This Statement of Work outlines requirements for replacing boiler controls at FCI Sandstone's Powerhouse facility in Minnesota. The project involves replacing controls on three high-pressure boilers and installing a compatible master panel with a minimum 12-inch color touch screen. The contractor must provide labor and materials to remove existing controls and install a new Siemens LMV52 system (or equivalent).
Key deliverables include installing and wiring new controls for three boilers, providing updated wiring schematics, installing a master control panel in the operator's office with BACNET integration, installing belly temp sensors and speed sensors on blower motors, programming the drive for RPM control, and tuning boilers on gas with file flow meter. The contractor must start up boilers on both gas and fuel oil, provide startup reports and documentation, and conduct onsite training. Work will be performed at 2300 County Road 29, Sandstone, MN 55072 during standard hours of 7:00 AM to 3:00 PM Monday-Friday, with other hours requiring advance approval. The associated solicitation (15B41325Q00000002) indicates this is a 100% small business set-aside with an estimated value between $100,000-$250,000 and a 245-day performance period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work FCI Sandstone
Replace Boiler Controls
FCI Sandstone is soliciting for the replacement of the boiler controls system on three (3) high pressure boilers and installing a compatible master panel with at least a 12-inch color touch screen.
The new boiler controls system will be replacing the controls on three (3) boilers in the Powerhouse at FCI Sandstone.
Contractor shall be responsible for providing labor, and all materials needed for the removal of old boiler controls and installation, programming and startup of the new boiler controls system. The new boiler control system will be a Siemens LMV52, or equivalent and compatible with a Siemens master panel and have at least a 12-inch color touch screen.
The contractor will also be responsible for:
• removing existing controls
• installation and wiring of new controls in boiler room, three (3) boilers
• provide updated wiring prints and schematics
• installation of new master panel (in operator’s office)
• program master panel (controls shall provide all operation of the boilers, failsafe mode if panel malfunctions will not interrupt boiler operation)
• provide full integration via BACNET (customer shall be able to monitor all operations of the boiler)
• installing compatible belly temp sensors (on each boiler)
• installing new compatible speed sensors on old blower motors (on each blower motor assembly)
• re-programming drive for RPM control
• tuning boilers on gas with file flow meter (which will provide better accuracy with load percentage of boiler equal to BTU/hr and will eliminate the need for separate gas flow meters at each boiler)
• contractor will be required to start up boilers on both gas and fuel oil and provide a detailed startup report
• provide FCI Sandstone all manuals, related paperwork and onsite training
Work Location: 2300 County Road 29, Sandstone, MN 55072.
Hours of operation will be Monday – Friday – 7:00 AM to 3:00 PM. Work to be completed during other times will need to be approved in advance.