Solicitation SP0600-08-R-0505 10-17-08.pdf
PDF 695 KB Posted
- Solicitation number
- SP0600-08-R-0505
- Issued by
-
Defense Logistics Agency Energy
About this file
Solicitation for COCO bulk petroleum storage services in the Mediterranean Sea area
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING PAGE OF PAGES
1 | 98
2. CONTRACT NUMBER
3. SOLICITATION NUMBER
SP0600-08-R-0505
4. TYPE OF SOLICITATION
[ ] SEALED BID (IFB)
[ x ] NEGOTIATED (RFP)
5. DATE ISSUE
October 17, 2008
REQUISITION/PURCHASE NUMBER
SC0600-08-0008
7. ISSUED BY CODE SC0600 8. ADDRESS OFFER TO (If other than item 7) Defense Energy Support Center 8725 John J Kingman Road, Suite 2945 Ft. Belvoir, Alexandria, VA 22060-6222 PP: 6.2 Buyer/Symbol: Steve Hull/DESC-BYB Phone: 703-767-9351 Fax: 703-767-9336/steve.hull@dla.mil
ATTN: BID CUSTODIAN, DESC-BYB, RM. 2945
Defense Energy Support Center 8725 John J Kingman Road, Suite 2945 Ft. Belvoir, Alexandria, VA 22060-6222 Fax: 703-767-0766 Verification: 703-767-9351
NOTE: In sealed bid solicitation “offer” and “offeror” mean “bid” and “bidder”.
SOLICITATION
9. Sealed offers in original and 1 (one) copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in DESC-BYB; Room 2945 until 3:00 PM local time 30 Dec 08 (Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L. Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation. See Clause L2.05-8
10. FOR A. NAME B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS
INFORMATION AREA CODE NUMBER EXT.
CALL: Steve Hull 703 767-9351 Steve.hull@dla.mil
11. TABLE OF CONTENTS
(x) SEC. DESCRIPTION PAGE(S) (x) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
A SOLICITATION/CONTRACT FORM X I CONTRACT CLAUSES 42
X B SUPPLIES OR SERVICE AND PRICES/COSTS 8 PART III - LIST OF DOCUMENTS, EXHIBITS, AND
OTHER ATTACH.
X C DESCRIPTION/SPECS/WORK STATEMENT 13 J LIST OF ATTACHMENTS
D PACKAGING AND MARKETING PART IV-REPRESENTATIONS & INSTRUCTIONS
X E INSPECTION AND ACCEPTANCE 14 X K REPRESENTATIONS, CERTIFICATIONS, 76
X F DELIVERIES OR PERFORMANCE 23 AND OTHER STATEMENTS OF OFFERORS
X G CONTRACT ADMINISTRATION 31 X L INSTRS., COND., AND NOTICES TO OFFERORS 91
X H SPECIAL CONTRACT REQUIREMENTS 41 X M EVALUATION FACTORS FOR AWARD 97
OFFER (Must be fully completed by offeror) NOTE: ITEM 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 180 * calendar days (60 calendar days unless a different period is inserted by the offer) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule. * See Clause L1.02
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
10 CALENDAR DAYS % 20 CALENDAR DAYS% 30 CALENDAR DAYS% CALENDAR DAYS%
14. ACKNOWLEDGMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. NAME AND
ADDRESS OF
CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
OFFEROR
15B TELEPHONE NUMBER 15C. CHECK IF REMITTANCE ADDRESS IS 17. SIGNATURE 18. OFFER DATE
AREA CODE NUMBER EXT. [ ] DIFFERENT FROM ABOVE – ENTER
SUCH ADDRESS IN SCHEDULE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED
20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
[ ] 10 U.S.C. 2304(c)( ) [ ] 41 U.S.C. 253(c)( )
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
IN BLOCK 25 (4 copies unless otherwise specified)
ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
26. NAME OF CONTRACTING OFFICER (Type of print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT - Award will be made on this Form, or on the Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV 9-97)
Previous edition is unusable Prescribed by GSA – FAR (48 CFR) 53.214(c)
1. An original plus one copy of this Offeror Submission Package must be returned to the Defense Energy Support Center as your offer. All documents to be completed and returned are contained in this package. See Clause L2.01, L2.05-8, and L201.02, for submission requirements.
2. Be sure to check your offer prices in Section B for accuracy and legibility prior to submission. Initial any changes. Sign and Date the Standard Form 33 (SF33) in ink.
3. If you are submitting your offer by facsimile, please limit your facsimile transmission to the contents of this Offer Submission Package and send a complete copy of the proposal by regular mail. See Clause L2.11-2 of the solicitation.
4. By submission of this package, you are stating that ALL terms and conditions of the entire solicitation are accepted and apply to your offer unless clearly stated on a separate sheet of paper.
5. Please provide your CAGE Code and DUNS number in Block 15A of the SF33.
6. Your offer must be received no later than 3:00 P.M. EST, on 30 December 2008. Facsimile proposals are authorized (See Clause L2.11- 2). Note: All facsimile proposals must be faxed to following number (703) 767-0766. Offerors are cautioned to allow enough time for the complete proposal to be received keeping in mind that other offerors may be faxing also. Signed copies of Submission Package must be received by DESC within ten (10) days after the solicitation closing date. Do not return the entire solicitation package, simply complete and return an original and one copy of the Offeror Submission Package data and Past Performance submissions as described in Clause L201.02. Your prices must be inserted in Clause B34.01in the Offeror Submission Package.
7. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the offeror’s lack of cost consciousness. Elaborate artwork, expensive paper and bindings, and expensive visual and other presentations are neither necessary nor wanted.
8. Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation. Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.
9. IMPORTANT NOTICE: All contractors must be registered in the Central Contractor Registration (CCR) database. Lack of registration in the CCR will make an offeror ineligible for award as described in Clause I1.07. Commercial and Government Entity Code (CAGE Code): (a) the offeror is requested to enter its CAGE on its offer in the block with its name and address. The CAGE code must be for that name and address. (b) If the offeror does not have a CAGE code, it may go on line to the CCR www.ccr.gov (c) Do not delay submission of the offer pending receipt of a CAGE code.
10. Notice: Any contract awarded to a Contractor who, at the time of award was suspended, debarred, and ineligible for receipt of contract with Government Agencies or in receipt of a notice of proposed debarment from any Government Agency, is voidable at the option of the Government.
11. The Government intends to evaluate proposals and award a contract after written or oral discussion with all responsible offerors that submit proposals within the competitive range (see Clause L2.05-8). The source selection decision will be based on a combination of past performance and price.
12. Care should be taken to mail correspondence to relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.
13. Offerors must include the DUNS number in the block with name and address on the cover page of offer (See Clause K1.06).
14. DESC-BYB IS THE DESIGNATED OFFICE FOR RECEIPT OF OFFERS. OFFERERS shall clearly mark all envelopes/packages sent in response to this solicitation with the words: "OFFERED UNDER SOLICITATION SP0600-08-R-0505.”
The following is the address used for the offers in original and one (1) copy of the Offeror Submission Package and Past Performance for US Post Office and US Post Office Express Mail offers only:
ATTN: DESC-BYB Bid Custodian Rm. 2945 Defense Energy Support Center
8725 John J. Kingman Road Suite 2945 Fort Belvoir, VA 22060-6222
Point Of Contact is Ms. Debbie Lloyd at (703)-767-9350 for verification of receipt.
(Do not contact the procurement official issuing the solicitation for verification of receipt.)
By 30 December 2008 at 3:00 PM Eastern Standard Time, Fort Belvoir, Virginia, USA
The following is the address used for offers in original and one (1) copy of the Offeror Submission Package and Past Performance for Hand carried Offers/Currier Delivery Service:
ATTN: DESC-BYB Bid Custodian Rm. 2945 Ms. Debbie Lloyd/Telephone 703-767-9350
Defense Energy Support Center 8725 John J. Kingman Road Suite 2945
Fort Belvoir, VA 22060-6222
Solicitation SP0600-08-R-0505 Contractor-Owned Contractor Operated Storage
Mediterranean Area
TABLE OF CONTENTS
SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS
B34.01 SERVICES TO BE FURNISHED AND PRICES (DESC FEB 1991)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C19.01 SECURITY AND FIRE PROTECTION (DESC AUG 1988)
C19.04 REMOVAL OF WATER BOTTOMS (DESC FEB 1998)
C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DESC OCT 2001)
SECTION E – INSPECTION AND ACCEPTANCE
E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF SERVICES (DESC AUG
1981)
E1.11 QUALITY CONTROL PLAN (DESC MAR 2000)
E5.03 INSPECTION OF SERVICES - FIXED-PRICE (AUG 1996)
E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DESC NOV 2003)
E22 LIST OF INSPECTION OFFICES FOR DESC CONTRACTS (DESC APR 2006)
E22.01 QUALITY REPRESENTATIVE (DESC JUL 1992)
E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DESC OCT 2002)
E34 TEST FOR SULFIDES IN WATER (DESC MAY 1987)
E36 INSPECTION (STORAGE) (DESC FEB 1970)
E50 RESPONSIBILITY FOR SUPPLIES (APR 1984)
SECTION F – DELIVERIES OR PERFORMANCE
F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DESC OCT 1997)
F1.05 GENERAL SHIPPING CONDITIONS (DESC OCT 1997)
F1.14 DETERMINATION OF QUANTITY (STORAGE) (DESC NOV 1997)
F45.01 OPERATION OF CONDUCTIVITY ADDITIVE SYSTEM (DESC OCT 1998)
F45.03 OPERATION OF FUEL SYSTEM ICING INHIBITOR ADDITIVE SYSTEM (COCO) (DESC OCT 2004) .
F45.04 OPERATION OF CORROSION INHIBITOR ADDITIVE SYSTEM (DESC JUL 1992)
F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DESC DEC 1991)
F107 STOP-WORK ORDER (AUG 1989)
SECTION G – CONTRACT ADMINISTRATION DATA
G3 INVOICE NUMBERING REQUIREMENTS (DESC AUG 1998)
G3.01 PAYMENT DUE DATE (DESC OCT 1988)
G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DESC DEC 1999)
Mediterranean Area
G9.07 ELECTRONIC TRANSFER OF FUNDS PAYMENTS - CORPORATE TRADE EXCHANGE (DESC MAR
2003)
G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE TRANSFER
SYSTEM (DESC JAN 2007)
G9.09 PAYMENT BY ELECTRONIC FUNDS TRANSFER - CENTRAL CONTRACTOR REGISTRATION
(OCT 2003)
G9.09-1 PAYMENT BY ELECTRONIC FUNDS TRANSFER - OTHER THAN CENTRAL CONTRACTOR
REGISTRATION (MAY 1999)
G9.14 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER (MAY 1999) .. 38
G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DESC MAR 1995)
G22 DESIGNATION OF THE DEFENSE FUEL REGION (DESC JUL 1997)
G148.05 SUBMISSION OF INVOICES FOR PAYMENT (SERVICES) (DESC APR 2007)
G150.11 SUBMISSION OF INVOICES BY FACSIMILE (DESC APR 2006)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H19.01 REPORTING AND CONTAINING OIL SPILLS (OVERSEAS STORAGE) (DESC JAN 1982)
SECTION I – CONTRACT CLAUSES
I1 DEFINITIONS (JUL 2004)
I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DESC JAN 1996)
I1.02 COMPUTER GENERATED FORMS (JAN 1991
I1.03-1.100 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS (SEP 2008)
I1.04 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS – COMMERCIAL ITEMS (JUN 2008)
I1.05 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (MAR 2008)
I1.06 REQUESTS FOR EQUITABLE ADJUSTMENT (MAR 1998)
I1.07 CENTRAL CONTRACTOR REGISTRATION (ALTERNATE A) (APR 2008/SEP 2007)
I1.22-1 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER
ACTIVITY (JAN 1997)
I1.19 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
I1.20 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I1.22 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
I1.24 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2005)55
I2 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
I2.06 CHANGES - FIXED-PRICE (ALT II) (AUG 1997/APR 1984)
I3 EXTRAS (APR 1984)
I3.01 PROMPT PAYMENT (OCT 2003)
I4 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
I12.01-1 DISPUTES (ALTERNATE I) (JUL 2002/DEC 1991)
I12.02 CHOICE OF LAW (OVERSEAS) (JUN 1997)
I27 GRATUITIES (APR 1984)
I28.21 TAXES - FOREIGN FIXED-PRICE CONTRACTS (JUN 2003
I33 INTEREST (JUN 1996)
I36 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (MAY 2004)
I43.01 LIMITATION OF LIABILITY - SERVICES (FEB 1997)
I72.06 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR 2000)
I90 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2006)
I95 AUDIT AND RECORDS – NEGOTIATION (JUN 1999)
I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DESC JUL 2006)
I116.01 LIABILITY FOR FUEL SPILLS (DESC OCT 1998)
Mediterranean Area
I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DESC NOV 2006)
I132.02 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997)
I147 DEMURRAGE (DESC NOV 1989)
I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DESC MAY 1987)
I198 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
I209.03 EXTENSION PROVISION (STORAGE) (DESC SEP 1991)
I209.07 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
I229 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (OCT 1995)
I285 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT
OF A TERRORIST COUNTRY (DEC 2006)
I340 COMBATING TRAFFICKING IN PERSONS (AUG 2007)
I350 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
K1.01-10 OFFEROR REPRESENTATIONS AND CERTIFICATIONS - COMMERCIAL ITEMS (ALTERNATES
I/II) (JUN 2008/APR 2002/OCT 2000)
K1.06 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (OCT 2003)
K15 RELEASE OF UNIT PRICES (DESC MAR 2004)
K15.03 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
K33.01 AUTHORIZED NEGOTIATORS (DESC APR 2007)
K45 FACSIMILE INVOICING (COCO/GOCO) (DESC SEP 1988)
K75 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)
K85 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST
COUNTRY (OCT 2006)
K86 FOREIGN TAXES (DESC JUN 1987)
K93 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992)
K94 CERTIFICATION REGARDING DEBARMENT, SUSPENSION, PROPOSED DEBARMENT, AND
OTHER RESPONSIBILITY MATTERS (DEC 2001)
K96 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (SEP 2005)
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDERS
L1.02 PROPOSAL ACCEPTANCE PERIOD (DESC NOV 1991)
L2.01 INSTRUCTIONS TO OFFERORS (RFP) (DESC OCT 1981)
L2.05-8 INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION (ALTERNATE I) (JAN 2004/OCT 1997)
L2.11-2 FACSIMILE PROPOSALS (OCT 1997)
L2.21 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
L2.28 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L5 SERVICE OF PROTEST (SEP 2006)
L5.01-1 AGENCY PROTESTS (APR 2006) - DLAD
L5.05 DISPUTES: AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (JUN 2001) – DLAD.. 95
L17 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS LISTED
IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION SYSTEM
(ASSIST) (JAN 2006)
L74 TYPE OF CONTRACT (APR 1984)
L87.03 CONDITIONS FOR MULTIYEAR OFFERS (DESC AUG 1998)
L116.01 DATA REQUIREMENTS (STORAGE) (DESC NOV 2003)
L201.02 INSTRUCTIONS TO OFFERORS (COCO) (DESC MAY 1997)
Mediterranean Area
SECTION M – EVALUATION FACTORS FOR AWARD
M2.13 EVALUATION OF OFFERS (MULTIYEAR COCO STORAGE) (DESC OCT 2007)
M43.01 EVALUATION OF OPTIONS (DESC MAY 1999)
M43.02 ADDITIONAL EVALUATION (DESC FEB 1985)
M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DESC APR 1997)
SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS
B34.01 SERVICES TO BE FURNISHED AND PRICES (DESC FEB 1991)
The services to be furnished during the period specified herein and the unit prices are as follows:
PERFORMANCE WORK STATEMENT
FOR
DEFENSE FUEL SUPPORT SERVICES
MEDITERRANEAN SEA AREA
C-1 Description and Purpose of Required Services
C-1.1 Area of Consideration C-1.2 Storage Tank Requirement C-1.3 Grade of Service C-1.4 Physical System Requirements C-1.5 Throughput Requirements C-1.6 Property Control Records
C-2 General Information
C-2.1 Product Receiving Requirements C-2.2 Product Shipping Requirements C-2.3 Berthing and Mooring Facilities C-2.4 Product Quality Surveillance C-2.5 Ancillary Facilities C-2.6 Laboratory Services C-2.7 Best Commercial Practices
C-1 Description and Purpose of Required Service:
C-1.1 Area of Consideration: the purpose of this requirement is to locate and obtain the necessary facilities and services to receive, store, and ship U. S. Government-owned petroleum products in the Mediterranean Sea area. The Mediterranean Sea area is defined as the geographic area from the West Coast of Italy, south to North Africa, east to Port Said, Egypt, and north to and including Turkey and back to the West Coast of Italy including Greece but excluding the Adriatic Sea. Ports must be on the Mediterranean or Aegean Seas only.
C-1.1.1 Purpose of the Requirement: The purpose of this requirement is to obtain commercial facilities with the capability to store JP- 8/Jet A-1 and JP-5 jet fuel in the Mediterranean Sea area at any location that can receive and ship by fully loaded Ocean tanker. Any storage offered in Turkey must also include truck loading capability.
C-1.2 Storage Tank Requirements: 1) Jet A-1/JP-8 Storage - A minimum of 1,300,000 barrels (fill capacity) and a maximum of 2,000,000 barrels (fill capacity) of storage is required. Multiple storage locations are acceptable. Minimum storage at a single location is 400,000 barrels (fill capacity). 2) JP-5 Storage - A minimum of 600,000 barrels (fill capacity) of storage is required. All JP5 storage must be available at a single port. A minimum of two tanks interconnected and isolated from other facilities and products handled within the tank farm is desired at each location. Offeror must submit the data required by Clause L116.01.
C-1.2.1 Tank Type: Offeror must identify type of construction (i.e. floating roof, Cone, etc.) for all tanks included in the offer.
C-1.3 Grade of Service: 1) Turbine Fuel Aviation Grade Jet A-1/JP-8
2) Turbine Fuel Aviation Grade JP-5
Mediterranean Area
C-1.4 Physical System Requirements: Storage and handling facilities capable of receiving, storing, protecting, and shipping U. S.
Government-owned petroleum product. In addition to the data required by Clause L116.01, offerors will be required to provide the tank cleaning and inspection data required by Clause E18 as part of their proposal.
C-1.5 Throughput Requirement: For both grades of product, Jet A-1/JP-8 and JP-5, the U. S. Government will be entitled to initial fill and final shipment of awarded fill capacity at no charge during the 5-year contract performance period. In addition to initial fill and final shipment, the Government will be entitled to allowed throughput equal to two turnovers of the awarded fill capacity during each 12-month period. (Initial fill is defined as all receipts required to completely fill 100% of the awarded fill capacity. Turnover of the awarded fill capacity is defined as the total receipts in a 12-month performance period plus the total issues in the same 12-month period, divided by two.)
C-1.5.1 Excess Throughput: Throughput that exceeds the allowed throughput quantity is considered excess throughput. Offerors shall include any additional charge for excess throughput quantities, quantities in excess of initial fill, final shipment and the allowed throughput, in their offeror submission. Excess throughput charges will be calculated by multiplying the number of barrels shipped and/or received by the per barrel price included in the offeror submission.
C-1.6 Property Control, Records and System Records: The Contractor shall provide Property Control and System Records in compliance with paragraph (a) of Clause I119.04. A Contractor-furnished computer system shall meet the current commercial standards for a computer system capable of accomplishing the data reporting and records keeping required by the Fuels Automated System (FAS) as shown in C-1.6.1; maintaining the data collection and records keeping associated with product quality surveillance (i.e., product analysis and testing reports); and the document collection associated with the Contractor’s preventive maintenance program.
C-1.6.1 The Contractor shall input inventory and sales data of Government-owned product directly into the Government’s Fuel Automated System (FAS) utilizing the Contractor-furnished company computer system via Contractor-furnished internet access (with static IP address capability) or creation of a dial-in account to the DESC FAS web server. Additional data and requirements can be found in Clause I119.04 and on the internet at, http://ports2.desc.dla.mil.mil/manuals/REF111D.htm”
C-2 General Information:
C-2.1 Product Receiving Requirements: The Contractor’s facilities shall be capable of receiving U. S. Government-owned petroleum product via ocean-going tanker/barge on a 24 hour per day, seven day per week basis at pumping rates compatible with the mode of transportation tendered (minimum 2000 barrels per hour for barges and 8,000 barrels per hour for tankers). The Contractor’s facility shall have filtration capability upon receipt of product. A Contractor representative will witness all vessel quantity measurements, and ensure vessel calculations are accurate. Quantity determination shall be by a temperature compensating meter (C-2.5.4). Calibration of the meter is the requirement of the contractor in accordance with the manufacturer’s guidance.
C-2.2 Product Shipping Requirements: The contractor’s facility shall be capable of shipping U.S. Government-owned petroleum product via ocean-going tankers/barges on a 24 hour per day, seven day per week basis at pumping rates compatible with the mode of transportation tendered (minimum 2,000 barrels per hour for barges and 8,000 barrels per hour for tankers). Note: For storage offers in Turkey, truck loading capability is also required on a 24 hour per day, seven day per week basis as required. A Contractor representative will witness all vessel quantity measurements, and ensure vessel calculations are accurate. Quantity determination shall be by a temperature compensating meter (C-2.5.4). Calibration of the meter is the requirement of the contractor in accordance with the manufacturer’s guidance.
C-2.2.1 Tank to Tank Transfer Capability: The capability to transfer product between storage tanks on a 24 hour per day, seven day per week basis.
C-2.2.2 Pipeline Shipping Capability: 24 hours per day, seven day per week basis is required if included in the offer.
C-2.3 Berthing and Mooring Facilities: The Contractor’s berthing and mooring facility shall be capable of handling a minimum 46,000 dead weight ton (DWT) vessel with an overall length of 800 feet, with a minimum draft of 45 feet at mean low water from the Contractor’s berthing and mooring facility to the open ocean. The offeror shall provide any port restrictions/requirements and harbor fees with their proposal, along with height restrictions from ships manifold to the waterline during loading/unloading. Note: The Contractor shall provide, with his proposal, detailed maximum capability of his berthing and mooring facilities for evaluation, by the Government, and be prepared to permit the Government to occasionally utilize the maximum berthing and mooring facility capability.
C-2.4 Product Quality Surveillance: No petroleum products shall be received or shipped without first determining and confirming conformance with product quality requirements. No conveyance/container shall be loaded until it is inspected by a qualified contractor person and deemed suitable to carry the intended product. Products shall be shipped on a first-in, first-out basis unless otherwise approved or directed by the QAR/COR. Non-conforming product shall be reported to the QAR/COR immediately. Anytime product is received into a tank, the tank’s contents shall be suspended from issue pending quality conformance sampling and testing. The Contractor shall ensure that certificates of quality conformance (test reports) are maintained on file for all on-hand fuel stocks.
http://ports2.desc.dla.mil.mil/manuals/REF111D.htm�
C-2.4.1 The Contractor will be responsible for maintaining the quality of the Government-owned product stored at the Contractor’s facility in accordance with the Quality Control Plan.
C-2.4.2 Quality Control Plan: The Quality Control Plan (QCP) shall provide comprehensive and detailed step-by-step procedures covering all requirements in clause E1.11, QUALITY CONTROL PLAN. Following contract award, the Contractor shall have 30 days to submit the detailed plan to the QAR/COR and Contracting Officer for review and acceptance. Written procedures must be clear and concise as to: what is done, where it's done, when it's done, how it's done, and who (position) does it. They must describe, in proper sequence, how contract compliance is achieved. For example: receipt of additives prior to blending, blending before sampling, sampling before testing, testing before release of product for shipment, etc. They must describe (and include) only those functions pertinent to contract performance and compliance. They must be reviewed upon initial award and succeeding to assure the technical and procedural requirements are adequately described. They must be dynamic (i.e., modified or extended as changes in technical or procedural requirements occur). Contractor responsibility to inspect product and services shall be in accordance with clause E28, CONTRACTOR
INSPECTION RESPONSIBILITIES.
C-2.4.3 The Contractor shall report immediately to DESC Europe, or the QAR/COR all receipts or on-hand stocks that fail to meet product quality for receipt, storage, or shipment in accordance with the Quality Control Plan. Suspected off-specification product will be isolated and shall not be released for shipment until authorized by the Contracting Officer or the QAR/COR.
C-2.4.4 Sampling and Testing: The Contractor shall sample and test in accordance with clause C19.07, SAMPLING AND TESTING OF PETROLEUM PRODUCTS. Calibration of testing equipment required under the provisions of this contract shall be covered in the Quality Control Plan (QCP). The frequency of testing may be increased by the QAR/COR as required. Considerations for increased testing are conditions of storage, age of stock and type of product. Individuals performing product quality testing shall be properly trained and qualified. If a commercial laboratory is used the Contractor shall report any non-responsiveness to the QAR/COR immediately for resolution. All laboratory reports shall be reviewed and kept on file to ensure compliance with specification requirements.
C-2.4.5 Quality During Shipments General: General loading conditions for tank trucks, tank cars, tankers and barges shall be in accordance with clause F1.05, GENERAL SHIPPING CONDITIONS. Written procedures shall be in place for product movement and related quality/quantity checks from shipping tank(s) to conveyance in order to maintain product integrity. The QCP shall provide a description of procedures to use for transfer system from shipping tank to conveyance in order to maintain product integrity, including but not limited to, procedures for properly isolating loading system from shipping tank to conveyance to prevent contamination.
C-2.4.6. Quality During Receipts of Tankers and Barges: General receiving conditions for tankers and barges shall be in accordance with clause F1.04, GENERAL RECEIVING AND STORING CONDITIONS. Before commencing with a receipt of fuel, the contractor shall assure that the shore-side is ready for discharge to ensure the quality of the product in the receipt tank(s) after receiving the product.
The terminal shall be aware of the time of the vessel’s arrival. State procedures for assuring condition of loading line (i.e., full of tested product, all air bled and pressure packed, etc.) and gauging shore tanks, both before and after discharge. Determine net quantities before discharge.
C-2.4.6.1 Verify that seal numbers as compared to the DD Form 250-1 are intact. A meeting shall be held with vessel personnel prior to discharge to discuss procedures and pumping rates to be used. Paperwork onboard the vessel shall be examined to confirm product type, quantity, and quality, and the presence of free water. If there is any indication the product does not conform to the quality requirements, discharge shall not be commenced, the QAR/COR shall be notified. Discharge shall not commence until the QAR/COR has received disposition instructions and authorizes discharge. Sampling and testing shall be performed according to paragraph C-2.4.5. Line samples are taken to assure product is the same as that being discharged (e.g.: when the line contains unlike product in a non-dedicated system, or when problems were experienced with the previous receipt). The contractor shall assure additive injectors are in working order, and that required additives are in proper quantity and quality.
C-2.4.6.2 Additional testing shall be performed if required to assure split cargoes have not been commingled. Establish procedures for the transportation of samples from vessel to the testing facility. Establish procedures for monitoring the discharging from vessel to shore tank, investigating irregularities immediately, and stopping discharging if necessary. Establish procedures for investigating discrepancies in quality (mandated if off-specification or out of testing tolerance) and quantity (mandated if shore to shore variance is greater than 0.2 percent for cargos not requiring cleaning, gas freeing or drop/strip; 0.3 percent for cargos requiring drop/strip, 0.5 percent for cargos requiring gas freeing and cleaning, or figures are suspect) on loaded conveyance.
C-2.4.6.3 Establish procedures for immediately notifying the QAR/COR when irregularities occur or are suspected and on all occasions when loading is interrupted. Establish procedures for completing and distributing required documentation prior to release of the vessel.
Documentation includes DD Form 250-1 and DD Form 250-1 continuation sheet, ullage reports, and results of quality/quantity investigations.
Mediterranean Area
C-2.4.7 Corrective Action: Actions to be followed to effect correction of any deficiency affecting product quality or quantity determination, such as handling of off-specification product. The corrective action procedures shall include notification of the COR/QAR. The Contractor is responsible for all inspection systems, Product QCP, and product quality and quantity.
C-2.4.8 Record Keeping and Reports: The Contractor shall be responsible for maintaining detailed sampling and testing logs. Each storage tank shall have a current analysis test report on file. Customers shall be provided copies of tank test reports upon issuance of product if requested. Historical product quality records shall be maintained. All laboratory reports shall be reviewed and kept on file for the duration of the contract to ensure compliance with specification requirements. These reports shall be turned over to the Government at the end of the contract.
C-2.5 Facilities: The facilities to be furnished under this requirement shall include, as a minimum, the following:
C-2.5.1 All tanks and facilities offered must meet the minimum requirements of the current AOI standards, the NFPA codes, and/or all comparable national laws, regulations, etc., applicable to tanks and facilities of the type to be provided, identify type of tank offered i.e.
floating roof, cone, etc.. The facility must be equipped with illumination to allow receipt/issue operations during hours of darkness.
C-2.5.2 Filtration Capability: The Contractor-furnished filtration system shall meet the requirements of API Bulletin 1581, Fourth Edition, January 2000, “Category M” and “Type S” for product filtration during product receiving, shipping, and tank-to-tank transfers.
The Government will reimburse the Contractor for the cost of the replacement of filter elements, and disposal of the used filter elements.
The Contractor is required to invoice the Government, certified by the QSR, for replacement filters. No fee or administrative charge shall be added.
C-2.5.3 Additive Injection System: The Contractor shall provide an injection system for additives. The Contractor’s additive injection system shall provide a separate injection system (pump and ancillary connection facilities) for the injection of each additive (i.e., FSII, Conductivity and Corrosion Inhibitor/Lubricity Improver additives) into the product during normal receiving, shipping, and tank-to-tank transfer operations. Additive injection equipment requirements for FSII, Conductivity and CI/LI are contained in Clauses F45.01, F45.03, F45.04 respectively. The additive injection procedures must be capable of frequent monitoring to ensure that the additive injection rate is consistent and within the prescribed limits.
C-2.5.4 Temperature Compensating Meters: The Contractor shall provide API approved temperature compensating meters capable of accurately measuring the volume of product being received and shipped. Calibration of the meter is the requirement of the contractor in accordance with the manufacturer’s guidance.
C-2.6 Laboratory Service: The Contractor shall provide laboratory services to test U. S. Government products to the minimum standards. If using commercial laboratory services the Contractor shall be responsible for shipping the required samples to a laboratory specified by the Government representative. The calibration of testing equipment will be IAW Clause E1.11, Quality Control Plan (DESC Mar 2000).
C-2.7 Best Commercial Practices: In the absence of any contract provisions or reference to a method, specification, or other instruction, the Contractor shall perform all services hereunder in accordance with the best commercial practices.
LINE ITEM 1001 (MUCC) (multi-year): The prices for the services and facilities to be provided during the performance of the five-year (multi-year) period (1 June 2009 – 31 May 2014) as described in the Performance Work Statement includes the following:
TANK NUMBER
TANK TYPE
PRODUCT STORED (JP-8/JP-5)
SHELL CAPACITY
(BARRELS)
FILL CAPACITY
(BARRELS)
USE CHARGE PER TANK
PER MONTH
(INCLUDES INITIAL FILL,
FINAL SHIPMENT AND
ALLOWED THROUGHPUT)
PRICE
Mediterranean Area
LINE ITEM 2001 – FIRST OPTION TO RENEW (MUCC)(multi-year): The prices for the services and facilities to to be provided during the performance of the five-year (multi-year) option to renew period (1 June 2014 – 31 May 2019) includes the following:
PRODUCT STORED (JP-8/JP-5)
SHELL CAPACITY
(BARRELS)
FILL CAPACITY
(BARRELS)
USE CHARGE PER TANK
PER MONTH
(INCLUDES INITIAL FILL,
FINAL SHIPMENT AND
LINE ITEM 3001 – SECOND OPTION TO RENEW (MUCC)(multi-year): The prices for the services and facilities to to be provided during the performance of the five-year (multi-year) option to renew period (1 June 2019 – 31 May 2024) includes the following:
PRODUCT STORED (JP-8/JP-5)
SHELL CAPACITY
(BARRELS)
FILL CAPACITY
(BARRELS)
USE CHARGE PER TANK
PER MONTH
(INCLUDES INITIAL FILL,
FINAL SHIPMENT AND
LINE ITEM 4001 – THIRD OPTION TO RENEW (MUCC)(multi-year): The prices for the services and facilities to to be provided during the performance of the five-year (multi-year) option to renew period (1 June 2024 – 31 May 2029) includes the following:
PRODUCT STORED (JP-8/JP-5)
SHELL CAPACITY
(BARRELS)
FILL CAPACITY
(BARRELS)
USE CHARGE PER TANK
PER MONTH
(INCLUDES INITIAL FILL,
FINAL SHIPMENT AND
SUBLINE ITEM 1002 - EXCESS THROUGHPUT (EXTP): In excess of allowed throughput per year or, prorated for any part year that the use of storage is limited to a period of less than one year, the contractor will be reimbursed $______ per barrel. Throughput is defined as receipts plus issues divided by two.
Mediterranean Area
SUBLINE ITEM 1003 - LABORATORY SERVICE (LABS): The Contractor will be reimbursed for Laboratory Support Services.
(See Clause C19.07)
SUBLINE ITEM 1004 – PURCHASE OF CONDUCTIVITY ADDITIVE : The Government will normally purchase and provide the Conductivity Additive. In those cases where the Contractor is required to purchase additive, the Government will reimburse the Contractor for direct costs incurred in acquiring such additive. (See Clause F45.01)
SUBLINE ITEM 1005 – PURCHASE OF ANTI-ICING (FSII) ADDITIVE: The Government will normally purchase and provide the Anti-Icing Additive. In those cases where the Contractor is required to purchase additive, the Government will reimburse the Contractor for direct costs incurred in acquiring such additive. (See Clause F45.03)
SUBLINE ITEM 1006 – PURCHASE OF ANTI-CORROSION ADDITIVE: The Government will normally purchase and provide the Anti-Corrosion Additive. In those cases where the Contractor is required to purchase additive, the Government will reimburse the Contractor for direct costs incurred in acquiring such additive. (See Clause F45.04)
SUBLINE ITEM 1007 – PURCHASE OF FILTERS: The Government will reimburse the Contractor for the cost of the replacement of filter elements and disposal of the used filter elements. The Contractor is required to invoice the Government, certified by the QSR, for replacement filters. No fee or administrative charge shall be added. (See PWS Paragraph C-2.5.2)
(DESC 52.207-9F85)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C19.01 SECURITY AND FIRE PROTECTION (DESC AUG 1988)
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and fire fighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service; U.S. Marshal's Service; and the Federal Emergency Management Agency.
(DESC 52.211-9FL1)
C19.04 REMOVAL OF WATER BOTTOMS (DESC FEB 1998)
Storage tanks for DESC use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.) Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water
Mediterranean Area dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
(DESC 52.211-9FM1)
C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DESC OCT 2001)
(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site resources may be provided by Contractor personnel or by a commercial source acting on behalf of the Contractor. The Quality Representative will not be responsible for taking any samples for the Contractor. All samples must be taken in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1).
(b) TESTING. The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall check the appropriate box below):
[ ] The Contractor will perform the tests using its own qualified personnel, facilities, and equipment. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not perform the tests using its own personnel, but will provide on a seven days per week, 24 hours a day basis, it’s own facilities and equipment for testing of product by Government personnel. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not provide its own personnel, facilities, or equipment. Instead, the Contractor will, within 24 hours after sampling, transport any sample(s) to a commercial laboratory approved by the Government and arrange for that commercial laboratory to perform all the required tests. The Government, at its own option, may direct that samples be tested at a Government laboratory under contract to the Government. In this case, transport of such samples is still the responsibility of the Contractor. (The Government will reimburse the Contractor for the actual costs of the tests performed by their commercial laboratory. All other associated costs must be included in the monthly service charge.)
All other tests found in the above referenced attachment, which are not part of a higher order analysis, shall be provided in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) clause.
(c) All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.
(DESC 52.211-9FL5)
SECTION E – INSPECTION AND ACCEPTANCE
E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT INSPECTION OF SERVICES
(DESC AUG 1981)
If any inspection or test is made by the Government on the premises of the Contractor or subcontractor, the Contractor without additional charge shall provide all reasonable facilities and assistance for the safety and convenience of the Government inspectors in the performance of their duties.
(DESC 52.246-9FE5)
E1.11 QUALITY CONTROL PLAN (DESC MAR 2000)
(a) Upon award, the Contractor shall prepare, in triplicate and in English, a Quality Control Plan (QCP). Prior to the first receipt of Government-owned product into the facility, two copies of the QCP shall be forwarded to the Contracting Officer and one copy to the assigned Quality Assurance Representative for approval.
(b) The QCP shall include the following quality control procedures employed by the Contractor.
(1) Receiving (both product and additives);
(2) Blending;
(3) Sampling;
(4) Testing;
(5) Storage and handling;
(6) Loading and shipping;
(7) Calibration program for testing and measuring equipment in accordance with ISO 10012-1, "Quality Assurance Requirements for Measuring Equipment, Part I." Equivalent local regulation, as appropriate, may be used as well. Whichever program used must include a section addressing meter proving (used to determine quantity) and must comply with the American Petroleum Institute Manual of Petroleum Measurement Standards, Chapters 4, 5, and 6, or equivalent foreign standard. For any item that requires calibration but is not covered by ASTM, API, or IP publications, the applicable manufacturer's recommended calibration method(s) outlined in the applicable industry publication shall be used if acceptable to the Government;
(8) Quantity measurement;
(9) Records and reports; and
(10) Corrective action procedures (to include, but not be limited to, procedures for notification of Quality Representative, actions to be taken on discovery of off-spec product during receipts/shipments, upgrading procedures for Contractor-caused contamination, leaks, etc.). The QCP shall also include an organizational chart of key personnel and their responsibilities and a schematic diagram of the facility with key inspection/activity points marked for each product handled.
(c) The QCP shall require that each Contractor employee be familiar with its content and shall state that it must be reviewed semiannually and revised as needed. Revision should occur when any change is made to the inspection system, when any corrective action needs to be incorporated due to quality problems, and as otherwise necessary. The Contractor shall sign and date each revision of the QCP.
(DESC 52.246-9F32)
E5.03 INSPECTION OF SERVICES - FIXED-PRICE (AUG 1996)
(a) DEFINITION. Services, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable, at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.
(FAR 52.246-4)
E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DESC NOV
2003)
(a) The Contractor shall maintain and make available upon request the following historical data relative to each storage tank provided:
(1) Date and type of construction;
(2) Name of installing contractor;
(3) Product service (past and present) and dates;
(4) Date of last cleaning/physical entry inspection and contractor's name;
(5) Structural condition based on cycle inspection at the time of cleaning or repair;
(6) Record or tank repairs;
(7) Tank dimensions and capacity;
(8) Inspection and tank cleaning frequency (date of next mandatory inspection, when tank out of service, required);
(9) Tank coating history;
(10) Tank strapping charts;
(11) As built drawings (if available); and
(12) Records of product tests and trends.
(b) At the Contractor's expense, the Contractor shall empty, inspect, and clean each bulk petroleum storage tank and dispose of all tank bottom waste for each tank furnished under this contract at the following intervals. When tank cleaning does take place, the Contractor, at his own expense, shall be responsible for providing alternate tankage and transferring the remaining product to that tankage. Such tankage shall be suitable for storing the transferred product and shall be of equal or greater capacity than the tankage being cleaned. Any proposed reduction in the storage capacity cited in the contract must be approved by the Contracting Officer in advance.
(1) AVIATION FUEL STORAGE TANKS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .