not be permitted further access to TYAD.

4. CONTRACTOR ON-SITE WORKFORCE – ADDITIONAL SECURITY REQUIREMENTS

A. This section is in addition to the requirements above regarding non-resident aliens (non-immigrants) for on-site performance. Prior to the commencement of performance under the contract and within seven (7) workdays of contract award, the Contractor shall submit to the Chief, Security Division, Tobyhanna Army Depot, a roster of all contractor personnel, inclusive of on-site supervisory or managerial personnel and sub-contractor personnel, that the Contractor anticipates will be performing work on-site. The roster shall indicate which individuals are U.S. citizens and which are resident aliens (immigrants). The following documentation shall accompany the roster for each individual named on the roster as a resident alien (immigrant):

a) a copy of a verifiable form of identification, such as a driver’s license or a passport; and

b) a copy of a valid Department of Justice Immigration and Naturalization Service Form I-551, Alien Registration Receipt Card (“Green Card”).

Contractors who fail to identify any and all resident aliens (immigrants) who will be used for on-site performance and who will seek access to Tobyhanna Army Depot as a worker for or through the contractor, inclusive of managerial and subcontractor personnel, may be subject to civil and criminal penalties and sanctions as well as contract remedies.

B. Within five (5) workdays of the submission of the roster and documentation, and TYAD Form 648-C, the Government will have completed the security check and the Contractor shall be notified whether all listed personnel will be permitted to work on-site. However, actual access to Tobyhanna Army Depot by the roster personnel will remain contingent upon such resident alien (immigrant) individuals presenting two (2) forms of identification as they process into the Depot through the Security building: a valid Form I-551, Alien Registration Receipt Card (“Green Card”) in addition to at least one other verifiable form of identification.

C. The roster which the Contractor submits is amendable. However, up to five (5) workdays will be required to perform a security check on any personnel added to the roster. The Contractor is urged to include contingency or “back-up” personnel in the original Roster in order to avoid delays due to Roster amendment.

D. Contractors whose personnel are denied entry to TYAD due to the security requirements are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or be subject to other contractual remedies as appropriate.

INDUSTRY QUESTION 2: Can they provide a list of approved contractors (mechanical/piping, electrical, concrete) that we can use?

GOVERNMENT RESPONSE: No, Tobyhanna Army Depot does not maintain a list of recommended contractors.

INDUSTRY QUESTION 3: Can we bring a contractor’s trailer to the site for the duration of the installation (est.

2months)?

GOVERNMENT RESPONSE: In the Government’s opinion, an on-site trailer is not necessary, because the project is not that large or for a long duration of time. However, if the contractor feels it is required, there should be no issues with setting up a trailer. However due to the limited space around the construction site, the trailer may need to be located in a different area of the Depot. Contractors should plan to get a trailer that has a power generator because Tobyhanna cannot guarantee the trailer site provided will have power available.

Please not that all contractor owned, rented or leased vehicles, trailers, and/or equipment for use on site shall be identified with the contractor’s company name, job site description, point of contact and phone number where the contractor can be reached 24 hours a day. The contractor shall ensure all referenced items are to be checked for proper operation, leaks, etc. prior to delivery to Tobyhanna Army Depot. The contractor shall coordinate with the Contracting Officer’s Representative or assigned Government point of contact prior to leaving any of the referenced items unattended at the site.

AMENDMENT 0006 Page 4 of 4

INDUSTRY QUESTION 4: Who is responsible for soil testing and remediation (if required) to 2, 000 psf?

GOVERNMENT RESPONSE: Tobyhanna Army Depot does not have any information concerning soil compaction in the exact area the conversion facility is to be built. If a soil compaction test to 2,000 psf is required to build the facility, it will be the responsibility of the offeror to plan for it and include that cost in their proposal.

Regarding remediation, the soil in that area is assumed to be clean as Tobyhanna has no records of any large spills or leaking underground storage tanks that would have contaminated the area. If at any time, the contractor encounters any contamination while digging it would constitute different site conditions and it will be dealt with it at that time, however it would not be the contractor’s responsibility to clean-up an existing contamination problem under this requirement.

C. The following sentence is added to the end of Paragraph 4.b. of the STATEMENT OF OBJECTIVES (SOO) AND/OR SPECIFICATIONS (TOBYHANNA) provided as an Attachment to Amendment 0004 dated 02 JUN 09.

If the installed laser cutter systems require a Beam Path Purge Line then a separate line to each laser will need to be ordered and installed. The Beam Path Purge Line shall be maintained at 30 psi with a flow rate IAW with laser cutter manufacturer requirements.

D. The Solicitation Closing Date and Time remains unchanged at 2009 JUN 19 / 4:00 PM Local Time.