This document is a Performance Work Statement (PWS) for the procurement of a Voltage Regulator Test Option for the existing TESEC Model 881-TT Semiconductor Test System used by the DLA Product Test Center Division, Electrical Lab in Columbus, Ohio.

The key objectives are to expand the lab's voltage regulator testing capabilities, improve testing turnaround time, and minimize adverse effects if the current LTS-2020 system requires servicing or becomes non-operational. The PWS requires TESEC, Inc. to provide the necessary hardware, software, installation, and onsite training to add automated voltage regulator testing functionality to the existing TESEC system. The required deliverables include a Voltage Regulator Head Box, Manual Test Adapter, Low Voltage Generator, Station Interface PCB, and associated software/firmware updates. The work will be performed at the DLA facility in Columbus, Ohio, with the contractor responsible for any required travel. Payment will be made through the Defense Finance and Accounting Service upon submission of invoices through the Wide Area Workflow system.

View the file

Other files for this federal contract opportunity

Other files attached to Sole Source Voltage Regulator Test Option for our existing TESEC Model 881-TT Semiconductor Test System, newest first.
File Type Posted
TECH_SPECS_TESEC_Voltage_REG.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

1. Electrical Test Lab

25 June 2024

Requiring Activity: DLA Product Test Center Division, Electrical Lab, located at Cols, Ohio.

Contracting Activity: DLA Contracting Services located at Cols, Ohio.

2. Introduction

This is a description of the DLA Product Test Center Division, Electrical Lab, VTA, requirements for the procurement of Voltage Regulator Test Option for our existing TESEC Model 881-TT

Semiconductor Test System. It is the intent here to clearly define all required performance characteristics. In generating this statement, our objective is to end up with the necessary hardware, software and accessories needed to perform automated electrical inspections on voltage regulators using our existing TESEC Model 881-TT Semiconductor Test System. Because we want to maximize the ease of use some of the required features listed below will be specific. Our general objective is to minimize any impact to the DLA Product Test Center Division, Electrical

Lab, VTA, operations and our customers as a result of this procurement, especially with regards to test cycle time. This upgrade will decrease time required to perform electrical inspections on voltage regulators by adding an automated testing capability to our TESEC system.

3. Background

This machine upgrade would expand the EPTC’s voltage regulator testing capabilities, help improve testing turnaround time, and minimize adverse effects to voltage regulator testing services if the LTS-2020 should need serviced and/ or become non-operational. This upgrade will also simplify the automated program creation and add testing capabilities to a widely used piece of equipment.

4. Scope

Install new hardware components on our TESEC Model 881-TT Semiconductor Test System.

Update Software/ Firmware as required.

Perform onsite training for the Voltage Regulator Test Option.

5. Applicable Directives

None

6. Performance Requirements

TESEC, Inc. will: Provide the required hardware, cabling, software, initial installation and training on the Voltage Regulator Test Option for our existing TESEC Model 881-TT

Semiconductor Test System.

7. Deliverables

One 56XX-HB Voltage Regulator Head Box (Mercury free replacement for Model 9824-HBF

One 9223-DS/X Manual Test Adapter for Voltage Regulator Devices

One PT9504-42 Low Voltage Generator3 PCB (Required for V-REG Option)

One PT9913 Station I/F PCB and cables

Software/ Firmware Updates

Onsite Installation and training

9. Place of Performance

DSCC Columbus

Building 11 Section 7

3990 East Broad Street

Whitehall, OH 43213

Shipped receivable to Bldg. 17

Marked for Bldg. 11 section 7

Attn: Robert Retkofsky 614-692-2066

Work to be performed will take place at:

Building 11, Section 7

10. Travel (if applicable)

Contractor responsible for travel to Place of Performance listed in section 9.

11. Invoicing

Payment of invoices will be accomplished by payment through the Defense Finance and

Accounting Service. Invoices will be submitted to the Wide Area Workflow system in accordance with DFARS 252.232-7003 Electronic Submission of Payment Requests and

Receiving Reports and DFARS 252.232- 7006 Wide Area Workflow Payment Instructions within 10 workdays after the conclusion of each training session.

12. WAWF Acceptance DODAAC#

TE Lab is SL0700.

13. Point of Contacts

The Government Contract Officer:

TBD

The Government Contract Officer Representative (COR):

Kyle Palmer Kyle.Palmer@dla.mil

614-692-8860

DLA Land and Maritime Product Test Center, 3990 E.

Broad St., Columbus, OH Bldg. 11, Section 7 Robert

Retkofsky 614-692-2066

The Government Technical Representative/Project Manager: Name:

Jeremiah L Jones jeremiah.l.jones@dla.mil

Phone number: 614-692-8955

Address: 3990 East Broad St. Columbus Ohio 43123 mailto:Kyle.Palmer@dla.mil mailto:jeremiah.l.jones@dla.mil