This Statement of Work (SOW) details external HVAC vent cleaning services for JBSA Randolph AFB in Building 999, scheduled for 7/2/2025. The contractor must provide labor, tools, equipment, and materials to clean external HVAC ceiling supply and return vents, indoor roofing surfaces, and metal extension beams located at or above 10 feet throughout designated facilities. The cleaning requires removing dust, debris, and potential biological contaminants using HEPA-filter vacuums, microfiber cloths, and non-toxic cleaning agents, ensuring no residue or streaks remain.
The project mandates strict safety and compliance protocols, including wearing protective equipment, using non-corrosive and non-toxic cleaning agents compliant with Air Force environmental standards, and providing Material Safety Data Sheets. Work must be performed during non-peak hours (primarily between 9:00 PM and 4:30 AM) with a schedule varying by day of the week. A mandatory post-award conference will be held to discuss zoning, equipment positioning, and other relevant topics. The Facility Manager will inspect the work upon completion, and any vents not meeting appearance standards must be re-cleaned at no additional cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Amendment - FA301625Q61790001.pdf | ||
| Updated Picture for RFQ.pdf | ||
| SOW - Vents Cleaning 2.0 Rev Aug 21 25.pdf | ||
| Vent Cleaning Questions_.xlsx | XLSX spreadsheet | |
| Picture for RFQ.pdf | ||
| RFQ Doc.pdf | ||
| WD 2015-5253 Rev. 27 07-08-2025.pdf | ||
| MFR - SPRS Nist - CO Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Project Title: External HVAC Vent Cleaning, Ceiling Vents, indoor roofing and metal extension beams Location: [JBSA Randolph AFB/Bldg # 999 ], Date: [7/2/2025]
1. Scope of Work The contractor shall provide all labor, tools, equipment, and materials necessary to clean the external HVAC ceiling supply, return vents, indoor roofing surface, metal extension beams located at or above 10 feet in height throughout designated facilities. This includes all visible surfaces of the vent grilles and immediate surrounding ceiling area affected by airflow dust deposits.
2. Description of Services
• Remove external surface dust, debris, and biological contaminants (e.g., mold or mildew if present) from each vent, indoor roofing surface and metal roof extension beams using HEPA-filter vacuums, microfiber cloths, and non-toxic cleaning agents.
• Ensure no cleaning residue, streaks, or runoff is left behind.
3. Frequency
• Service shall be performed as needed based on occupancy and facility requirements.
4. Safety & Compliance
• Comply with base safety protocols and access requirements.
• Cleaning agents must be non-corrosive, non-toxic, and compliant with AF environmental and indoor air quality standards.
• Protective equipment such as goggles and masks shall be worn during cleaning.
• Provide Material Safety Data Sheets (MSDS) for all chemicals used.
• Maintain accountability of tools and equipment at all times while on base.
5. Access & Scheduling
• Coordinate with Facility Manager to schedule access during non-peak occupancy hours:
Day Time Start (CST) Time Stop (CST)* Monday 9:00PM 4:30AM (Tuesday) Tuesday 9:00PM 4:30AM (Wednesday) Wednesday 9:00PM 4:30AM (Thursday) Thursday 9:00PM 4:30AM (Friday) Friday 9:00PM 8:30AM (Saturday) Saturday 5:00PM 8:30AM (Sunday) Sunday 5:00PM 4:30AM (Monday)
*Contractors and equipment must have vacated the building completely by this time.
6. Post Award Conference
• A mandatory post award conference will be held in person at the designated address. The
Government will provide the address after award. Attendance is required for contractor personnel overseeing the project.
o Topics will include:
▪ Zoning: At the Government’s discretion, zoning may be required due to 24/7 facility operation and the need to maintain open space.
▪ Positioning of Equipment: Relocation of facility equipment may be necessary for contractor operations. Coordination is required to ensure pre-performance relocation in designated areas.
▪ Any other relevant topics.
7. Quality Control
• Work shall be inspected by the Facility Manager or designated inspector upon completion.
• Any vents not meeting appearance standards shall be re-cleaned at no additional cost.